Issues

This section lists issues - problems on the street network and related matters.

Issues always relate to some geographical location, whether very local or perhaps city-wide.

You can create a new issue using the button on the right.

Listed issues, most recent first:

  • Adam and Eve rat-running

    Martin Lucas-Smith // 1 thread

    A proposal has been put forward to add bollarded access in this cut-through from Adam and Eve Street through to Burleigh Street, to avoid rat-running in the area.

    Please sign in to vote.
  • North Newtown area: removing unnecessary traffic

    Martin Lucas-Smith // 1 thread

    The Newtown area (basically between the Botanic Gardens and Lensfield Road on the inner ring road) is a mass of one-way streets, rat-running vehicles, children being dropped off to the schools rather than cycling, and so on.

    We should take the opportunity to work with locals to improve the area.

    Please sign in to vote.
  • Humpback Bridge

    Created by Bracken VanRyssen // 0 threads

    The humpback bridge over the stream at this point is highly unsuitable for a well trafficked bicycle route, the design with extremely steep access from both directions as well as areas of mud make the bridge quite a pain to cross. This is especially problematic for bicycles with small wheels or heavy loads, that may struggle with entry and exit of the bridge. An ideal solution would be a longer bridge with gentler slopes to minimise damage to bicycle wheels and smooth out the transition. No doubt this bridge also causes problems for less-able people and represents a significant barrier which is enough of a reason in itself to undertake improvements.

    Please sign in to vote.
  • 321 student flats, Cheddars Lane / Newmarket Road)

    Martin Lucas-Smith // 1 thread

    15/0398/FUL | Erection of student accommodation with 321 student rooms (following demolition of existing buildings), together with ancilliary accommodation comprising common/study rooms, porters lodge, laundry room, plant room, bin and bike enclosures, landscaping and associated infrastructure including a sub-station. | 8, 10 And 10A Cheddars Lane And 351-355 Newmarket Road Cambridge Cambridgeshire CB5 8LD

    Usual issues to check out:

    - Cycle parking (number, type and positioning)
    - Access, in particular need for improvements to Newmarket Road

    https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=documents&keyVal=NKN9I5DX01700

    Please sign in to vote.
  • Broken Glass in front of the Birmingham Uni

    Created by Bracken VanRyssen // 0 threads

    The cycle path alongside the University of Birmingham campus seems to be a magnet for broken glass, especially in the area opposite the petrol station and Oakfield Road. Avoiding all the broken glass is quite a trial especially for those with less robust tires. Regular sweeping would go a long way towards improving the quality of the route.

    Please sign in to vote.
  • Cycleway in Cassiobury Park

    Created by Clive // 0 threads

    The path that runs across the width of Cassiobury Park from Stratford Way to Cassiobury Park Avenue has not been resurfaced since I've been in Watford (13 years). Very poor condition especially in the vicinity of the j/w what seems to be known (on Google Maps) as Central Avenue.

    The problem is more than its surface - the path is far too narrow, esp in view of the high use it gets from cyclists and pedestrians.

    Please sign in to vote.
  • Poor Bourne Park cycle path surface

    Created by Shaun McDonald // 1 thread

    The surface of the cycle path, which is also National Cycle Route 1 through Bourne Park is of an extremely poor quality. This really needs to have a smooth tarmac surface, and potentially widened.

    I would expect kids to be learning to ride a bike along here, however that's not currently possible as its' touch going for an adult to cycle here never mind a child who is just learning to cycle. If this path is upgraded it would be even better if the surfacing was extended to create a circle around the park which is reasonably smooth, so that people can learn to cycle by cycling around this park.

    Please sign in to vote.
  • Poor reinstatement left trench across path

    Created by Donald Noble // 1 thread

    A trench has been dug across the cycle path close to the substation, and has not been properly reinstated, leaving a 0.5m wide 5cm deep rut right across the tarmac path,

    This should have been reinstated properly at the time, but would be good if it could be fixed soon

    Please sign in to vote.
  • Poor Cycle Path and Pavement Surfacing

    Created by Bracken VanRyssen // 1 thread

    The pavement and marked cycle path is in pretty bad shape due to root damage and weathering and could really do with some resurfacing. As well as this the numerous side roads and the narrow pavement sections beyond the bus stop create numerous conflict points.

    Please sign in to vote.
  • Stratford Road Cycle Provision

    Created by Bracken VanRyssen // 0 threads

    Cycle infrastructure is disjointed and confusing, there is no clear and consistent level of infrastructure along the Stratford route. What little infrastructure there is, is mostly made up of narrow shared-use pavements. Unless you approach Shirley High Street from the west (through the park), safe access to the shopping district by bicycle is limited.

    Please sign in to vote.
  • Ridgeons Cromwell Road

    Created by Monica Frisch // 2 threads

    The site used by Ridgeons (builders' merchants) on Cromwell Road in Cambridge has been identified by Cambridge City Council as a potential location for new housing in the future. As a part of this, Ridgeons and their team of consultants, along with Cambridge City Council, are working to develop a document called the Ridgeons Cromwell Road Development and Planning Brief (Supplementary Planning Document, SPD). This will provide guidance on access, land use, building types, open space and character for all future planning applications on the site.

    Please sign in to vote.
  • Shared path and toucan

    Created by Stephan Matthiesen // 0 threads

    The hill from the Braidburn Inn across Liberton Road up Kirk Brae is very difficult (steep and much traffic).

    Cyclists should be allowed to use the pavement from opposite the Braidburn Inn (at the end of the cycle lane), then cross Liberton Rd at the pedestrian lights (to be converted into toucan) and then continue on the pavement up Kirk Brae, at least to the Fire Station.

    Dropped kerbs are needed:
    - at the end of the cycle lane in Mayfield Road
    - at the end of Mayfield Rd, before the lights
    - at the bottom of Kirk Brae
    - at Double Hedges Row

    Many cyclists already use the pavement in this way, but lack of dropped kerbs makes it difficult (and of course it would be better if it's made legal).

    Please sign in to vote.
  • Cambridge Community Speedwatch

    Created by Simon Nuttall // 2 threads

    The Speedwatch scheme allows the public to get actively involved in monitoring the speed of vehicles travelling through their neighbourhood. It is used in areas where speeding has been identified as a priority at quarterly neighbourhood panel meetings. The scheme is run by the force alongside the Cambridgeshire and Peterborough Road Safety Partnership. It is about educating motorists in the law in relation to speeding and monitoring any trends in speeding in neighbourhoods.

    Volunteers are trained to use speed indicator devices which displays vehicle speed. The registered owner of any vehicle seen exceeding the speed limit is sent an advisory letter from their local neighbourhood policing team, explaining that speeding is unacceptable to the local community.

    Please sign in to vote.
  • New path in Inch Park

    Created by Stephan Matthiesen // 2 threads

    Have a new shared path on the Est side of Inch Park, connecting Glenallan Drive, Old Dalkeith Road and Cameron Toll.

    This would be a very useful connection that allows cyclists (and pedestrians) to avoid parts of busy Old Dalkeith Road.

    There is no real reason why a proper path can't be built there; dog walkers walk along the suggested route all the time (on the grass).

    Please sign in to vote.
  • Path connection

    Created by Stephan Matthiesen // 2 threads

    There is a strange muddy puddle where the path from Burdiehouse Burn meets the footpath along Burdiehouse Rd., and the right-angle corner is very narrow anyway.

    The paths should be connected in a more gentle curve - there is a desire line on top of the wall in the left half of the image.

    This is an important point as the footpath does not continue along Burdiehouse Rd northwards, so all cyclists and pedestrians have to walk through the puddle.

    Please sign in to vote.
  • Proposals for Traffic Regulation Order TMP 7109 Amesbury Circus Area

    Created by Iain Lane // 1 thread

    From email:

    Nottingham City Council (Amesbury Circus Area, Aspley, Nottingham) (Prohibitions of Waiting and Entrance Clearway) Traffic Regulation Order 2015 (TMP 7109)

    Please find attached a consultation letter and associated Drawings, Numbers TM/TMP7109 which relates to the above areas, Amesbury Circus Area, Aspley , Nottingham - Traffic Regulation Order (TMP 7109). If you have any concerns in relation to the TRO proposals can you please let me have your comments by 31st March 2015.

    Please sign in to vote.
  • Segregated cycle path/shared use

    Created by Stephan Matthiesen // 3 threads

    Create a cycle path on the pavement or make it shared use, from after the bus stop in Liberton Road around the corner to the junction Gordon Terrace/Esslemont Rd.
    This would allow cyclists who want to turn left from Liberton Rd towards KB to bypass the traffic lights, then continue onto Gordon terrace or rejoin the other traffic in Esslemont Rd.

    Currently it's dangerous because:
    (1) this route is uphills and cyclists are going slow, but cars turning left can't see ahead if there are cyclists.
    (2) cyclists have to wait at the light and then are in front of cars, so drivers get quite annoyed having to trundle along until safe overtaking is possible in Esslemont Rd, many attempt dangerous overtakes earlier. If cyclists can bypass the red lights they have a chance to go up the difficult bit during quieter phases
    (3) cyclists who are not in the ASL (but also those in the ASL) are in danger of being left-hooked (see also http://edinburgh.cyclescape.org/issues/1532-segregate-the-feeder-lane)

    Please sign in to vote.
  • East-West Cycle Superhighway - phase 2 consultation

    TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west

    The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.

    To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)

    Please sign in to vote.
  • North West Cambridge Building Works

    Created by Rachel_O // 1 thread

    Ongoing work on the development of the North West Cambridge site results in cycle paths being blocked at random intervals, and inappropriate pedestrian-oriented alternative provision makes the situation more, not less, dangerous for cyclists, forcing us into a narrow roadway with fast-moving traffic. With the increase in heavy traffic, road surface is also deteriorating rapidly - increasing numbers of large potholes, which can easily lead to pinch flats and other mechanical failures on dangerous, narrow sections where lack of cycle path of pedestrian walkway means here is no escape route.

    Please sign in to vote.
  • cars parked in cycle lane

    Created by TonyBeaumont // 1 thread

    Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.

    Please sign in to vote.

This map shows all issues, whether points, routes, or areas:

Back to top