Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • Addenbrooke's bike group meeting report

    Richard G // 4 threads

    Hi everyone

    A short report back from yesterday's BUG-WAG
    (bicycle user group - walking action group) on the Addenbrooke's campus

    The junction of Adrian Way & Long Road had the origional plan for a bike right turn island rejected on the grounds of pedestrian safety. Nothing was forthcoming as to any change

    units and departments are being encouraged to take part in the Cambridge Cycle Challenge

    After the meeting with some campaign members about the path/junction by outpatients carpark, new plans are being drawn up without the barrier & in effect, just a T juntion. Not sure if planners will insist on 'STOP' or 'Give Way' signs. We hope to be informed.

    there are some changes to existing cycle parking, some racks being relocated away from the main drag to make more disabled parking spaces. Railings around the front entrance are being removed with the effect that bikes chained to them will have to go somewhere else. The trust seem to think that they have an excess of spaces for bikes, but that cyclists dont always travel further to use them. I'm really not convinced they have an excess & will be doing another sitewide count of bikes/spaces soon
    There still does not seem to be any bigger plan to place cycle parking as the site developments happen, rather just a piecemeal approach where everyone does their own thing.

    A (i think big) issue that was brought up is where 'The Forum' development works & access plans were seen for the first time.
    The Forum is the building that will go on the carparks opposite ATC, and around the Frank Lee. A bus stop will close, foot paths will close and the most concern to the group was that hoardings will go up on the actual curb line. We thought this would make a very intimidating route to cycle eastbound along Robinson Way. We are expecting a scan of the plans & I will circulate (as part of a new thread)

    There were some other info bits about the Hills Road changes (happening), cycleway lighting, the OWL bike maintenance people's hours and the potential impact of the Park & Ride charges starting next week

    Richard

    Please sign in to vote.
  • Rochdale Canal Towpath Gating

    Created by Jonathan Keenan // 1 thread

    Although this is not a cycle path this should be monitored. MCC, Fire and Police are proposing gating and 12 hour closures of this section of path. This is due to a number of fatalities by drowning.
    This is a fairly interesting and somewhat unpleasant section known as the Undercroft.
    I will scout the site to see if there is an argument for creating a cycle path to encourage more people to used this area with the proven argument that more people creates safer environments. I suspect this will not be practical but worth checking before a right of way is lost.

    http://www.manchesterconfidential.co.uk/News/Rochdale-Canal-Towpath-To-Be-Gated#.U8TOROVtDHg.twitter

    Please sign in to vote.
  • Pinewood Park to Fernhill School route

    Created by Charlie Halliday // 1 thread

    Proposed alternative route for cyclists on quiet roads and existing footpaths from Pinewood Park to Fernhill Schools avoiding Sandy Lane and Chapel Lane. Would require improvements to footpaths to make them safe for cycling and a change of status to SUP. Also requires a safe crossing on Fernhill Road. Proposed by Cllr Muschamp.

    Please sign in to vote.
  • ramp for pedestrian bridge over Manor Rd level crossing.

    Created by MB // 1 thread

    A cycle ramp on the pedestrian bridge over the Manor Rd level crossing would be a great idea. Cyclists could continue their journey by crossing the bridge and ensure they were out of the way of drivers impatient to set off when the barriers rise. If done correctly, ramps would ensure that parents with buggies could also cross the bridge - getting them & their youngsters on their way & out of the pollution generated by the drivers who rarely switch off engines while waiting for the barriers to rise.

    Please sign in to vote.
  • Please sign in to vote.
  • NCN 15 Trent Bridge to Clifton proposed

    Created by BrianInBeeston // 1 thread

    Proposed route of NCN 15 from Trent bridge to Clifton, following the south bank of the river Trent. The idea under discussion is for the route to be temporarily signed by Sustrans volunteer rangers in the first instance. there are also plans to sign an NCN 15 to NCN6 link route via Wilford Toll, Birdcage walk, Lenton Lane, Abbey St. NCN15 from Clifton west can be signed once the A453 works are complete.

    Please sign in to vote.
  • Hipper Valley Trail: Walton Dam and Somersall Park Poor Surface

    Created by Nicola Peck // 1 thread

    This well-used trail is in desperate need of resurfacing. During spells of wet weather, it has large puddles at regular intervals and there is a particularly huge "mud bath" at the western end of Walton Dam just by the entrance to the woods. Currently (July 2014) the mud bath is reasonably, but not completely, dry but as recently as June it has been very muddy and was terrible over winter.

    This is one of Chesterfield's major cycling routes and these conditions make it unreasonable to use it for transport journeys (ie. commuting and shopping) in normal clothes because the bike gets caked in mud and it splashes over your shoes and trousers, even with mudguards.

    Alongside Walton Dam, I believe this path is supposed to be nominally 3 metres wide but vegetation has grown into the gravel surface making it significantly narrower (single file) in places.

    The sloped tarmac section at the Walton Road end is suffering encroachment from overgrown vegetation and there is an unnecessary pinch-point part way down (a row of wooden posts) which could be opened up with perhaps only a single post if really necessary, or ideally none at all.

    In Somersall Park, immediately to the south of the river bridge, there is a particularly rough patch of surface which, ironically, is the most recently resurfaced section of path. It's so incredibly rough that you have to be extra careful and slow if carrying delicate items like a laptop or fragile shopping (eg. soft fruit or eggs).

    Please sign in to vote.
  • Jones "Parkland" development, Cheadle

    Created by David Butler // 1 thread

    Planning application submitted to Stockport Council re. Phase 4 of the "Parklands" development at Three Acres Lane (ref. DC053394). The proposals seem to purely focus on motor transport via the A34 as the means of access/egress. CycleWilmslow have long campaigned, with support from some CycleStockport members plus CTC and Sustrans for a traffic-free route from Cheadle to Handforth. This would go through this site (there is currently a footpath which would require minimal work to upgrade to bridleway standard).

    Please sign in to vote.
  • No through route from Midland Terrace to estate cycle routes

    Created by Simon Redding // 0 threads

    The Jepson Road estate has great cycling infrastructure, but when you get to the west end of it, the path peters out and ends in a fence. Lots of cyclists then carry their bike over a fence and round the end of a culvert to Hartfield Close, but it would be better to just have a cycle gate in the fence straight on to Midland Terrace, which is likely to form part of NCN67 soon.

    Please sign in to vote.
  • No top surface on this path

    Created by Simon Redding // 1 thread

    Since this site was abandoned by the bankrupt developer and not adopted by the council the path surface hasn't been put on and the path is a bit rough. Weeds are now starting to grow through the tarmac base layer.

    Please sign in to vote.
  • Chiltern Drive, Berry Lane Estate to Shepherd Primary School, Mill End

    Created by Peter Loader // 1 thread

    This proposed Berry Lane Estate to Shepherd Primary School, Mill End cycle route follows:

    * Chiltern Drive.
    * Part of Shepherds Lane.
    * Part of the south east path through King George V Playing Fields, Mill End.
    * The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.

    Please sign in to vote.
  • Maple Cross to Shepherd Primary School, Mill End

    This proposed Maple Cross to Shepherd Primary School cycle route follows the existing Maple Cross to Rickmansworth route as far as the Long Lane/Eastwick Crescent junction in Mill End.

    The new part of the route consists of:
    * Part of the new Long Lane residential service road.
    * Part of Kenwood Drive.
    * Part of the old Long Lane road.
    * Rickmansworth Footpath 012 (upgraded to a bridleway).
    * Beresford Road.
    * Part of Penn Road.
    * Part of the south east path through King George V Playing Fields, Mill End.
    * The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.

    Please sign in to vote.
  • Allow 2 way cycling along Stoke Quay and New Cut West

    Created by Shaun McDonald // 1 thread

    I've heard that there's a number of people who work in IP-City Centre who don't like cycling along the main road (Hawes Street, and Vernon Street) due to the traffic to get into town, or to the station, and would much prefer to take the quieter riverside route which has very little traffic. Dock Street already is two way for cycling, thus this would be a case of expanding the ability to cycle both directions.

    Please sign in to vote.
  • Victoria Rd / Headingley Ln

    Created by TMiles // 0 threads

    Vehicles trying to turn right out of Victoria Road at this busy intersection often partially block the outbound lane of Headingley Lane (A660), causing an obstruction to all road users and forcing outbound cyclists to move into the main flow of traffic. The exit of this street should either be physically blocked to motorised vehicles or controlled by traffic lights in coordination with the nearby crossroads.

    It must be recognised that any measures reducing the appeal of Victoria Rd to eastbound motor traffic may displace the problem to other access points onto Headingley Lane (for example its junction with Buckingham Road). It may be wise to first analyse the source of this traffic flow and encourage more appropriate routes.

    Nonetheless, action does need to be taken as the junction in its current form is a risk to the relatively high numbers of cyclists on this radial route.

    Please sign in to vote.
  • Park Road Contraflow

    Created by Sarah Wood // 0 threads

    This contraflow infrastructure is hazardous for several reasons: the path is very narrow - realistically around 0.5m wide, the cyclists is riding in the gutter, at risk of being doored and catching wing mirrors. What caught me out was a vehicle travelling North and turned right to access an entrance. Our sight lines were blocked by parked vehicles in parking bays to the right of the cycle path. Until this situation is addressed cyclists will continue to be vulnerable along this section of the road.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top