Anchor Road crossing
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by kirbyjames // 0 threads
The short length of narrow cyclepath contains two black bollards. (presumably to stop small cars using thbe cyclepath) These present a hazard to cyclists - we are aware of three cyclists havingh been injured hitting them.
It is recomended that they be removed.
Martin Lucas-Smith // 1 thread
This area of town has lots of children having to cycle round the main road because there is one-way cycling - we should get the council to make it two way.
Created by Rohan Wilson // 1 thread
An application for 148 homes 11/0008/FUL was refused by Planning Committee(against officer recommendation) on 4 April. Cycle parking "storage" is generally less easy to reach than car parking, and it appears that for the central blocks it is proposed in a shared basement area - I haven't found the drawing for the basement.
There is no access to the site except by the narrow road around the existing Westbrook office block - the site is a deep enclave.
The issues for cycling are probably virtually identical to previously. One of various reasons for previous refusal was "...lack of transport mitigation measures..." and the Highways provisional comment on the current one outlines concerns. I fear that cycle and pedestrian access issues were not previously considered grounds for refusal and that therefore we might be fighting a lost cause... have contacted the officer about this, and hope to submit a comment for Sustrans.
Created by cobweb // 8 threads
There have been problems before with unsatisfactory cycle parking and obstruction of the paths across this busy green space. New people are providing the ice rink this year though.
Created by Chris Lowe // 1 thread
Plans submitted for consultation on improvements to the A38 corridor. http://www.birmingham.gov.uk/LSTFBristolRoad
Created by Chris Lowe // 0 threads
This looks like it was designed originally as a cycle path - because of the way the kerbs are placed.
Would be a good cut-through for bicycles. Needs re-assigning as shared use, plus a dropped kerb at the Gilby Road junction.
Created by Chris Lowe // 1 thread
Monument Road is a serious barrier to cyclists using this designated cycle route. There is a pedestrian crossing, just down Monument Road, but the pavements are too narrow for shared use.
There needs to be a crossing to enable cyclists to move easily along the cycle route.
Created by Chris Lowe // 0 threads
This is signed 'no cycling'. It is a nice route to access the shops on the junction of Hagley Road / Monument Road, as it has very low traffic.
Needs to have cycling permitted, plus dropped kerbs at the north end for access.
Created by Chris Lowe // 0 threads
Nice road closure, but there is poor provision for bicycles to get through. The kerbs need work to be done, to allow bicycles to get through.
Created by Chris Lowe // 0 threads
Good road-closure, but there is poor provision for bicycle permeability. Needs gaps for bicycles (up to width of cargo bike / trike) to fit through.
Created by velocipedus@gmail.com // 3 threads
On Hills Rd Bridge (etc) a large message sign displaying 5 lines of text and two screens warns of delays because of upcoming building work in central Cambridge (Lensfield Rd etc)
I am minded to write to the city early on Monday
Re: Message signs warning of congestion due to street works
Dear Madam, Sir,
We would like to make an suggestion regarding the text displayed on the mobile message signs currently warning of major road works and congestion. Our suggestions would be to add the words “Thanks for cycling” and “Try the bicycle to avoid delays” (alternating).
We believe it is entirely appropriate to use any major road-works as an opportunity to encourage the use of active transportation, because it is proven to reduce congestion. Such messages will also deliver an important message about the status of cycling in the city. The expression of gratitude expressed in the first suggestion is especially important, as it sets a tone of public appreciation.
We would also like to remind you that a recent Freeway closure in Los Angeles was widely advertised by local authorities as “Carmageddon” and residents were encouraged to participate in local bike rides, organised by the regional transportation authority (METRO), to overcome the expected delays. Given our own little Carmageddon, should Cambridge not do the same ?
----
Feedback please, contacts, CCs to the press, Travel to work, etc
Created by Matthew Phillips // 1 thread
There is no obvious public cycle parking on Palace Green, the key tourist destination in Durham. While there is some cycle parking, it is well hidden and un-signposted. Some racks along between the trees at the Castle end of Palace Green would be ideal.
Created by Simon Hewison // 0 threads
A parade of shops that serve the local community have nowhere suitable to park bicycles, not even any useful street furniture. Having a sensible cycle rack here would encourage people to cycle to these shops rather than drive.
http://www.cambridge-news.co.uk/News/Development-plan-for-Mitchams-Corner-unveiled-28092012.htm
In summary: Staples and Lloyd’s bank are due to be demolished in this redevelopment. There's a consultation meeting next Friday from 2-7pm and on Saturday from 10am - 2pm at The Tivoli pub which is opposite.
Created by velocipedus@gmail.com // 1 thread
Jim C raised this in an email to SUSTRANS: ...if staff from the London office would find an 'Awayday' in Cambridge an interesting outing?
> Cambridge can be great in the spring, and if a trip is in term time
you can see just the sorts of diverse cycles and cyclists (diversity)
>
> I'm sure we can create a good itinerary, covering innovative
locations, tourist hotspots, and key cycle facilities.
>
> As I said at the time, why go 'Dutch' to see examples of cycle
culture, when in Cambridge you can see what can be achieved in the UK.
Created by velocipedus@gmail.com // 1 thread
International Cycling Safety Conference 2012, 7 Nov
Location: Helmond, The Netherlands
Costs: 150 Euro
Twitter hashtag: #safecycling2012
This is a segregated off road path.
The plants along the marked section of the Penistone Road cycle path restrict the width of the path considerably and make it impossible for 2 cyclists to pass each other keeping in the cycle lane and forcing cyclists to take to the pedestrian half of the path.
There are also plants overhanging the pedestrian side which make pedestrians walk along the cycle half causing conflict.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by velocipedus@gmail.com // 0 threads
Proposal for a Business Improvement District which would replace (?) "Love Cambridge". http://www.cbbid.co.uk/
Proposal is all about safety, cleanliness, city ambassadors, ultimately revenue
Beverly Carpenter from millroadsociety.org has a very spirited and serious response in the local paper
http://www.cambridge-news.co.uk/Home/Bidding-to-make-the-most-from-city-12092012.htm (does not include the "threat to diversity" argument present in the print version)
She calls it an attempt to privatise public space, privatise policing, (BID's don't honor Freedom of information requests) and turning the city centre into a shopping centre
I have seen these BIDs working in other places: ambassadors whizzing around on strange wheeled things, trying to enforce "no cycling" rules, but also a large budget which funded an annual festival.
The proposal has no language about car parking this is a topic that needs to be very closely watched from the bicycle saddle.
Created by Robin Heydon // 1 thread
What if we could create a standardised method of assessing cycling infrastructure, either proposed by developers or existing?
Northstowe used something called the "IHT Cycle Audit Guidelines" that appear to be from 1996. Perhaps something better can be done that follows a more continental approach?
Thoughts? Opinions?
Martin Lucas-Smith // 1 thread
This is a proposal for a link joining the Guided Busway cycleway and Hills Road bridge.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Several meetings, in each area committee location to discuss s106 money and how it should be spent. Details below.
http://www.cambridge.gov.uk/ccm/content/planning-and-building-control/developer-contributions.en
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Anon // 1 thread
Wandsworth Council in TMO 1644 propose removing the contra-flow segregated cycle track at the eastern end of Putney Embankment to allow a hoarding to be built around the Thames Tideway tunnel construction site. The track will be re-opened when the work is complete, but this could take at least a year. It is proposed that eastbound cyclists join the Upper Richmond road by the Dukes Head pub and then continue on this road. Wandsworth Cycling Campaign objected to this on the grounds that the Upper Richmond Road is extremely heavily trafficked and the proposed diversion involved cycling past a row pf parking bays . This would be very difficult and hazardous for the mix of cyclists using the Thames Path of which this forms part. We asked that the parking bays be temporarily removed and replaced by a 1.5 to 2 m cycle lane separated from the motor traffic by wands or similar. For west-bound cyclists using the narrow lane left on Putney Embankment past the work site, we asked for the installation of 'Do not overtake cyclists' signs.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Gipsy Hill // 2 threads
Introduction:
Quietway7 links a cycle route from Elephant & Castle (E&C) with Crystal Palace, and was routed by TfL to be via Dulwich Village, West Norwood (Thurlow Park Road), Gipsy Hill and then Crystal Palace (via Farquhar Road).
The route from E&C southbound is in Southwark (to Dulwich) then is in Lambeth (Turney Road, Rosendale Road/Thurlow Park Road, Hamilton Road, to Gipsy Hill), then goes back into Southwark (from Gipsy Hill to Crystal Palace). Southwark had their part of the quietway consultation approved.
Lambeth delayed their decision to June 2017, and was then subsequently “called in” as there was widespread concerns from both the local community and cycling groups for parts of the route. Cycling groups unanimously objected to the proposed design along Gipsy Hill by: Southwark Cyclists, Lambeth Cyclists and Wheels for Wellbeing. 70% of respondents objected to the the design on Gipsy Hill. Gipsy Hill is a busy Local Distributor Road and bus route. Gipsy Hill has “insufficient road width” for a segregated track. The original proposed design meant motor vehicles “will encroach on the advisory cycle lane” to allow oncoming motor vehicles to pass.
Gipsy Hill Options:
There are alterative options to avoid Gipsy Hill. Southwark Cyclists have supported the design option to follow LCN23 downhill all the way along Dulwich Wood Avenue and then using the other side of Long Meadow (so not using Gipsy Hill), with a new track behind the bus stop.
See navy dashed line on sketch attached (mauve was the proposed Q7 design, red is LCN23)
This design is quieter and safer than using Gipsy Hill, and avoids the proposed dangerous junction Gipsy Hill/ Dulwich Wood Avenue, near the rail station. This integrated design also allows greatest cycle access to local amenities, schools, shops, and parks in Dulwich, West Dulwich and West Norwood. There is interest and outline support from Southwark to explore this option.
Next Steps:
Lambeth are now actively progressing engagement and revised designs for their part of the route, with a new consultation process due in September. There is potential for an improved option at Gipsy Hill, but this is likely to need new additional funding from TfL.
Suggested, to let local Gipsy Hill Ward Cllrs (Lambeth) and College Ward Cllrs (Southwark) and local cycling groups know your views.
Background:
Lambeth proposal that was called-in, see reports:
- Quietway 7 - Elephand Castle to Crystal Palace - Decision Report – 12 June 2017
- Appendix B - Quietway 7 - details designs (Gipsy Hill pages: 23, 46-49)
http://www.cpneighbours.org/gipsyhillquietway/
Thurlow Park Ward Cllr updates:
http://thurlowparklabour.org/post/162548844962/quietways-engagement-next-steps
TfL Quietway 7 Programme (Elephant & Castle to Crystal Palace) - Proposed changes in Lambeth - West Dulwich area
https://consultations.tfl.gov.uk/cycling/lambeth-q7-wd/
LCN23 Map:
https://www.openstreetmap.org/relation/2707#map=17/51.42643/-0.08336
What are Quietway?
London Cycling Design Standards, Chapter 1 (page 15):
Quietways “..are aimed at new cyclists who want a safe, unthreatening experience.” The key principles for Quietways include:
o Routes should be on the quietest available roads consistent with directness;
o Routes should be as straight and direct as possible;
o where they have to join busier roads, or pass through busy, complicated junctions, segregation must be provided;
http://content.tfl.gov.uk/lcds-chapter1-designrequirements.pdf
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3