Mapping error note - path in Beeston
this path isn't a right of way it has a locked gate.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
this path isn't a right of way it has a locked gate.
sketch of route following verbal discussion between Brian & SB.
Created by timlennon // 0 threads
Bushy Park is a pleasant place to cycle and provides a number of potential routes for people wanting to get around the area. However, it should be possible to leave the Park at the Holly Road exit and proceed without the current level of potential conflict and threat inherent in the present route. We’d like to see protected space for cycling allowing people to leave the Holly Road exit and get to Broad Lane and the nearby schools - Denmead and Carlisle Infants.
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
Created by timlennon // 0 threads
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. Measures such as 20mph and traffic calming are needed here, along with re-alignment of parking..
Created by timlennon // 0 threads
Barnes should be a pleasant place to visit. make the whole area 20mph, and provide safe routes for cycling through the town centre away from traffic conflict. Remodel road and pavement layout to provide a family-friendly space.
Created by Simon Nuttall // 3 threads
In 2012 a long list of candidate one way streets for conversion to two-way cycling was drafted. http://www.cyclestreets.net/photomap/tags/twoway2012/
Two years later the County are now proposing a short list of 11 streets for conversion.
Created by Jon_B // 1 thread
The contra-flow cycle lane leading West on Dogs Head St was (once again) obstructed by illegally parked vehicles this morning.
I have reported the specific incident, but this seems to be to be a more general problem of lack of enforcement and commercial vehicles believing that it is acceptable for them to use these lanes for short (or not so short) stops.
In this case there were a large lorry and a van parked one behind each other forcing cyclists to pull out around them into potential oncoming traffic (including buses as can be clearly seen in the photo).
If these lanes are to form part of the planning scheme then they need to either by physically segregated so as to prevent vehicles parking on them or at the very least there needs to be a zero tolerance approach to enforcement.
If commercial vehicles do need to use them for emergency purposes (I think they may have been investigating the traffic lights which were out of order) then they should be obliged to put in place some kind of stop / go scheme to avoid conflict between cyclists and oncoming vehicles.
Created by Jean Dollimore // 1 thread
TfL officers told us last November that they have a project to improving conditions for cyclists on Camden Road. This would include "investigating the feasibility of a northbound mandatory cycle lane; a wide bus and cycle lane southbound and the removal of two- lane flares at junctions". They assumed a 12m road width, suggesting 6m for a pair of general traffic lanes together with a 2m cycle lane and 4 m bus +cycle lane.
They are now inviting CCC to a meeting to discuss cycling on the TLRN in Camden, and also take the opportunity to walk along Camden Rd to further discuss the corridor scheme they’re progressing. On further enquiry they said:
"We would prefer to take the opportunity to engage with CCC as an independent stakeholder, separate from LB Camden, in order to fully understand the campaign’s ambitions for the TLRN."
So....
1. Let's clarify what we would want on Camden Road (without taking on TfL's assumption that there must be a bus lane. And being realistic as to what might fit in at a junction. The above photo shows a potential left hook situation.
2. Can I have volunteers to join me on this walk/talk.
Jean
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Created by timlennon // 1 thread
Cycle parking at Teddington station can only be accessed by bridge from the Bushy Park side. The absence of a gutter on the bridge makes access very difficult, because the bike needs to be lifted all the way.
Created by Pixlink // 0 threads
The priority issue identified by many community stakeholders and in the Town Plan is to ensure the network of cycle paths in the town are joined up in a useful way. The restriction on two-way cycling in the Thoroughfare is a barrier having a complete network in the town. All the cycle local cycle routes feed into the town's main street, the Thoroughfare yet this "pedestrianised" road has a one-way restriction to traffic and cyclists heading northbound. Pedestrians and people in electric buggies are of course able to travel at will in any direction. Those living in residential areas in the south of the town have to cycle on main roads to the schools and industry and residential areas in the north and vice-versa.
Previous work by Sustrans and the Town Plan has identified the impracticality of only allowing one-way travel for cyclists along the Thoroughfare when this is a National Cycle Route and it conflicts with national health and transport strategy to increase cycling. Though permitting two-way cycling on a one-way street is thought politically sensitive, there is no evidence of increased danger to pedestrians and there are many examples of this practise elsewhere.
Created by Grahame Cooper // 0 threads
The cycle lane passes through the door-opening zone of parked cars in several places. This is especially dangerous on a road with a 40mph speed limit.
Created by Shaun McDonald // 0 threads
The London Road Shell garage is a pain to pass as you have to cross the path of vehicles turning in and out, and can be quite dangerous.
It would be far better to have the petrol station closer to the road, and the cycle path going behind the petrol station. This is the Dutch standard as shown in this example:
https://twitter.com/aseasyasriding/status/444203865353621504
Created by Chris Whitehouse // 0 threads
This refers to the shared cyclepath/footway across St Albans Road West at the junction with Cavendish Way.
There is a flower bed on the east side of this crossing which projects into the line of the crossing. There is also a cyclepath/footway sign on a short post in the flower bed.
At night it is very easy to take a line which sends you into the flowerbed, particularly if crossing quickly to avoid traffic exiting from St Albans Road West. It's not hard in daytime too if there is pedestrian traffic.
Please fill in and resurface a short section of flowerbed and resite the sign.
Created by Chris Whitehouse // 0 threads
This refers to the southernmost end of the short loop of Mill Green Lane to west of the A1000.
Heading north on a bike past this side road requires simultaneously looking
- 180deg back to check for vehicles turning in
- to left to check for vehicles exiting
- ahead to check for bikes heading south
Heading south on a bike past this junction requires
- looking 120deg right for vehicles exiting
- looking ahead at road for vehicles turning in
- looking ahead at cycle path for bikes heading north
- moving as far as possible to the left, ie almost into the main road because visibility of the cycle path is obstructed.
A cheap and effective solution would be to block this junction with a safety rail or similar on the line of the edge of the A1000. Motor traffic can use the north end Mill Green Lane, where there is no conflict with cycle traffic on the cycle path because cycle traffic crosses to the east side of A1000.
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Grahame Cooper // 0 threads
One-way carriageway with two lanes, one of which merges onto St Peter's Way. Narrow cycle lane (<1m) with sunken drains and detritus. If you use the cycle lane, you often get passed very close by cars. If you ride outside of the cycle lane, you sometimes get aggression from following drivers. Taking primary position in the inside lane would feel extremely dangerous as the traffic moves very fast despite the 30mph speed limit.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Kate // 1 thread
There are three schools in this ward (St. Stephens Primary, Orleans Primary, Richmond Upon Thames College) and more just on the edge of the ward boundaries (Chase Bridge, St Mary’s, Ivybridge, Worple Primary, Orleans Secondary) and there is a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast moving traffic. The roads surrounding these schools should all have 20mph zones including larger roads such as St Margarets Road, which is a heavily used link between areas. There should be car-free access around the schools, and protected routes to arrive there. In due course there should be a default 20 mile an hour limit on all residential roads in the borough.
Created by Ross // 1 thread
https://mapsengine.google.com/map/edit?gl=uk&mid=z-ea3VIs1n24.kfBnDgw-g7fg
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. The junction with the South Circular is especially unpleasant for both cycling and walking, and deeply unwelcoming.
How to do this: Raised zebra crossing at Vicarage Road, Palmerston Road and E Sheen Library, 20 mph signs to continue park speed limit to Mortlake station, removal of centre lane white lines, toucan crossing at A205 to allow cyclists to cross, with care, at same time as pedestrians, advanced stop boxes at level crossing and A205 junction, wider pavement on East side between York Way and Wayside - should be wide enough for a pushchair, improved signage and right turn access to North/South Worple Way - these are underused ward quiet routes leading to several primary schools and nurseries.
Sheen Lane is a key route in the ward, cycle volume could increase dramatically with some minor road improvements. Calming and reducing traffic on Sheen Lane would encourage recreational and school commuting cyclists to use this route more frequently. Sheen Lane as a pleasant cycle route would provide quiet cycle link routes to many schools; Tower house, Thomson House, Sheen Mount, Barnes, Ibstock, Mary Magdalens and also link together tens of miles of Thames Path and Richmond Park traffic free routes that could be enjoyed by cyclists from 8 - 80. It would attract more recreational cyclists to get off at Mortlake station and spend money and time on our high street.
Created by Matthew Phillips // 1 thread
Another student housing conversion with inadequate provision for bicycles and possibly excessive provision for cars.
Application states 8 cycle spaces, 8 car spaces and 1 disabled parking space. Total 33 student bedrooms. To go with BREEAM this would suggest 17 cycle spaces would be preferable for residents, plus visitor spaces. The cycle spaces pictured are old-fashioned -- I doubt they would actually provide that kind of rack -- but partially covered. It is unclear whether these would be in a secure area or not. They are round the back of the building.
Camden Council's proposals include the following:
- Raise junction Bartholomew Road Kentish Town Road
- Cycle gap in Kelly Street closure at Castlehaven Road
- Raise junction Anglers Lane/Willies Road/PrinceofWalesRoad
- Two way cycling in Wolsey Mews
- Raise the LeightonRoad/Torriano Avenue junction and introduce cycle gap at the central refuge island
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
The cycle lane on Billacombe Road is unusable due to car parking in it.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.