On-street Parking in Cambridge City
Issues surrounding the effect on-street car-parking has on road space, pinch points, car-dooring, interruption of cycle lanes etc.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Hester Wells // 5 threads
Issues surrounding the effect on-street car-parking has on road space, pinch points, car-dooring, interruption of cycle lanes etc.
New potholes have opened up around the drain covers on the eastbound A1214. They are on the "Straight On Lane" at the roundabout with Ropes Drive.
Created by Alistair // 0 threads
When exiting the cyclepath to join Anson Road you need to see the roundabout clearly (especially to see southbound A14 traffic turning left to join Anson Road. A large tree has overhanging branches which block the view. It's worse when it has leaves.
Created by Kevin Ablitt // 0 threads
To carry on towards Colchester Road or bear right into Belvedere Road is OK but if you are approaching the junction from Belvedere Road and wish to turn into Cemetery Lane northbound you must come right up to a blind corner and make a sharp turn into a narrow kerb edged cycle facility. This is quite a dangerous manouevre to carry out. It would have been better to have a lane entering the wide oad marked with stop lines and no-entry as it is further back from the blind turn. In fact some people may be tempted to do this, but it is both dangerous and illegal. Both the danger and the temptation to carry out an illegal manouevre could have been excluded at the design stage.
Created by MikeH // 0 threads
The contraflow on Museum St is not my favourite bit of cycle route, but given that it xcan be a busy and tricky bit, the white lines where it crosses Westgate St should at least be in good order, but they're not. An easily fixed problem you would think?
Created by Matthew Phillips // 1 thread
The main routes into the Arnison Centre are understandably pretty busy with cars and involve negotiating roundabouts. The quietest route in for bikes is via Abbey Road, the entrance in the middle of the south of the site, as used by the buses. However, the road is currently one-way. It would be good if it could be made an official entrance and exit for bikes. It lands you closest to the large rank of cycle racks outside Sainsbury's. There is sufficient width on Abbey Road to allow for cycle lanes to help connect with Newton Hall and Pity Me.
The County Durham Plan envisages another large supermarket and car-park being built immediately to the north of the Arnison Centre, across the other side of the main road, as part of the large housing development proposed. DBUG has objected to this as part of our response to the plan, as providing more local shops would encourage walking and cycling whereas these proposals will just further entrench shopping by car. The proposals appeared to include cycle access to the new housing site via an upgraded path to the west of the Arnison Centre (shown as a footpath currently) but failed to address access to the shops by bike.
The Arnison Centre could do with more cycle racks dispersed round the site, outside each of the shops. At present there is a very large number of racks, but they are all outside Sainsbury's.
Created by Matthew Phillips // 1 thread
The Durham City Integrated Transport Approach document, part of the proposed new County Durham Plan, states that it is the Council's intention to relocate the bus station in Durham and to remove the A690 roundabout by the railway station, converting it to an ordinary junction with lights.
The document can be viewed at http://durhamccconsult.
limehouse.co.uk/file/2679025 and the relevant sections are 3.49 onwards. The document mentions improving the area for pedestrians but neglects to consider the potential for cycling infrastructure improvements in the area.
The DBUG response to the County Plan (available at http://community.dur.ac.uk/m.e.phillips/cycling/DBUGResponse.pdf ) devotes a section to this matter (see pages 21 to 23).
Opportunities for better cycling infrastructure include:
* restricting vehicle access to North Road and allowing two-way cycling
* linking the station to neighbouring cycle lanes
* better connection to Framwellgate Peth and the north of the city
* remodelling the Milburngate roundabout also
* removing through traffic from the portion of North Road beyond the viaduct
We need to lobby not just for immediate cycling needs to be taken into account in the design for the new road layout, but also for future possibilities by bringing forward design of strategic cycle routes through the city, otherwise we risk losing a very rare opportunity to transform provision at a key city-centre junction.
According to the document, construction will commence in the 2014/15 financial year, with a timescale of 18 months. This means the plans must already be fairly fully developed.
Created by John Shead // 1 thread
When busy, crossing this junction is hazardous when negotiating with northbound vehicles at speeds of up to 40mph.
No indication is provided to motorists that there will be conflict.
A speed table with dragons teeth markings needs to be installed.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Andrea Bredel // 1 thread
this is one of many cycle lanes here in Ipswich that go on and off the road several times. This is very awkward for cyclists as they need to be very careful when getting back onto the road and most probably confuses drivers as well.
Created by Ned Harrison // 1 thread
Holywells Park has a section of cycle route 51 running through it, linking South East Ipswich to the centre with a pleasant and safe route down to the waterfront.
During Winter, the park is closed at dusk, sometimes as early as 4, meaning that just when the roads are most dangerous (dark and wet) cyclists are forced onto steep and busy routes either along Cliff Lane or up Bishops Hill.
The closures are largely at the request of the Park Friends group. I've spoken to them, and their concerns seem to be largely about what might go on after dark. It's not clear that there is any evidence for this, nor that the current situation of locking the main gates but leaving others would do anything to deter misbehaviour.
Keeping it open as a cycle route would ensure a legitimate presence in the park, and help provide less confident cyclists in the area with a safe route to and from town.
I'd propose either locking later, or for a trial period leaving the park unlocked.
Created by MJR // 1 thread
Discovered that this junction is "due for upgrade in the 2014/15 financial year. The budget for the traffic signal upgrade programme is essentially aimed at a like for like replacement scheme with new equipment. However we try to accommodate low cost improvements that can be implemented at the same time. ... There is scope to implement an advanced cycle stop line on Hospital Walk, although there would not be sufficient carriageway width for a lead in lane."
This is one possible way to improve westbound connectivity from the Walks and Chase through Millfleet to the town centre and southbound Route 1. The increased distance (compared to Broad Walk) is offset by light traffic, a 20mph zone and a potentially easier crossing - but at the moment, the lights make bikes exiting Hospital Walk wait a long time and then it lets hardly any out before turning red again.
Created by Shaun McDonald // 0 threads
Considering that this is very close to the National Cycle Route 51, I'm wondering why it's basically impossible to get to, on a bicycle without going on a major trunk road roundabout?
Cyclists may not be their target market, however service stations can be useful on longer cycle rides for food supplies. Also hotels can prove useful if a longer journey, touring, or realise your too tired on an overnight ride, such as the nearby Dunwich Dynamo.
Created by Matthew Phillips // 1 thread
Coming out of Durham down Shincliffe Peth on the A167, there is a pedestrian refuge at the foot of the hill, by the turning to the cycle-track which skirts the bottom of Maiden Castle hill-fort. You are expected to negotiate a 180 degree turn to access this track, at the same time as avoiding speeding cars and the pinch-point of a refuge. In the other direction, cyclists have to be cautious of using the refuge as the width of it is not sufficient to accommodate a tandem or a cycle with trailer or child tag-along attachment. Visibility is poor when crossing the road from north to south.
Improvements might include moving the 30mph limit to the foot of the hill, introducing speed cushions or a raised junction table. If the speed were reduced, the central refuge would not be needed and some of the difficulties might be avoided, but that may not be the best solution at this site.
Speed of the traffic is the main issue here, both for cyclists and the pedestrians who use the popular footpaths.
Created by Matthew Phillips // 0 threads
From the bottom of Shincliffe Peth, past Houghall College, there is a shared use pavement on the south-west side of the A177, as can be seen from the map. However, if you are proceeding south-east towards Shincliffe, it is unclear what you are supposed to do at the point shown in the photograph. It is easy enough for cyclists coming the other way to leave the road as indicated, but going south-east should you cross to the other side of the road, or continue along the increasingly narrow footway, which is not really wide enough for pedestrians and cyclists to share? There is certainly no signage further along the path to suggest that cyclists are supposed to be there.
Created by Matthew Phillips // 0 threads
On the north-east side of the A177 there is a short stretch of pavement cycle route which ends abruptly as shown in the photograph, with no dropped kerb back onto the road.
The purpose of the sign and the route are unclear. From Google Streetview you can see that there is a path leading into the sports grounds: http://goo.gl/maps/ELHci -- if that is the destination of the cycle path then why does it have an "End of cycle route" sign, if the user is intended to continue into the grounds?
Even if that's the intention, a dropped kerb would be handy as cyclists may have taken to the pavement not realising that the route was going to finish again so soon.
Created by Matthew Phillips // 0 threads
The picture shows Framwellgate Waterside, part of the national cycle network route through Durham which also connects with a major route to Newton Hall and the riverbank paths. Yet as a car driver you could be completely unaware that this is a major cycle route as there is no obvious cycling provision. Cyclists can be unsure whether they are meant to be on the road or on the footway by the river.
At the far end of the shot, the road disappears under the Gates shopping centre, where are located two car parks with a capacity of over 450 places. Despite this we have on-road car parking all along this stretch of road. Providing a fully-segregated bi-directional cycle path of decent width instead would send a much stronger signal that cycling is being taken seriously as a mode of transport. If the parking really is required, then when the passport office site is redeveloped the road should be shifted across to make more room for dedicated cycle infrastructure.
Created by Matthew Phillips // 0 threads
In the area round Crossgate, the older section of Durham City to the west of Framwellgate Bridge, there are a number of one-way streets which make cycling inconvenient. In most cases the streets have been made one-way primarily to make it easier to provide car parking on narrow residential streets or to reduce through car traffic.
These streets should be reassessed, and where possible opened up to bicycles in both directions.
Some restrictions are particularly pointless, such as the one in the photograph. In theory, if a cyclist descends South Street, the only lawful option is to turn left and pedal up Crossgate. Just beyond the no-entry sign pictured is a two-way stretch of North Road that leads from Framwellgate Bridge to Milburngate, from which cyclists could access the National Cycle Network routes to Pennyferry Bridge and local routes beyond to Newton Hall.
Created by Matthew Phillips // 0 threads
This section of NCN 70 from Claypath down to the side of Leazes Bowl roundabout has cyclists and pedestrians on separate halves of the path, rather than shared-use. This has the advantage that cyclists are more likely to be able to freewheel quickly down the hill without upsetting pedestrians. However, the cycle portion of the path is higher than the pedestrian side, with a kerb. As the path is not particularly wide, if you meet a cyclist coming the other way it is quite tricky to pass safely.
Created by Matthew Phillips // 0 threads
This stretch of footpath / cyclepath by the foot of Maiden Castle hill-fort is narrow and tends to be very muddy. It's an extremely difficult site as the river banks had to be reinforced here recently. Whether any improvement is possible is hard to assess. In the meantime, it offers the full off-road biking experience on your way to work, should you so wish! There is a case for creating a through route on the other side of the river to avoid this stretch. See http://durhamuniversity.cyclescape.org/issues/897-improvong-route-from-university-to-belmont
Created by Matthew Phillips // 0 threads
Like the roundabout at the bottom of Potters Bank, the roundabout at Whinney Hill, the approach to Durham City from the south-east, is designed for high speeds and has no provision for cyclists. The new cycle lane up Shincliffe Peth ceases when it reaches the roundabout.
From the photograph, taken in the autumn, you can see from the leaves on the road how little of the width of the roundabout is actually required by cars and lorries. This would seem a great opportunity to try a Dutch-style urban roundabout, with a wide cycle lane all round the outside and cutting the entering traffic down to a single lane. The curves could be tightened to reduce speeds and to give pedestrians more direct crossings of the roads.
Created by Matthew Phillips // 0 threads
Yes, most of the vehicles in the photograph are parked! Despite appearances they are not blocking a dedicated red-tarmac cycle path: there is in fact no particular cycling provision on Front Street. The width of the road, however, would lend itself to a wide bi-directional route being provided, segregated from the road and pavement and with priority over side-roads, with car parking spaces being retained in most cases. This would give an excellent direct route for cycle commuters from Pity Me and Framwellgate Moor, to the proposed Aykley Heads business park, the railway station, and the city centre. There may be parts of the route, such as by the Front Street shops, where this might not be possible, but on-road lanes could be provided. Currently much of the middle of the road is given over to white hatching and right-turn lanes. Some cycle parking by the Front Street shops would be good: there's plenty of car parking on-road but nowhere to lock up a bike.
Created by Matthew Phillips // 0 threads
Where the on-pavement cycle lane comes to an end, the road markings which continue the NCN 14 and 70 on-road are worn out and patchy. The design of the lane to take you southbound onto the pavement is poor, because the adjacent parking means that the traffic is usually driving straight over the top of the dedicated cycle lane in the middle of the road.
Created by Matthew Phillips // 0 threads
The exit from this retail park car park has two lanes. There are no road markings warning drivers to expect cyclists on the shared-use pavement which is part of NCN 14 & 70. This section of pavement was recently rebuilt. Why could we not have a raised table at the exit, giving priority to cyclists and pedestrians here? Why does the through-route for cyclists have to give way to the car park exit? While the shared use pavement is welcome, the lack of priority is what tends to lead to experienced cyclists taking to the road instead, as it can actually be safer as well as quicker. If cycling infrastructure is more dangerous or slower than the road alternative, it is not worth installing.
Created by Matthew Phillips // 0 threads
By the Tesco superstore off Dragon Lane, the road junction was recently rebuilt. On the west side of Dragon Lane is a shared-use pavement which forms part of NCN 14/70. While cars travelling north on Dragon Lane can go straight across on a single phase, cyclists are expected to dismount, and cross with pedestrians at a two-stage crossing. The object is to maximise the flow in and out of the Tesco superstore car park, which is the only purpose of this junction. Designing the junction to give greater priority and convenience to cyclists and pedestrians would help shift the balance back to sustainable living.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."