Perne Road roundabout
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
A section of the road now has a TRO restricting all motor vehicles without a VIP parking pass. Cycling is permitted on this section, but there are no signs to confirm this. The road still part of NCN55.
Created by David Earl // 5 threads
There is a great shortage of cycle parking in Cambridge City Centre. The cycle parks have been very successful, but the promised 500+ spaces at Grand Arcade actually only delivered around 250.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Martin Lucas-Smith // 1 thread
Discussion of cycle training issues in Cambridgeshire.
Created by David Earl // 1 thread
Dear CCC,
In light of the recent news of a cyclist being injured by a motorist whilst on the off road cycle path on Barton Road (http://www.cambridge-news.co.uk/Cambridge/Driver-who-knocked-over-cyclist-keeps-his-licence-16012012.htm) I was wondering if the CCC is campaigning for a reduction in the speed limit along Barton Road? I think (but am not categorically sure) that Barton Road remains the last main road into Cambridge with a 60mph limit.
Barton Road suffers from two problems with speed: heading out of town motorists accelerate from 30 to 60 after the speed camera; and heading into town motorists are coming off the motorway and are used to such speeds and continue to drive way over the 60 limit.
According to the http://www.crashmap.co.uk/ Barton Road has seen several fatalities and many accidents recently.
Sincerely
Barnabas Baggs
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Moss // 3 threads
Planning application submitted for housing near the primary school and a mixed use housing plus retail development at Unwin Square, east of the Permier Inn. Concerns about provision for cycle parking contained in the plans submitted.
Created by Robin Heydon // 1 thread
Proposed package: Streamlining bus services through Cambridge city centre
A package of measures including some of the following is proposed:
• Cambridge Core Scheme extension – potential remove all traffic but buses and cycles from St Andrews Street north of Emmanuel Street through the day.
• Address taxi overcrowding in St Andrews Street.
• Remove / relocate some on-street parking in Jesus Lane.
• Bus priority measures along Chesterton Road
• Improved bus stop infrastructure in Hobson Street and Jesus Lane.
• Removal of some parking on Histon Road and Station Road.
• On Street ticketing at busy or constrained boarding points to reduce bus standing time and pedestrian congestion.
• Enhanced enforcement of infringements on key bus routes and stops.
• Rerouting of some buses away from Bridge Street / Magdalene Street.
• Park and ride capacity enhancements
• Rural interchange enhancements on longer routes benefiting from the city centre improvements.
ATM proposed next to Hills Road cycle lane
Martin Lucas-Smith // 3 threads
The LSTF is the funding from government for sustainable transport for the region. This issue covers discussion of the bid.
Martin Lucas-Smith // 2 threads
Planning application by Sainsbury's on Mill Road - various issues.
Created by Simon Nuttall // 1 thread
I'll hang a thread off this general issue where we can share news - at least while we transition to using this new system.
Created by Heather Coleman // 1 thread
The planning application has the promise of new, extra cycle parking, which should be good news. However, details are scant to say the least and as new jobs will presumably be created, I fear it will do nothing to alleviate the chronic shortage of cycle parking on site, especially at this location at the rear of the Concourse, and a place of choice to park if you have cycled from Trumpington.
Warrington Cycle Campaign have produced a leaflet aimed at improving the mutaul understanding of cyclists and bus drivers points of view.
It is called "Bus Drivers & Cyclists in Harmony"
We hope to promote better relations between the two groups via a similar leaflet. The key goal is safety but enhanced respect by both parties would be of benefit.
We have serious concerns over the standards of driving of certain classes of vehicles in Cambridge.
We have an opportunity to push for both bus companies and and local authorities to train their drivers to a higher standard
Under the 'Certificate of Profession Competence' drivers of certain classes of vehicle are required to undertake 'continuing training'
There has been an article in Local Transport Today about training in London. see:
http://www.transportxtra.com/magazines/local_transport_today/news/?id=29476&StartRow=1
"A COURSE designed to cut the number of lorry accidents in urban areas, particularly those involving cyclists and pedestrians, has gained industry accreditation.
The ‘safe urban driving’ (SUD) course developed by Transport for London and London boroughs has been accredited by the Joint Approvals Unit for Periodic Training, the body set up by the sector skills councils for freight and passenger transport to manage the driver Certificate of Professional Competence (CPC). "
"EU directive 2003/59 requires lorry and van (over 3.5 tonne) drivers to obtain a CPC by completing 35 hours of training every five years. The requirement came into force in 2009, so the first deadline is September 2014. "
"The second half of the course sees the lorry drivers get on bicycles and go on-road to understand how cyclists position themselves on the road, and how to drive in the presence of cyclists. This module was developed by Cycle Training UK for the London Borough of Lambeth. "
I've already pointed out this scheme to the cycling officers
It may be that we can get the LA's to approach Stagecoach on this issue and it could form part of any 'Quality Contract'
Created by Jim Chisholm // 1 thread
The County is proposing a 'controlled parking zone' to cover a wide area around Addenbrooke's. The exact limits are to be discussed, and issues will arise in area of new housing where the roads are yet to be adopted.
An initial meetimg for stakeholders is to be held at Hills Road VI form college on Thursday February 2nd from 18:30 to 20:30
The map shows the area being studied
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."