Anchor Road crossing
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by mikewg // 0 threads
delays are too long crossing from the centre to college green. Too much priority given to motor traffic outbound vs heavy two way cycle and predestrain flow.
Created by kirbyjames // 0 threads
The short length of narrow cyclepath contains two black bollards. (presumably to stop small cars using thbe cyclepath) These present a hazard to cyclists - we are aware of three cyclists havingh been injured hitting them.
It is recomended that they be removed.
Martin Lucas-Smith // 1 thread
This area of town has lots of children having to cycle round the main road because there is one-way cycling - we should get the council to make it two way.
Created by Rohan Wilson // 1 thread
An application for 148 homes 11/0008/FUL was refused by Planning Committee(against officer recommendation) on 4 April. Cycle parking "storage" is generally less easy to reach than car parking, and it appears that for the central blocks it is proposed in a shared basement area - I haven't found the drawing for the basement.
There is no access to the site except by the narrow road around the existing Westbrook office block - the site is a deep enclave.
The issues for cycling are probably virtually identical to previously. One of various reasons for previous refusal was "...lack of transport mitigation measures..." and the Highways provisional comment on the current one outlines concerns. I fear that cycle and pedestrian access issues were not previously considered grounds for refusal and that therefore we might be fighting a lost cause... have contacted the officer about this, and hope to submit a comment for Sustrans.
Created by cobweb // 8 threads
There have been problems before with unsatisfactory cycle parking and obstruction of the paths across this busy green space. New people are providing the ice rink this year though.
Created by Chris Lowe // 1 thread
Plans submitted for consultation on improvements to the A38 corridor. http://www.birmingham.gov.uk/LSTFBristolRoad
Created by Chris Lowe // 0 threads
This looks like it was designed originally as a cycle path - because of the way the kerbs are placed.
Would be a good cut-through for bicycles. Needs re-assigning as shared use, plus a dropped kerb at the Gilby Road junction.
Created by Chris Lowe // 1 thread
Monument Road is a serious barrier to cyclists using this designated cycle route. There is a pedestrian crossing, just down Monument Road, but the pavements are too narrow for shared use.
There needs to be a crossing to enable cyclists to move easily along the cycle route.
Created by Chris Lowe // 0 threads
This is signed 'no cycling'. It is a nice route to access the shops on the junction of Hagley Road / Monument Road, as it has very low traffic.
Needs to have cycling permitted, plus dropped kerbs at the north end for access.
Created by Chris Lowe // 0 threads
Nice road closure, but there is poor provision for bicycles to get through. The kerbs need work to be done, to allow bicycles to get through.
Created by Chris Lowe // 0 threads
Good road-closure, but there is poor provision for bicycle permeability. Needs gaps for bicycles (up to width of cargo bike / trike) to fit through.
Created by velocipedus@gmail.com // 3 threads
On Hills Rd Bridge (etc) a large message sign displaying 5 lines of text and two screens warns of delays because of upcoming building work in central Cambridge (Lensfield Rd etc)
I am minded to write to the city early on Monday
Re: Message signs warning of congestion due to street works
Dear Madam, Sir,
We would like to make an suggestion regarding the text displayed on the mobile message signs currently warning of major road works and congestion. Our suggestions would be to add the words “Thanks for cycling” and “Try the bicycle to avoid delays” (alternating).
We believe it is entirely appropriate to use any major road-works as an opportunity to encourage the use of active transportation, because it is proven to reduce congestion. Such messages will also deliver an important message about the status of cycling in the city. The expression of gratitude expressed in the first suggestion is especially important, as it sets a tone of public appreciation.
We would also like to remind you that a recent Freeway closure in Los Angeles was widely advertised by local authorities as “Carmageddon” and residents were encouraged to participate in local bike rides, organised by the regional transportation authority (METRO), to overcome the expected delays. Given our own little Carmageddon, should Cambridge not do the same ?
----
Feedback please, contacts, CCs to the press, Travel to work, etc
Created by Matthew Phillips // 1 thread
There is no obvious public cycle parking on Palace Green, the key tourist destination in Durham. While there is some cycle parking, it is well hidden and un-signposted. Some racks along between the trees at the Castle end of Palace Green would be ideal.
Created by Simon Hewison // 0 threads
A parade of shops that serve the local community have nowhere suitable to park bicycles, not even any useful street furniture. Having a sensible cycle rack here would encourage people to cycle to these shops rather than drive.
http://www.cambridge-news.co.uk/News/Development-plan-for-Mitchams-Corner-unveiled-28092012.htm
In summary: Staples and Lloyd’s bank are due to be demolished in this redevelopment. There's a consultation meeting next Friday from 2-7pm and on Saturday from 10am - 2pm at The Tivoli pub which is opposite.
Created by velocipedus@gmail.com // 1 thread
Jim C raised this in an email to SUSTRANS: ...if staff from the London office would find an 'Awayday' in Cambridge an interesting outing?
> Cambridge can be great in the spring, and if a trip is in term time
you can see just the sorts of diverse cycles and cyclists (diversity)
>
> I'm sure we can create a good itinerary, covering innovative
locations, tourist hotspots, and key cycle facilities.
>
> As I said at the time, why go 'Dutch' to see examples of cycle
culture, when in Cambridge you can see what can be achieved in the UK.
Created by velocipedus@gmail.com // 1 thread
International Cycling Safety Conference 2012, 7 Nov
Location: Helmond, The Netherlands
Costs: 150 Euro
Twitter hashtag: #safecycling2012
This is a segregated off road path.
The plants along the marked section of the Penistone Road cycle path restrict the width of the path considerably and make it impossible for 2 cyclists to pass each other keeping in the cycle lane and forcing cyclists to take to the pedestrian half of the path.
There are also plants overhanging the pedestrian side which make pedestrians walk along the cycle half causing conflict.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Created by velocipedus@gmail.com // 0 threads
Proposal for a Business Improvement District which would replace (?) "Love Cambridge". http://www.cbbid.co.uk/
Proposal is all about safety, cleanliness, city ambassadors, ultimately revenue
Beverly Carpenter from millroadsociety.org has a very spirited and serious response in the local paper
http://www.cambridge-news.co.uk/Home/Bidding-to-make-the-most-from-city-12092012.htm (does not include the "threat to diversity" argument present in the print version)
She calls it an attempt to privatise public space, privatise policing, (BID's don't honor Freedom of information requests) and turning the city centre into a shopping centre
I have seen these BIDs working in other places: ambassadors whizzing around on strange wheeled things, trying to enforce "no cycling" rules, but also a large budget which funded an annual festival.
The proposal has no language about car parking this is a topic that needs to be very closely watched from the bicycle saddle.
Created by Robin Heydon // 1 thread
What if we could create a standardised method of assessing cycling infrastructure, either proposed by developers or existing?
Northstowe used something called the "IHT Cycle Audit Guidelines" that appear to be from 1996. Perhaps something better can be done that follows a more continental approach?
Thoughts? Opinions?
Martin Lucas-Smith // 1 thread
This is a proposal for a link joining the Guided Busway cycleway and Hills Road bridge.
Created by Shaun McDonald // 1 thread
This section of the flagship National Cycle Network Route 1 on entering Ipswich is of particularly poor quality. There are nettles, brambles and other bushes overgrowning the very rough and narrow path. Is this really the quality of cycling that we want to show to Dutch cyclists coming over from the Netherlands who would have expected there to be a tarmaced cycle path that's a couple of metres wide. There is space to here to place a good surface.
Several meetings, in each area committee location to discuss s106 money and how it should be spent. Details below.
http://www.cambridge.gov.uk/ccm/content/planning-and-building-control/developer-contributions.en
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.