Created by John Ackers // 2 threads
Part of Quietway 10 - Bowes Park–Farringdon Quietway. Also referred to by ICAG as 'the Islington Quietway'.
Created by Space Pootler // 2 threads
1. Relocation of the existing zebra crossing on Little Ealing Lane closer to Weymouth Avenue The crossing will be installed on a raised table which will help to slow down traffic. Existing parking spaces directly outside Little Ealing Primary School will be relocated which will improve visibility for drivers exiting Weymouth Avenue.
2. Installation of a new shared zebra crossing outside Mount Carmel Primary School. This will help parents and pupils of this school to cross the road safely, and make it easier for cyclists to turn right from Radbourne Avenue into Little Ealing Lane. The new zebra will be also raised which will help to further reduce speeds of vehicles. This will result in removal of existing School Keep Clear markings.
3. Cycle track adjacent to footway to separate cyclists form motor traffic on the section of the road where they are at the most risk. The track will also provide a safer link between Radbourne Avenue and Weymouth Avenue, which is part of a proposed ‘Quietway’ cycle route linking Brentford and Ealing. This will also result in removal of existing School Keep Clear markings which will be replaced by double yellow lines.
Created by Simon Munk // 1 thread
TfL Overview:
We would like your views on proposals to improve safety, journey time reliability and the urban realm on Commercial Road between New Road and Jubilee Street in the London Borough of Tower Hamlets.
We have identified a higher rate of collisions along this stretch of road compared to similar roads in London, particularly involving pedestrians, cyclists and motorcyclists. Therefore, we are proposing a scheme that is designed to reduce the number of collisions involving these vulnerable road users.
The area also suffers from vehicle congestion, particularly at peak times. Parked vehicles prevent buses from using the eastbound bus lane at busy times, which causes delays to bus passengers.
What are we proposing?
We are proposing to implement a number of changes to improve conditions for bus passengers and vulnerable road users. These include:
Pedestrians
- Raised carriageway with coloured surfacing on Commercial Road between Turner Street and Sidney Street to help lower traffic speeds and reduce collisions. There would still be a detectable kerb height between the road and the footway
- Converting the pedestrian crossing outside Watney Market to a wider straight crossing and relocating it closer to the market. This would mean pedestrians crossing in one stage rather than waiting on a central island. Pedestrian “Countdown” at the crossing would also be provided.
- Providing a wider crossing point for schoolchildren outside Mulberry School for Girls and installing electronic signs to make drivers more aware of schoolchildren crossing
- Raising the level of all side road entrances and providing kerb build outs to reduce traffic speeds, making it easier for pedestrians to cross
- Providing a continuous footway across the following side roads to give priority to pedestrians and a smoother crossing surface: Richard Street; Jane Street; Anthony Street; Fenton Street; Buross Street; Hungerford Street; Bromehead Street
- Reducing kerb heights, particularly around Watney Market, to help pedestrians
- Installing low level central islands to help pedestrians cross the road informally
- Upgrading pavements where damaged or uneven
Other Road Users
- Re-surfacing sections of the road to provide a smoother surface for cyclists and motorcyclists and to reduce noise
- Making Turner Street “no entry” to motor traffic (except cycles) from Commercial Road in order to improve safety outside Mulberry School for Girls and to prevent vehicles queuing back onto Commercial Road at busy times. Access would still be possible using other routes, and motorists would be able to exit Turner Street onto Commercial Road as they do now
- Widening bus lanes to 4.5 metres to allow cyclists and motorcyclists to pass buses more safely. We would create space for this by changing the hours of operation of the parking bays on the North side of Commercial Road
- Converting some existing parking bays into two new loading bays.
- Changing parking controls where necessary on the north side of Commercial Road by converting existing ‘all day’ parking (Mon-Sat 7am-7pm) to off-peak times (Mon-Sat 10am-4pm). This would allow the bus lane to operate at peak times (Mon-Sat 7-10am and 4-7pm)
- Providing Advanced Stop Lines for cyclists at junctions to let them wait ahead of other traffic
Urban Realm Improvements
- New tree planting where conditions allow.
- Improving the urban realm – reducing clutter, better paving and a more pleasant environment particularly around Watney Market
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Created by WildNorthlands // 0 threads
Highcliffe Rd is used as a rat-run between Fulwood and Bents Green/Ecclesall. It's a difficult road for cyclists as it starts off very steeply and is quite narrow, with cars parked on the uphill side. There is an alternative route through the woods - a bridleway that if brought up to standard would provide a very pleasant alternative for cyclists heading to/from Bents Green, with a direct link to NCN6.
Created by WildNorthlands // 1 thread
Redevelopment of the former Norton College site.
Created by M Stanley // 1 thread
Linton Bridge has been closed since the Dec 2015 floods.
Created by M Stanley // 1 thread
Created by T Harris // 1 thread
Hounslow Cycling has been asking for a Quietway on Essex Place as a way of getting to Belmont Primary School.
Lendlease currently have a planning application to redevelop the area
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Ben Brierton // 1 thread
The new road layout on the westbound approach to M11 turning on Madingley Road has poor provision for cyclists.
Cyclists going westbound now have to take the second lane for a few hundred metres with traffic passing at speed on both sides. Traffic passing in the left lane will be taking the slip road onto the M11 and traffic in the second lane will be going straight on.
Created by Shaun McDonald // 1 thread
The cycle lane on Norwich Road is exceptionally narrow and not fit for purpose. Can't even fit a bike in it.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
What is the Draft Transport Strategy for East Cambridgeshire?
We have drafted a transport strategy to tackle the current and future transport pressures in and around the district, and to help support growth in East Cambridgeshire. The purpose of this strategy is to:
Provide a detailed policy framework and Action Plan of potential transport improvements for the area, addressing current problems and consistent with the policies of the third Cambridgeshire Local Transport Plan 2011-2031 (LTP3).
Support the East Cambridgeshire Local Plan, and take account of the committed and predicted levels of growth, detailing the transport infrastructure and services necessary to deliver this growth.
The strategy contains details of the schemes proposed in the short and medium term as well as the longer term schemes as proposed in the Long Term Transport Strategy.
We want the views of anyone who lives, works, visits or travels through East Cambridgeshire in order to improve this draft transport strategy. Let us know your views on the strategy objectives, policies and the action plan of proposed transport improvements for the area by answering the questionnaire before the 8th April 2016.
View the TSEC consultation leaflet (pdf, 1MB) for a summary of the information we are consulting on and answer the questionnaire. Alternatively, hard copies of the consultation leaflet and questionnaire are available at libraries and doctors surgeries around East Cambridgeshire or by request via the contact details below.
Come to talk to us and fill in a questionnaire at one of the public exhibitions below:
Created by dpattinson // 1 thread
Although cycle lanes are marked in parts along Chapeltown Rd going out of town, it is quite dangerous, especially where there is parking for the shops along the west side of Chapeltown Rd. A particular concern is just after the pedestrian crossing lights past Mexborough St, opposite Costcutters. The vehicle lane narrows for the pedestrian island in the middle of the road, but straight after it are car parking spaces which protrude out into the road, creating a bottleneck so cyclists have to go into the middle of the vehicle lane to get around cars parked there. I've had a few close calls there as impatient vehicles try to push past where there is no room.
It is almost normal during peak hour to have to negotiate cars parked on double yellow lines across the cycle lane.
Created by Robin Heydon // 1 thread
A simple tool for assessing the cycling environment, at the moment only for lengths of streets. This is not for a whole root assessment or for junction assessments.
Created by Dexter Johnstone // 1 thread
Blackstock Road widening from on the approach to Gleadless Road from Bankwood Road to Gleadless Road junction.
Created by T Harris // 1 thread
New cycle parking in Staines Road, Cavendish parade, Beavers Road, Martindale Road, Barrak Road, Laurel Gardens, Bath Road, St Paul's Close
Martin Lucas-Smith // 1 thread
Cambridge City Council is consulting on an update to its Historic Core Conservation Area Appraisal.
The Historic Core Conservation Area Appraisal covers 70+ streets in the city centre which are defined according to their significance. This significance can be their historical, architectural or social impact on the character and appearance of Cambridge.
The original appraisal, which was published in 2006, has been reviewed to ensure that it is up to date with any new developments within the city centre, and that any new pressures on the historic heart of Cambridge are recognised. This revised document is now out to public consultation.
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by T Harris // 2 threads
‘Segregated cycleway’ planned for western side of Gunnersbury Avenue (next to park and cemetery)
Transport for London are proposing widening the cycleway on the western side of Gunnersbury Avenue, next to the cemetery and park.
‘Shared pavement’ planned for eastern side of Gunnersbury Avenue
TfL are proposing to make a 5m wide ‘shared use area for pedestrians and cyclists’ on the eastern side.
Created by Simon Munk // 1 thread
TfL overview
We are proposing a number of changes at Hammersmith gyratory, King Street, Beadon Road and Hammersmith Road as part of our Road Modernisation Plan, in partnership with Hammersmith & Fulham Council (H&F Council).The proposals aim to deliver a safer and more direct east-west cycle route through Hammersmith town centre.
What are we proposing?
We are proposing to create a direct, kerb-segregated two-way route for cyclists across the northern side of the gyratory, with separate cycle signals to protect them from traffic. This would remove the need to cycle round the gyratory, mixing with fast-moving traffic, and break a key barrier to cycling in west London.
To improve conditions and safety for cyclists we would:
- Provide a segregated two-way cycle track on the north side of Hammersmith gyratory. Cyclists would be physically separated from traffic by a kerb. We would make room for the cycle track by reallocating space from some sections of the wide pavement on the south side of the road
- Separate cyclist and motor vehicle movements at junctions; cyclists would have their own traffic signals which would be green at different times to those for motor traffic
- Extend the eastbound contraflow cycle track on King Street to allow cyclists to reach the gyratory from Hammersmith Town Hall without having to follow Studland Street, Glenthorne Road and Beadon Road. The cycle track would be ‘stepped’, meaning it would be at a height between the road and footway, and become physically separated with a kerb east of Lyric Square. We would make room for the cycle track by reallocating some space from the pavement on the south side of King Street
- Provide a short two-way section of cycle track on Queen Caroline Street to allow access to Black’s Road and Hammersmith Bridge Road
- Enable cyclists to pass through the island at the junction of Hammersmith Broadway and Butterwick, and increase the size of the island to accommodate cyclists and pedestrians
We would also make the following changes in the area:
- Provide a new bus lane on Beadon Road, between Glenthorne Road and Hammersmith Broadway
- Remove the pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road to allow for provision of the segregated cycle track
- Install pedestrian countdown signals at the crossings of King Street, Beadon Road, Shepherd’s Bush Road, Queen Caroline Street, Hammersmith Broadway and Butterwick
- Widen the footway on King Street where possible to provide more space for pedestrians in this busy area
- Raise the carriageway to footway level on King Street opposite Lyric Square to make crossing more convenient for pedestrians and encourage slower motor vehicle speed
- De-clutter pavements by rationalising locations of street furniture
- Increased cycle parking
- Relocate one loading bay and two disabled parking bays on Black’s Road to provide space for additional taxi rank spaces
Why are we proposing this?
TfL is investing £4bn in the Capital’s vital road network to ensure London’s roads are able to meet the needs of a growing population. As part of this plan, we are reviewing junctions and gyratories across London to make them safer for all road users, including cyclists, and to make journey times more reliable. Hammersmith gyratory is used by many cyclists each day, and can be an intimidating place to cycle. Hammersmith is one of the Mayor of London’s 33 priority “Better Junctions”.
H&F Council’s cycling strategy sets out an ambitious plan to increase the number of people cycling in the borough to reach eight per cent of all journeys. Part of this plan is to deliver a segregated cycle route along the A315 corridor, a key commuter route for cyclists. Hammersmith gyratory lies on this route.
We are proposing to give cyclists dedicated space and separate cycle signals at junctions on the northern side of the gyratory. This would offer cyclists a more comfortable and direct route between King Street and Hammersmith Road, bridging the gap in the proposed A315 cycling route that the gyratory currently creates.
Removal of the pedestrian crossing
To ensure cyclists have adequate space to wait for a green signal on the island at the south of Shepherd’s Bush Road, we would need to remove the existing pedestrian crossing that connects this island to the south side of Hammersmith Broadway.
Although the crossing is less well-used than others in the area, its removal would mean pedestrians would have to find alternative routes. Those walking between the south side of Hammersmith Broadway and the west side of Shepherd’s Bush Road would need to cross Queen Caroline Street and Beadon Road. Those walking between the south side of Hammersmith Broadway and the east side of Shepherd’s Bush Road would have a choice between crossing Queen Caroline Street, Beadon Road and Shepherd’s Bush Road or crossing Hammersmith Broadway at its junction with Butterwick.
The vast majority of pedestrians crossing Hammersmith Broadway from outside the Piccadilly Line tube station use the most western of the two crossings.
Impact on buses
Beadon Road is narrow and carries a high volume of buses and general traffic. To reduce delays currently experienced by buses approaching the gyratory, we would provide a new bus lane on Beadon Road between Glenthorne Road and Hammersmith Broadway, replacing one of the two general traffic lanes.
We also would need to relocate bus stop Z5 on the gyratory, which is currently used for emergency purposes only, to Butterwick.
How would bus and traffic journey times be affected?
Our proposals would affect some journey times through the area. In the main these changes would not be significant, with some bus and general traffic journeys getting shorter and some getting longer. The most notable increases in journey times will be for traffic approaching Hammersmith gyratory from Fulham Palace Road in the morning and evening peaks.
Impact on other road users
We propose to relocate the position of one loading bay on Shepherd’s Bush Road, with the existing dimensions remaining, in order to allow for an increase in the size of the existing taxi rank.
How does this fit in with the wider plans for Hammersmith town centre?
TfL and H&F Council are working together on ambitious plans for a long-term transformation of Hammersmith town centre.
We are proposing shorter-term improvements to improve safety and connectivity for existing cyclists and support the Council’s cycling strategy to increase the number of new cyclists in the area. This plan is separate to, and does not affect longer term proposals for the area, however these proposals would be integrated with any future schemes.
Delivery of the wider A315 cycling improvements
TfL and H&F Council are also working together on plans for an east-west cycling route along the A315. Plans for this route either side of Hammersmith gyratory are currently being developed, with public consultation planned to take place later this year.
Created by Goalie911 // 2 threads
I have noticed that cyclists use both sides of the one way street (The Common, Hatfield).I was just wondering if there's a two way cycling system in use?
Created by Simon Munk // 1 thread
TfL Overview
We are proposing to make changes on A205 Stanstead Road at two locations. One proposal includes improving the pedestrian crossing facilities at the junction of Brockley Rise and A205 Stanstead Road. The second proposal includes removing a loading bay from A205 Stanstead Road to Ravensbourne Road.
What are we proposing?
Brockley Rise
We propose to install a new signal-controlled ‘staggered’ crossing on Brockley Rise. To achieve this, we propose to create a safer pedestrian waiting area by widening the central reservation, while maintaining the two lane approaches to the junction heading south along Brockley Rise. We propose to improve the footway layout by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.
We also propose to modify the loading and parking bays to allow for traffic to turn into Brockely Rise. The bay would be slightly shortened by 2.5m and moved north by 2.5m.
Cranston Road
Similar to Brockley Rise, we propose to install a new signal-controlled ‘staggered’ pedestrian crossing on Cranston Road. We would create a safer pedestrian waiting area by enlarging the central island. We would also improve the footway by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.
Created by Simon Munk // 1 thread
TfL Overview
In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.
What are we proposing?
The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.
The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
10 New position of relocated loading bay from Tanner Street (see 9)
11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.
Created by Simon Munk // 5 threads
Full route of Quietway 7 Elephant & Castle to Crystal Palace
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing