Cycle parking needed for Zealand Road shops
Cycle parking is needed to serve the parade of shops on Zealand Road. This will encourage people to cycle to the shops and provide a secure means for locking bicycles.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 0 threads
Cycle parking is needed to serve the parade of shops on Zealand Road. This will encourage people to cycle to the shops and provide a secure means for locking bicycles.
Created by Shaun McDonald // 1 thread
When you are exiting the station forecourt from Ipswich station, it doesn't detect cyclists, thus never turns green for cyclists if there are no cars trying to exit at the same time.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by Shaun McDonald // 0 threads
On passing on Saturday I noticed that Lewisham have moved the block point of Verner Road to the junction, however this seems to have added and obstruction for cyclists. It could be that once the work is complete it will no longer be an issue as from the other side there is a dropped kerb.
Note in the photo the signage of the cycle route on the lamppost on the left.
Created by Jim Chisholm // 1 thread
A set of TROs at various locations have just been announce for consaltation
Created by Klaas Brümann // 1 thread
Consultation on implementing no waiting areas on Woodhead Drive.
Created by Shaun McDonald // 1 thread
Bricklayers Arms Roundabout – Subway Closure
Overview
Transport for London (TfL) is proposing to make changes to the roundabout to improve personal safety for people crossing the junction.
In June 2012 a pedestrian survey of the footway and subway system was carried out. The survey showed that between 50-70 crossing movements are made through each of the subway bores between 7am-7pm, with the majority of people preferring to use the crossings at ground level. A key factor in this is the design of the central island and subway network, which attracts crime and anti-social behaviour
The main scope of the work being proposed is to block up the subways and improve the crossings at street level. Further detail is outlined below and on the attached plan:
Decommissioning and infilling of the subway bores, ramps and stairs;
Re-paving of the perimeter footways.
Providing a new street level crossing facility to increase accessibility to the northeast corner (Tower Bridge Road) of the roundabout.
Removal of the concrete wall which surrounds the roundabout.
Improved street lighting.
Retention of mature trees and new tree planting.
The subway closure works are programmed to commence from mid-February.
If you have any questions or comments about these proposals please contact us by 8 February 2013.
https://consultations.tfl.gov.uk/streets/bricklayersarms/consult_view
Martin Lucas-Smith // 1 thread
A cyclist was convicted in this location whose pavement provision is poor, inconsistent and badly maintained.
Background at:
http://www.rtaylor.co.uk/anti-social-cycling-north-cambridge.html#comment-75411
Created by David Wilcox // 0 threads
The Foresters Arms in Westbury on Trym in Bristol is being converted to a Tesco Express.
The Council want to change the waiting restrictions by a whole one metre!
http://www.bristol.gov.uk/page/transport-and-streets/traffic-regulation-orders-tros#jump-link-3
"It is proposed that the current prohibition of waiting at any time (indicated by double yellow lines) on the south west side of Westbury Hill, which currently terminates in line with the common boundary line of numbers 73 and 75 Westbury Hill, should be extended by one metre in a south easterly direction. Delivery vehicles are permitted to wait on yellow lines while goods are being loaded or unloaded and the proposal is intended to provide vehicles being used to make deliveries to the new supermarket with sufficient space to pull in close to the kerb, to minimise interference with the movement of other traffic."
Since this will have a minimal effect on the ease of delivery to the Tesco's - remember most Articulated Lorries are 13- 16 Metres in length
http://www.intelligentanswers.co.uk/index.php?topic=2851.0
Why bother changing anything?
Looking at the google street view pic attached, parking an Artic on this road will cause major disruption and be a safety issue for the pedestrian crossing on the mini roundabout.
I wonder what the cost of raising a TRO for one metre change in parking restrictions is?
Created by WillC // 0 threads
A65 in Rawdon is wide with few side roads. It needs cycle lanes. Southbound in morning staggered queuing traffic makes if hard to wiggle down to the ring road roundabout. There is ample width and no reason not to add cycle lanes. Ther are however 3 pinch points associated with middle pestrian refuges that are dangerous. There are cut-outs into pavement area to apparenlty widen the road here but the cut-outs are very poorly surfaced and unusable. Vehicles passing cyclists at the pinch-points regularly cause danger (personally experienced several times a week, one very nearly fatally).
Created by David Wilcox // 1 thread
The junction of Wade Street and Lamb Street used to have a dedicated segregated cycle lane to enable cyclists to turn right (against the traffic on the one way Lamb Street) via a pedestrian Pelican crossing to get to the Park opposite. This park has connections to the Bristol 2 Bath Railway Path and Temple Meads.
Speaking to the Council Officer at the cycle forum on 17/01/2013, It seems that this road layout is changing. Cyclists will be able to join the widened pavement much earlier on Wade Street to cross at the Pelican Crossing. This will cut down on collisions with cyclists having to cross the traffic at the junction.
The work was not subject to a normal Council Consultation as much of the work is being done by Wessex Water who are laying some pipes in the area. Changing this junction would of cost in the of £150k and the council are only being charged £5k for the work.
No final details are available for the junction layout, so we need to keep an eye on this junction
Created by velocipedus@gmail.com // 2 threads
Partnerships and Alliances holds threads related to specific groups and constituencies
Martin Lucas-Smith // 2 threads
[Moved from another unrelated issue]
Michael Cahn writes:
"During the meeting with Public Health earlier this month, there was interest from officials when we raised the idea of a bike program in their Fenland focus area. I have now received a list of postcodes (PE13, PE15, PE16, PE7) and intend to see if we happen to have any members there, who could become the natural seed pod for a bicycle intervention program in their area, or advise on specific opportunities there."
Martin Lucas-Smith // 1 thread
[This issue moved from another unrelated thread]
We have heard there is interest in set up a cycling group in Bury. The initial focus of the person making contact is a better connection between Horringer and BSE.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Proposal
To investigate the purchase of land of the Car Park of the VOSA building adjacent to the Bristol Bath Railway Path (BBRP).
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The path narrows at its approach (inbound) to the Lawrence Hill underpass, resulting in an uncomfortable experience for path users. Purchase of the VOSA car park would allow the path to be widened through this section.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 0 threads
Proposal
To widen the path that links Trinity Street/West Street with the Bristol Bath Railway Path.
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. Many of these journeys access the railway path via a narrow path from Trinity street. The path is 1m wide, which is unsuitable for the volume of cyclists and pedestrians that use it.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
Provide a continuous, uninterrupted route with pedestrian and cyclist priority over side junctions, adjacent to Easton Way on both the East and West side. Utilise existing roads, footpaths and the verge, including the bunds.
Investigate options to improve legibility at the Lawrence Hill Roundabout and provide links to West Street/Old Market.
Rationale
Easton Way is a barrier for both pedestrians and cyclists. These proposals would seek to reverse some of the community severance that results from a road of this nature. The route will provide for variety of journeys such as; Stapleton Road to the new Library development at junction 3; and from Lawrence Hill to Old Market and the City Centre. It will also link existing routes such as the Concorde Way, Frome Greenway and BBRP to the Spine Road, providing a good North/South route.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a fully segregated two-way cycle facility on west side of Redcliffe Hill that links Bedminster Parade/York and Commercial Road/Clarence Road with Redcliffe Bridge and the Brunel Mile.
This provides a direct route from destinations and major trip generators in the south to the City Centre and begins to deliver a North/South route. This proposal would ties in with proposed improvements on Commercial Road/Clarence Road that will link into the forthcoming Local Enterprise Zone.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”