Poor surface on path
Path reported to be poorly surfaced and in need of resurfacing.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Chris Lowe // 0 threads
Path reported to be poorly surfaced and in need of resurfacing.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Eric Booth // 1 thread
Another pinch point issue being installed on Whiteladfies Rd as part of the St. John’s Primary School Expansion which links the school in Worrall Road to the new site at the old police station at Lower Redland Road. Looks bad at the moment as there's just the buildout but signals will follow.
BCC Engineer states:
"In terms of specific cycle facilities we are making a number of improvement to the area:
Adding a 1.5 metre uphill cycle lane on Whiteladies Road near the Grove Road area (existing signalised crossing is to be removed).
Adding a 1.5m uphill red surfaced cycle lane (without markings) through the crossing on Whiteladies Road near Lower Redland Road.
Adding a continuous contra-flow cycle lane through the 2 one-way sections of Lower Redland Road (which was requested by cyclists in the area).
Created by Hester Wells // 0 threads
Temporary traffic lights for building works between High Cross and Charles Babbage Road.
I have received the following from our building facilities manager as these lights affect access to our building, and two others.
"1. With effect from Monday 22 July there will be 3-way traffic lights positioned between the existing Charles Babbage Road and new CBR. This will last for 1 week. The lights will be installed on Friday ready for operation on Monday. These lights will have an operator to monitor traffic flow during peak periods (8.30am – 9.30am and 4.30pm to 5.30pm). Outside of these times the lights will operate on sensor detection for queued vehicles to avoid unnecessary queuing, and will automatically sequence between the roads when no traffic is present. Unfortunately the lights will not detect and activate for cyclists and cyclists will need to wait for the lights to operate on the normal sequenced rotation.
2. Following the initial works and as work progresses along CBR, the traffic management will become 2 way light operation along the High Cross Access Road the CBR and this is expected to commence from Monday 29 July for a further 2 weeks.
3. During the above the New CBR and Access Road to Schlumberger are being prepared and tarmacked – kerbs are being installed etc. Surfacing is to be complete by 12 August ready to opened for use by all to access via the New CBR after 12th August.
4. Also after 12 August works will commence on finalising the junction at AVEVA/New Data Centre access and this will have 3 way traffic management and is expected to take 3 weeks.
5. Finally the access road into site via High Cross will close from week commence 19 August and this will be for approximately 7 weeks. This closure will be fully diversion signed from Madingley Road and around the site with diversion management (sighs) taking us via JJ Thompson Road and round to AVEVA from there. However there will be a trial closure of the High Cross Road entrance on the Thursday/Friday 15th & 16th August prior to the work starting on 19th, just to ensure all the signage is correct and easily followed. "
I am interpreting this as at least 6 weeks of temporary traffic lights which will not detect people on bikes.
I suspect cycle detection was only mentioned because I had specifically asked this question when the issue of temporary traffic lights first came up.
I have sent a message back to our facilities manager saying that I don't think this is acceptable as:
1) Cycle usage is nearly as high has car usage here in summer
2) I also see people using this as a through-route for Coton
3) We are on a side road off a through-route for buses, so I suspect the lights on their normal sequence will not be at all favourable for a person on a bike trying to get out, as the normal sequence will not want to disrupt bus flow too much.
4) I fear that the complete lack of provision will lead to some people breaking the rules, which could be dangerous.
However, she is merely relaying these details to us and is not responsible for it. She can contact the site project managers about any issues, which I hope she will do.
Any other ideas?
Created by christhebull // 0 threads
Heading westbound along Bridge Road towards the junction with Rownham Hill, one sees a narrow (90 cm wide) cycle lane leading to an ASL (lacking the appropriate markings), however, the main issue with this junction is the time given to cyclists heading across Rownham Hill into Ashton Court Estate. A slow cyclist who passes the stop line just after the signals turn amber will struggle (uphill) to cross towards the gatehouse before traffic coming up Rownham Hill gets a green light. As cyclists will have previously navigated the debacle that exists on both sides of the Suspension Bridge, this is hardly a welcoming introduction to what is actually a very nice estate to ride around.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Ian Jackson // 0 threads
DUPLICATE ISSUE OF
http://www.cyclescape.org/issues/74-20mph-limits-in-cambridge
- PLEASE RESPOND THERE.
---
The Cambridge City Council's consultation on 20mph speed limits in North Cambridge closes today.
Here is the URL:
https://www.cambridge.gov.uk/20mph-speed-limit
If you haven't already done this survey, please do so.
(I have said that I agree with all the proposals, and indeed that they don't go far enough.)
Created by David Earl // 1 thread
Cambridgeshire County Council proposes traffic lights on Sawston bypass where NCN11 and the northern link to Sawston meets it. However, the plan is for cyclists to have to cross three separate sets of lights.
Created by Ian Jackson // 1 thread
There are "Cyclists dismount and use footway" signs at some roadworks on Kings Hedges Road SE-bound outside the Post Office near the Golden Hind.
I spoke to a worker who said the sign had been put in by their traffic management team, after getting permission from Cambridgeshire County Council.
I have phoned the County who say one of their traffic management people will phone me back.
I have also made this FOI request:
https://www.whatdotheyknow.com/request/roadworks_traffic_management_cor
Created by David Earl // 1 thread
Ida Darwin Hospital, Fulbourn Old Drift, Fulbourn, Cambridge, Cambridgeshire, CB21 5EE
Approval is sought for a. A development brief for the Fulbourn and Ida Darwin hospital sites and b. Outline Planning Permission for the redevelopment of the Ida Darwin Hospital site with up to 180 dwellings (C3) including affordable housing, a 70 unit Extra Care facility (C2) with access and associated works, open space and landscaping, following the demolition of existing buildings on site.
Created by ambrosen // 0 threads
Turning right, eastbound from Weston Road to Victoria Park the cycle path (marked as a footpath on the map above, but signed in roundels once in the park) is not marked at all from the road.
A pointer showing the existence of the path would be great. Even better would be a turn refuge from the centre of Weston Road.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Chris Ruse // 2 threads
I think I’m correct in saying that several months ago the kerb at the junction of Strawberry Vale and Waldegrave Road was realigned with the result that the cycle lane that had previously continued up to the stop line was cut short at the point where the kerb was realigned. Photo 1341 -1 shows this quite clearly. I cycle along this road fairly frequently and had recognised this as a dangerous point for a cyclist but did nothing about it other than taking care. On Monday however my alertness paid off as a large lorry overtook me about 8 – 9 metres back from the stop line. Had I not braked hard it would have undoubtedly have hit me. The alignment of the kerb creates a pinch point which a cyclist is funnelled into without any warning.
It appears to me that the needs of cyclists have been ignored in the redesign of this junction and that a road safety hazard has been created.
Created by Shaun McDonald // 1 thread
As a cyclist it's pretty horrible to cycle along Clerkenwell Road due to it being much narrower than it used to be, or could be due to the ultra wide pavements.
West bound there is a bit of 2 lane queuing preventing cyclists getting past. Eastbound just before the lights the Island is in the way forcing cyclists to merge with motors.
Created by Simon Nuttall // 2 threads
Garden Walk is a two way street for all but the last few metres at it's junction with Victoria Road. At that end there is a cycle bypass to the no-entry. It's a bodge up that only transport planners understand.
http://www.cyclestreets.net/location/10161/
I've experienced it myself, but a resident of the street tells me of her frequent problems with aggressive oncoming traffic (mostly van drivers) that barge at her as she rides up the road. When she tries to point out how the street works they don't listen and challenge her knowledge because of her french accent.
I've suggested these two signage solutions...
Blue signs...
http://www.cyclestreets.net/location/44690/
Big bicycle markings on the road...
http://www.cyclestreets.net/location/37295/
Martin Lucas-Smith // 1 thread
This new development is almost finished, but there is no obvious sign of cycle parking on the frontage - which I believe may be for shops - yet (and the back area is obviously not publicly accessible at the moment).
Do we know what cycle parking is planned here?
Martin Lucas-Smith // 1 thread
There have been several reports of a surfacing problem here.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Martin Lucas-Smith // 2 threads
The University Arms (next to the entrance to Parker's Piece) is planning a new frontage.
This could have cycle access issues.
Also this would be a good opportunity to push for a contraflow from Hobbs Pavilion to Regent Street.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.