Adam and Eve rat-running
A proposal has been put forward to add bollarded access in this cut-through from Adam and Eve Street through to Burleigh Street, to avoid rat-running in the area.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 1 thread
A proposal has been put forward to add bollarded access in this cut-through from Adam and Eve Street through to Burleigh Street, to avoid rat-running in the area.
Martin Lucas-Smith // 1 thread
The Newtown area (basically between the Botanic Gardens and Lensfield Road on the inner ring road) is a mass of one-way streets, rat-running vehicles, children being dropped off to the schools rather than cycling, and so on.
We should take the opportunity to work with locals to improve the area.
Created by Bracken VanRyssen // 0 threads
The humpback bridge over the stream at this point is highly unsuitable for a well trafficked bicycle route, the design with extremely steep access from both directions as well as areas of mud make the bridge quite a pain to cross. This is especially problematic for bicycles with small wheels or heavy loads, that may struggle with entry and exit of the bridge. An ideal solution would be a longer bridge with gentler slopes to minimise damage to bicycle wheels and smooth out the transition. No doubt this bridge also causes problems for less-able people and represents a significant barrier which is enough of a reason in itself to undertake improvements.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Martin Lucas-Smith // 1 thread
15/0398/FUL | Erection of student accommodation with 321 student rooms (following demolition of existing buildings), together with ancilliary accommodation comprising common/study rooms, porters lodge, laundry room, plant room, bin and bike enclosures, landscaping and associated infrastructure including a sub-station. | 8, 10 And 10A Cheddars Lane And 351-355 Newmarket Road Cambridge Cambridgeshire CB5 8LD
Usual issues to check out:
- Cycle parking (number, type and positioning)
- Access, in particular need for improvements to Newmarket Road
Created by Colin Wing // 7 threads
This is part of a proposed cycle superhighway from the Finchley Road into Central London.
It will become more attractive after the modification of the Swiss Cottage gyratory system in Camden.
See the discussion threads for details on the sections in Westminster, Camden and Swiss Cottage
Created by Bracken VanRyssen // 0 threads
The cycle path alongside the University of Birmingham campus seems to be a magnet for broken glass, especially in the area opposite the petrol station and Oakfield Road. Avoiding all the broken glass is quite a trial especially for those with less robust tires. Regular sweeping would go a long way towards improving the quality of the route.
The path that runs across the width of Cassiobury Park from Stratford Way to Cassiobury Park Avenue has not been resurfaced since I've been in Watford (13 years). Very poor condition especially in the vicinity of the j/w what seems to be known (on Google Maps) as Central Avenue.
The problem is more than its surface - the path is far too narrow, esp in view of the high use it gets from cyclists and pedestrians.
Created by Kevin Ablitt // 1 thread
It is a constant problem that car drivers think it is acceptable to park in this particular spot.
The single yellow needs upgrading to double yellow lines ( is this enforced anyway ) OR we need hard infrastruture design which prevents such selfish behaviour.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
The surface of the cycle path, which is also National Cycle Route 1 through Bourne Park is of an extremely poor quality. This really needs to have a smooth tarmac surface, and potentially widened.
I would expect kids to be learning to ride a bike along here, however that's not currently possible as its' touch going for an adult to cycle here never mind a child who is just learning to cycle. If this path is upgraded it would be even better if the surfacing was extended to create a circle around the park which is reasonably smooth, so that people can learn to cycle by cycling around this park.
Created by Donald Noble // 1 thread
A trench has been dug across the cycle path close to the substation, and has not been properly reinstated, leaving a 0.5m wide 5cm deep rut right across the tarmac path,
This should have been reinstated properly at the time, but would be good if it could be fixed soon
Created by Bracken VanRyssen // 1 thread
The pavement and marked cycle path is in pretty bad shape due to root damage and weathering and could really do with some resurfacing. As well as this the numerous side roads and the narrow pavement sections beyond the bus stop create numerous conflict points.
Created by Bracken VanRyssen // 0 threads
Cycle infrastructure is disjointed and confusing, there is no clear and consistent level of infrastructure along the Stratford route. What little infrastructure there is, is mostly made up of narrow shared-use pavements. Unless you approach Shirley High Street from the west (through the park), safe access to the shopping district by bicycle is limited.
Created by Monica Frisch // 2 threads
The site used by Ridgeons (builders' merchants) on Cromwell Road in Cambridge has been identified by Cambridge City Council as a potential location for new housing in the future. As a part of this, Ridgeons and their team of consultants, along with Cambridge City Council, are working to develop a document called the Ridgeons Cromwell Road Development and Planning Brief (Supplementary Planning Document, SPD). This will provide guidance on access, land use, building types, open space and character for all future planning applications on the site.
Created by Stephan Matthiesen // 0 threads
The hill from the Braidburn Inn across Liberton Road up Kirk Brae is very difficult (steep and much traffic).
Cyclists should be allowed to use the pavement from opposite the Braidburn Inn (at the end of the cycle lane), then cross Liberton Rd at the pedestrian lights (to be converted into toucan) and then continue on the pavement up Kirk Brae, at least to the Fire Station.
Dropped kerbs are needed:
- at the end of the cycle lane in Mayfield Road
- at the end of Mayfield Rd, before the lights
- at the bottom of Kirk Brae
- at Double Hedges Row
Many cyclists already use the pavement in this way, but lack of dropped kerbs makes it difficult (and of course it would be better if it's made legal).
Created by Simon Nuttall // 2 threads
The Speedwatch scheme allows the public to get actively involved in monitoring the speed of vehicles travelling through their neighbourhood. It is used in areas where speeding has been identified as a priority at quarterly neighbourhood panel meetings. The scheme is run by the force alongside the Cambridgeshire and Peterborough Road Safety Partnership. It is about educating motorists in the law in relation to speeding and monitoring any trends in speeding in neighbourhoods.
Volunteers are trained to use speed indicator devices which displays vehicle speed. The registered owner of any vehicle seen exceeding the speed limit is sent an advisory letter from their local neighbourhood policing team, explaining that speeding is unacceptable to the local community.
Created by Stephan Matthiesen // 2 threads
Have a new shared path on the Est side of Inch Park, connecting Glenallan Drive, Old Dalkeith Road and Cameron Toll.
This would be a very useful connection that allows cyclists (and pedestrians) to avoid parts of busy Old Dalkeith Road.
There is no real reason why a proper path can't be built there; dog walkers walk along the suggested route all the time (on the grass).
Created by Stephan Matthiesen // 2 threads
There is a strange muddy puddle where the path from Burdiehouse Burn meets the footpath along Burdiehouse Rd., and the right-angle corner is very narrow anyway.
The paths should be connected in a more gentle curve - there is a desire line on top of the wall in the left half of the image.
This is an important point as the footpath does not continue along Burdiehouse Rd northwards, so all cyclists and pedestrians have to walk through the puddle.
From email:
Nottingham City Council (Amesbury Circus Area, Aspley, Nottingham) (Prohibitions of Waiting and Entrance Clearway) Traffic Regulation Order 2015 (TMP 7109)
Please find attached a consultation letter and associated Drawings, Numbers TM/TMP7109 which relates to the above areas, Amesbury Circus Area, Aspley , Nottingham - Traffic Regulation Order (TMP 7109). If you have any concerns in relation to the TRO proposals can you please let me have your comments by 31st March 2015.
Created by Stephan Matthiesen // 3 threads
Create a cycle path on the pavement or make it shared use, from after the bus stop in Liberton Road around the corner to the junction Gordon Terrace/Esslemont Rd.
This would allow cyclists who want to turn left from Liberton Rd towards KB to bypass the traffic lights, then continue onto Gordon terrace or rejoin the other traffic in Esslemont Rd.
Currently it's dangerous because:
(1) this route is uphills and cyclists are going slow, but cars turning left can't see ahead if there are cyclists.
(2) cyclists have to wait at the light and then are in front of cars, so drivers get quite annoyed having to trundle along until safe overtaking is possible in Esslemont Rd, many attempt dangerous overtakes earlier. If cyclists can bypass the red lights they have a chance to go up the difficult bit during quieter phases
(3) cyclists who are not in the ASL (but also those in the ASL) are in danger of being left-hooked (see also http://edinburgh.cyclescape.org/issues/1532-segregate-the-feeder-lane)
Created by Rosie Downes // 11 threads
TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west
The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.
To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)
Ongoing work on the development of the North West Cambridge site results in cycle paths being blocked at random intervals, and inappropriate pedestrian-oriented alternative provision makes the situation more, not less, dangerous for cyclists, forcing us into a narrow roadway with fast-moving traffic. With the increase in heavy traffic, road surface is also deteriorating rapidly - increasing numbers of large potholes, which can easily lead to pinch flats and other mechanical failures on dangerous, narrow sections where lack of cycle path of pedestrian walkway means here is no escape route.
Created by Stephan Matthiesen // 1 thread
Dropped kerb needed at the end of this footpath.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.