South Road, Southall
Ealing council is proposing a new road layout for South Road in Southall. It will remove an access road to create a wider pavement, but provides no extra space for cycling.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Martin Gorst // 1 thread
Ealing council is proposing a new road layout for South Road in Southall. It will remove an access road to create a wider pavement, but provides no extra space for cycling.
Created by Simon Munk // 1 thread
Overview
We are proposing improvements for pedestrians and cyclists along the A406 North Circular from Bridge Lane to Golders Green Road and at the A406 junction with Golders Green Road and Brent Street. The proposals include converting some sections of footway to shared use for pedestrian and cyclists, and a new staggered shared pedestrian/cycle ‘toucan’ crossing on the westbound carriageway, adjacent to the Woodlands retaining wall.
The proposals for the crossing are in response to safety concerns that pedestrians are crossing the A406 independently and using the central reservation as a waiting area, rather than using the pedestrian footbridge located at the junction. The existing pedestrian footbridge will remain as a secondary crossing point for pedestrians and dismounted cyclists to use.
We propose the following:
- A new ‘toucan’ crossing for pedestrians and cyclists on the A406 North Circular westbound carriageway, adjacent to A406 Woodlands retaining wall. This would involve widening the central reservation by 4 metres to accommodate the crossing, central waiting area and guard railing, which in turn would require minor widening of the carriageway into the footway on the north west corner of the junction
- New shared use footway for pedestrian and cyclists at the A406 junction with Golders Green Road and Brent Street. This would involve resurfacing the footways on three of the four corners of the junction to ensure surface consistency; we would also resurface the footway north of the junction to link to our current footway works at the Woodlands retaining wall. Signage and tactile paving would be used
- Improve the shared use footway facilities from south of Bridge Lane to link to existing shared use facilities north of Courtleigh Gardens. This would involve resurfacing the footway to ensure surface consistency and adding new signage
- Build a retaining wall to enable widening of the footway into the grass verge embankment just south of Bridge Lane
- Widen the existing unsignalised crossing located across Golders Green Road to 3.2 metres to enhance facilities for the north/south movement
- Introduce Advanced Stop Lines for cyclists on the Brent Street and Golders Green Road approaches
Martin Lucas-Smith // 1 thread
A proposal has been floating around for a while for a change to this area. The opportunity needs to be taken to avoid the right-angle turn and remove pavement cycling entirely between the parking and the river.
Created by Rob Archer // 1 thread
There is no cycle (or foot) access to Freebridge Farm from Wisbech Road. Cyclists have to negotiate a series of difficult junctions and unpleasant service roads to access thus popular pub, hotel and restaurant. To leave the site and head into King's Lynn cyclists are faced with a choice of turning left and negotiating the very busy roundabout and returning towards West Lynn, or making an illegal right turn onto the busy Clenchwarton road. Many of the staff at the site cycle and several more would like to if there was safe cycle access. The service road is less than 50m from Wisbech Road with it's reasonable quality cycleway and there are existing gaps in the hedge that could be used. Ideally a controlled (toucan) crossing should be provided.
Created by Rob Archer // 1 thread
The junction where Wisbech Road joins Clenchwarton Road by East Coast Storage is unsafe. The cycleway continues directly across the junction but is not clearly marked. The red tarmac has been warn away and give way markings painted across the cycleway where it crosses the entrance to East Coast Storage. There are also give way markings across the exit to ECS making it very difficult to ascertain who has priority.
Created by Roxanne (CEO) // 1 thread
Mixed used development comprising a Day Nursery at ground floor and 40 self-contained 1xbed student rooms at the rear and on the upper floors along with a vehicle drop-off zone, cycle parking and associated landscaping.
Romsey Labour Club Mill Road Cambridge Cambridgeshire CB1 3NL
Cambridge
Application reference : 16/0821/FUL
Created by Peter Loader // 1 thread
The Reach Free School plans to move to a permanent site in Mill End, Rickmansworth, Herts. There has been a public exhibition of the draft proposals so that the Education Funding Agency can gather feedback before it submits a planning application to Three Rivers District Council. At the exhibition, the draft cycling/walking routes linking the school to Mill End and Maple Cross seemed to be unsatisfactory and to conflict with the adopted Three Rivers Local Plan.
The Cut Bridge linking King's Lynn with West Lynn has no safe cycle facility, despite linking two sections of reasonably good quality cycleway. There is a narrow (1.2m) footway which cyclists often (illegally) use but it is too narrow to pass a pedestrian or another cyclist. There is also a low parapet with a risk of a cyclist being knocked over into the river in the event of a collision. This would almost certainly be fatal.
The 'correct' way to cross the bridge is to rejoin the carriageway, which involves (westbound) crossing on a fast, blind bend then back again after the bridge.
Possible Solutions:
1) 20mph limit extended over the bridge - preferably accompanied by average-speed cameras.
2) Narrow the road and install a wider (Min 3+1 m) shared-use path.
3) Reduce the road to a single, bi-directional lane with a full-width (2m) cycle lane either side.
Created by Trothben // 1 thread
looking at areas where broken beer bottles are common. Is it happening so often that areas should be swept weekly, monthly?
Created by Richard Keatinge // 1 thread
Congestion (especially at travel-to-work times) on the two bridges across the Menai Straits has led to suggestions for a third crossing, now being evaluated by the Welsh Office. Preliminary estimates of the cost are from £100 million to £200 million. Meanwhile, many people live on Anglesey and commute over the bridges to Bangor and Felinheli by car, contributing greatly to the congestion. The routes are easy and convenient by car but hostile by bicycle. Bicycle commuting would be easy throughout this area if the journey could be made on good-quality facilities - most journeys are in the 3 to 5 kilometre range. The aim is to attract enough commuters onto bicycles to relieve congestion at rush-hour times. The benefits will be far wider than those of the third crossing, at far less expense.
The proposal is to make cycling between all of these destinations, and especially on the routes over the Menai Straits, a pleasant and inviting means of transport. This will require good-quality protected facilities all along the main routes, traffic calming (and some possible redirections) with 20mph limits in built-up areas. Most of the space would come from the existing highway, though a limited amount of extra land would need to be used at a few specific points.
The Britannia Bridge offers space on its car deck for cycle lanes (though not quite enough for the proposed third car lane), and an unused rail line on the lower deck which would be very suitable for cycling.
Thomas Telford's Menai Bridge has already been extended to the sides by the addition of pedestrian facilities; its appearance could be enhanced by a tasteful cycle facility, extending somewhat further to the sides.
Martin Lucas-Smith // 1 thread
Formation of new cycle park on Queens' College land directly in front of the Fisher Building on Silver Street.
Queens College Silver Street Cambridge CB3 9ET
Cambridge
Application reference : 16/0804/FUL
Created by Henry Gomersall // 1 thread
This is a pretty far reaching discussion point, but one I feel is important in establishing cycling as a first class means of transport.
I apologise if this is something for which a consensus is well established, but I was unable to find anything specific on it. Or indeed, or if there is little that can be done!
The issue is that though Cambridge has loads of pavement cycle lanes, they tend to be of the kind that stop at each and every adjoining road. This is suboptimal and really slows down one's progress.
In some cases there are "helpful" give-way markings to remind the cyclist that cars go first. Slightly better are give way markings to both the adjoining road and the cycle lanes, but my experience has been that the road give way marking is often simply ignored (and it takes a brave cyclist to not slow down despite knowing they'd arrive first). Also, cars turning into the minor road from the more major road are not clearly required to give way to cyclists.
The new slightly raised cycle lanes with bus islands are clearly much better in this regard and seem to be treated by drivers with the same priority as the road they are part of. So on the whole the new infrastructure seems to be dealing with the problem properly.
However, slightly against this trend, I noticed that the wonderful cycle lane by the guided bus route by the new Great Kneighton centre (marked on the map) has a dropped kerb to the not-yet-commissioned road and little in the way to indicate it's not going to be sliced in half when the road is opened properly.
Another trend seems to be to coerce cyclists to use pedestrian/cycle crossings at junctions, e.g. where the guided bus route ends at Francis Crick Avenue and the cycle lane continues onto the Addenbrookes site.
This is part of a bigger question about how much cyclists should be considered with the same priority as motorists (consider how long it takes the cycle road crossings on Fen Causeway to change, despite all the traffic moving at a snails pace).
What if anything can we do about this? What I really want is at a minimum for cyclists to be given _equal_ priority to the drivers.
Created by David Green // 1 thread
This morning I noticed that two new concrete bollards have been installed at the North end of the Carter Cycle Bridge. These seem to be completely unnecessary and the position will probably cause accidents to cyclists descending into Devonshire Road.
Were the Campaign aware of this and can we do anything to get them removed?
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Anon // 1 thread
KCC are consulting on their first ever Active Travel Strategy
Cyclescape doesn't allow creation of a Kent wide issue, marker placed in Spokes East Kent area.
Created by Dominic Fee // 1 thread
Mayor Sadiq Khan's proposal "to rid part of the square of traffic and create a public space worthy of a Unesco Heritage Site.”
Created by Dominic Fee // 3 threads
Mayor Sadiq Khan's proposal "that would see all motor vehicles removed from Oxford Street and the space given over to pedestrians and cyclists".
Created by Roxanne (CEO) // 1 thread
Demolition of existing bungalow and erection of a three storey building consisting of 14 studio flats and associated ancillary works including a laundry room, bin store and bicycle store.
138 Brooks Road Cambridge Cambridgeshire CB1 3HR
Cambridge
Application reference : 16/0731/FUL
Created by Anna Langley // 1 thread
This morning 17.5.2016, I found this car blocking the towpath entrance on Fen Road. If you see this again, please call the Police non-emergency number 101 and report it. Especially if it is this same red Citroën MV62 JXD.
Created by Sam Wakeling // 2 threads
The nominated cycle route to avoid the University roundabout goes down Weston St and under the underpass. Entry and exit to this underpass is obstructed by metal barriers.
These make the route inconvenient for all people using bikes, and impossible to access for some recumbent, cargo bike, trailer or multi-wheeled disabled cycle users.
Created by Heather Coleman // 1 thread
Erection of 14 flats and associated bin and cycle stores following demolition of existing dwelling.
Hayling House Fen Road Cambridge Cambridgeshire CB4 1UN
Cambridge
Application reference : 16/0617/FUL
Created by JonathanF // 1 thread
Announced in 2015 as part of CCAG2. Manchester City Council, working in partnership with Transport for Greater Manchester and Salford City Council, is developing a City Centre Cycling Infrastructure Plan (CCCIP). The plan will:-
Provide a strategy to guide future investment
Provide a pipeline of cycling schemes
Prioritise cycling and transport infrastructure more effectively
Assist with bidding for future funding for investment in the city centre cycle network
A draft network plan (v3.2) was circulated at the 22nd March 2016 Stakeholder Workshop: https://drive.google.com/file/d/0B_1SI7iBXu3BN3dDbXpvSnRYYkE
GMCC has held its own workshops and discussions to produce its draft plan, the latest of which is: https://drive.google.com/file/d/0B_1SI7iBXu3BNjJDQ19rUjVEMWc
Created by Matthew Phillips // 1 thread
There is no cycle parking provided at the Sainsbury's on the A167 (former Pot and Glass).
Current County Durham policy requires 1 space per 5 FTE staff, and a minimum of two spaces for users, with an additional space for every 400 sq.m over 100 sq.m.
So I reckon it should have at least four. Were the policies in force at the time of the planning application for change of use? The previous policy was different, but stipulated a minimum of 4 spaces.
Was there a planning application, which omitted to enforce this requirement, or was it permitted development?
Created by Matthew Phillips // 1 thread
Access to Tesco by bike could be improved in various ways. The main picture shows the view from close to the entrance to the supermarket. The cycle parking is at the far end of the building near the Belisha beacon. Cycle parking should be located as close to the entrance to the building as possible, and should certainly be obvious and easy to find from there.
I will attach some other photos showing things which could be improved.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
The cycle lane on Billacombe Road is unusable due to car parking in it.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.