Waterfront cycle access confusing
Comments at Cycle Ipswich meeting:
* Westbound cycling is confusing as you currently technically need to ride on the pavement.
* Are vehicles really needed along here?
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Shaun McDonald // 2 threads
Comments at Cycle Ipswich meeting:
* Westbound cycling is confusing as you currently technically need to ride on the pavement.
* Are vehicles really needed along here?
Letter for TfL, copied to RCC, by local resident:
I am a resident of the Dover House Estate area and regularly use the crossroads of the Upper Richmond Road (A206) with Roehampton Lane and Rocks Lane (A306) as pedestrian, cyclist and/or car driver. There are three major issues with this junction which need to be addressed.
The first is the pedestrian crossings, which are poorly timed/synchronised and inadequate. There is a significant volume of pedestrian traffic to and from the station and bus stops and the university, yet to cross the road safely using the crossings can easily add 5 mins to the journey. This is mainly as there are push button crossings on only two of the four arms of the junction, a third having provision to cross which requires too much calculated risk (and insufficient island space considering the probability of standing in the middle for some time), and the fourth having no sensible provision at all. There is a high proportion of children using the crossing - with buggies, scooters, bikes, and on the south west corner insufficient pavement space for the volume of pedestrian traffic at peak times. The timing/synchronisation of the green men requires pedestrians to stand in the middle islands for an overly long period of time - during which time they cannot help but notice the very high level of exhaust fumes. Given that the only traffic flowing south along the A306 and allowed to turn right on to the A205 is buses and cycles, the extended wait for the green man in the middle of the A205 to head south seems unnecessary. Heading north there is a similarly unnecessary wait for the green man, as motorised traffic heading east along the A205 is also at a red light while that heading north on the A306 is on green.
The second major problem is the filter lane for motorists turning right off the A205 into the A306 to head north. This only operates at peak times, leaving motorists with a choice between being stuck in the middle waiting for a second round of lights or skipping through an amber or red light (frequently even though they were first in the queue). There is simply too much traffic heading east to not have the filter light operating for a greater part of the day. Even when the filter light is in operation it is for such an insufficiently short period that unless you are among the first three cars you are almost certainly going to wait for at least two rounds of lights - at peak times I have waited for the fifth round of lights. This in turn causes a tail back and high levels of air pollution.
The third major problem is the lack of cycle ways. There is a large number of cyclists on both these major roads but for something like a 500m radius around this junction there is no cycle way despite it bring both possible and dangerous without. The temporary narrowing of Barnes Station bridge only exacerbates the situation and since being put there some years ago seems to have been forgotten. This area is a real hole in the cycle way network and a blackspot considering the attractive options in every direction coming into/out of it.
The junction is an accident just waiting to happen on many levels. I would be grateful if you could me a detailed response to each of the points I raise with where at all possible a timetable for when they can each be expected to be resolved.
Created by Joe Adam // 4 threads
Arbury Road is proposed to be upgraded under the City Deal scheme.
In 2014 there was a consultation running on improving the Arbury Road near St Laurence Primary School.
Created by fishter // 2 threads
At the bottom of the hill there is a "chicane" for motor vehicles to negotiate. Northbound traffic must give priority to southbound traffic.
The chicane is formed by an island on the northbound side of the road. This island has a bypass to the left to allow cyclists to proceed despite oncoming traffic.
After a recent resurfacing of the road the markings for the cycle lane were omitted (see picture). This means that cyclists should now give priority to southbound traffic as the markings indicate they should not use the bypass.
Created by Jim Chisholm // 4 threads
There is now an Area Action Plan for the Northern Fringe East
This is a huge area, and if the Anglia Water Works site is also redeveloped it brings big oportunities and associated risks
The Campaign needs to be involved
Created by MJR // 1 thread
There's an OK cycleway alongside the Bawsey Drain from the Loke Road Junction but the link from the edge of the town centre 20mph zone isn't very good. The section between North Street and Loke Road involves negotiating your way across the multiple lanes of John Kennedy Road which is the northern approach to the town, or illegally using the narrow footway as many people do.
This section is crying out for one of the three or four lanes to be given back to cycling and walking and the 20mph zone to be extended to the north end of North Street.
I see Addenbrooke's have found a solution to all the bikes locked to the railings around by the front entrance.
Not, as you might hope, by providing more cycle parking, but by removing the railings.
I wandered around yesterday. There were 91 bikes parked outside of cycle rack spaces & 6 spaces free.
should be interesting for anyone who usually cant park in a cycle space over the next few days
:(
Richard
A fast road - dual carriageway in both directioms and with 6 lanes at one end. Speed limit of 30mph rarely respected - except in rushhour when speeds can be down to zero mph at times.
Cyclists can not cycle safely along either side of the road. Cars, lorries, busses etc are travelling too fast, with drivers jostling to change lanes, overtake busses or 'beat the lights'. The cyclists I see are on the pavement & I don't blame them - frankly the layout is not fit for cyclists. Fortunately the pavement is wide, there are few pedestrians and there is ample room for considerate cyclists to travel this way. More cyclists would use this roue if it was safer & if it joined up properly with Danebury Avenue & the other cycle routes in the area.
With the wide pavements & carriageway there is room for segregated cycle, pedestrian and motor vehicle routes. There may even be room for 'floating' bus stops. A zebra or Toucan crossing on the road would also reduce average speeds.
There are three strips of cobbles across NCN11 here, or maybe they're setts. It seems bad to have these on a cycle route because they are unpleasant for cycling and especially bad to put them so near a junction because rider attention should be on the junction and other road users, rather than man-made problems with the road surface.
Created by Cllr Ian Manning // 1 thread
This pinch point has always been an issue for anyone cycling North along Green End Road. The pavement suddenly becomes wider at the roundabout, forcing cyclists into conflict with cars.
Created by John Chamberlain // 3 threads
Camden are consulting on their plans to extend the Royal College Street cycle tracks to the south, down Pancras Road towards Kings Cross. Unfortunately, the plans for the junctions at St Pancras and contra-flow up Midland Road are not ready yet, so it will remain difficult to get to and from the south and east until these are finalised, but this is another link in the planned North-South route through the borough as part of the London Cycle Grid.
Details of the proposals can be found on Camden’s website at:
https://consultations.wearecamden.org/culture-environment/pancrasroad
For cyclists, the main proposals are as follows:
- Protected cycle lanes from Royal College Street to just south of Chenies Place.
- Removal of two bus-stops to make the cycle lanes continuous
- North-bound bus-stop converted to 'island' style.
- Southbound bus-stop uses Royal College Street style due to lack of road width.
- Additional protection for cyclists crossing Crowndale Road from Royal College Street.
You can reply to the consultation via Camden's website. Please also add your comments to the threads on this issue, or by email to john AT camdencyclists.org.uk . We have already had suggestions for improvements to the lane behind the bus-stop at Chenies Place. We will be saying that cyclists heading north to Royal College Street should use Goldington Crescent to avoid one set of traffic lights and the need to cross lanes. What else?
Our response needs to be in by 14th November so we'll take comments on board until the 7th.
Created by Al Storer // 1 thread
A lot of attention is given, especially by the council, to the radial routes. This is OK. But what about this key (partial) orbital?
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Martin Lucas-Smith // 1 thread
Bikes leaving the cul-de-sac, heading East, have to cross traffic twice. There is poor visibility and vehicles rat-run through the area.
With the North West Cambridge development coming forward, this problem will get worse in time.
The side roads that access the avenue are a danger to the users of the shared path. This is especially prevalent on the northbound side in the mornings. Cars seem to have two modes:
1) stationary avenue traffic - approach at speed and hit the anchors in time not to hit the queue
2) no queue on avenue - approach at speed hoping not to have to stop. Then go for it or again hit the anchors.
In both stopping cases this blocks the crossing for the cycle/pedestrian
Ideally there would be an advance giveaway line/colored tarmac to identify the possibility of crossing bikes/pedestrians
Created by David Earl // 0 threads
We (Cambridge Cycling Campaign) have received an invitation to this event: Commuting and Health – Research and Policy Forum
Wednesday 21 January 2015, 10.00am – 2.00pm
http://www.cedar.iph.cam.ac.uk/commuting-health-forum/
Free, but registration required.
"The way we travel can affect our health and the health of people around us. In the Commuting and Health in Cambridge study funded by the National Institute for Health Research (NIHR), researchers have been following the travel and physical activity patterns of commuters since 2009, seeking to understand more about why people use different modes of transport and how this is related to physical activity, health and wellbeing. A key aim of the study has been to assess the impact of new transport infrastructure in the form of the Cambridgeshire Guided Busway, which opened in 2011 and provides dedicated traffic-free facilities for buses, cyclists and pedestrians."
Created by Shaun McDonald // 1 thread
There are 3 main problems with this cycle route which would be easy to rectify:
* This cycle track is only signed from the retail park side, with no signage from the residential end of this link.
* The surface is pretty poor along here, especially if you have some shopping in panniers.
* There is also a problem with a gate part of the way along, which could pose a problem for people with a trailer or cargo bikes.
Photos:
http://www.mapillary.com/map/im/BMxiiFHdjmrrL0iqIx8WTw
http://www.mapillary.com/map/im/8Y-kQQoHYp0Y_Zjn4dziJw
Created by Shaun McDonald // 1 thread
Overview
Working together with interested parties - including cycling, pedestrian and motorised road user organisations – we have reviewed the design of a number of key junctions identified as having road safety or other significant issues for cyclists and / or pedestrians.
This junction was identified as having a particular cycle safety problem. We have therefore developed proposals to improve safety at the junction, in particular for cyclists.
The responses to this consultation will help inform our decsion making as to whether we go ahead with the scheme as proposed or make changes to the scheme.
Why We Are Consulting
Our review of this junction has shown that there is a road safety issue for cyclists, in particular those travelling northbound along the A21.
Our proposals for this junction are designed to improve sight lines to make it easier for cyclists, motorists and pedestrians to see each other and hence improve junction safety. In addition the opportunity will be taken to improve the informal pedestrian crossings to make these more visible and easier to use.
Our proposed improvements include:
Amended A21 and Oakley Road junction layout to bring the junction closer to a right angle – this will improve sight lines
The cycle lane on A21 north bound (towards Bromley) will be widened to increase the separation of cyclists from other road users.
Revised informal pedestrian crossings will be provided across Oakley Road and across A21 Hastings Road. A central island will allow roads to be crossed in stages. Informal crossing points offer pedestrians a safe point to cross, with tactile pavement for those with visual impairments.
The right turn from Hastings Road to Church Road, which is not currently physically possible, will be specifically prohibited. The revised junction layout would make this a possible manoeuvre but it would conflict with right turning traffic into Oakley Road from the north and would not be a safe movement.
We are not changing any other aspects of the junction. Traffic will still only be able to turn left (north) towards Bromley from Oakley Road, while Church Road will remain one way eastbound, with changes to the kerb layout to deter illegal movements.
The map below illustrates our proposals.
You can have your say on our proposals by following the link at the bottom of the page.
Created by BrianInBeeston // 0 threads
Proposed route of NCN 15 from Trent bridge to Clifton, following the south bank of the river Trent. The idea under discussion is for the route to be temporarily signed by Sustrans volunteer rangers in the first instance. there are also plans to sign an NCN 15 to NCN6 link route via Wilford Toll, Birdcage walk, Lenton Lane, Abbey St. NCN15 from Clifton westwards to East Midlands parkway station can be signed once the A453 works are complete.
Martin Lucas-Smith // 31 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
'Except cycles' plates missing on No Left/Right turn signs at Mackenzie Road and Stockwell Street, and shared-use signs missing on Perne Road between Natal Road and Brookfields
Created by David Earl // 2 threads
The new franchise for the Kings Cross rail line started recently. We have been sent a letter of introduction.
Created by MJR // 1 thread
Basil Drive, Coriander Road and Bay Walk are residential streets that probably should be a 20mph zone, at least to avoid sat-nav routing cars that way in preference to Rosemary Way.
Created by Hester Wells // 1 thread
"Following a request for a vehicular access outside of 27 Tenison Avenue it is
proposed to revoke a 5 metre length of Residents Parking Bay and replace it with
double yellow lines.
If you wish to object to any of these proposals you should send the grounds for
objection in writing to policyandregulation@cambridgeshire.gov.uk to reach us by no
later than 19th September 2014 quoting reference PR0147."
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.
Created by Martin A // 1 thread
This attractive former railway line would provide a useful off-road link between Ripley Greenway and Derby for commuters and leisure users.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Rogerdodge // 1 thread
Kingston Council have opened the consultation on this route, open until 17th November
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Stephan Matthiesen // 0 threads
Contraflow bike lane in Salisbury Rd for easier access from Southside to Commonwealth Pool, Pollock Halls and Holyrood Park.
I cycle past this junction a lot, and sometimes the lights are red so I wait and look at the lanes and wonder why they're like this.
Created by FrenchyF // 0 threads
There should be a dropped kerb at the foot of Braidwood Gate, leading to Dumbiedykes
Created by mike1727 // 1 thread
Traffic on the redbourn road is often fast and uncomfortable for novice/nervouse riders. The footpath running along Redbourn road sees few walkers and appears suitable for a conversion to a bike route. This is being progresses through the Herts Cycle Forum
Created by Adam Edwards // 2 threads
Shared use cycle path under construction but delayed completion now set for the end of February 2016. The path with extend the route from Hatfield station up to the town centre and then via the not so good on road lanes to the University and Business Park.
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway route from Green Park to Marylebone
Created by Richard Jennings // 1 thread
The Avenues Shambles
Few people who live in the area will be happy with the situation on The Avenues. A couple of years ago the city won a grant to improve cycle routes around the city, called a “Cycle City Ambition Grant”. The first route to be improved was the one that came along the Avenues, known as the “Pink” route. After two years of planning, public meetings and proposals we are left with the dangerous inadequate mess we see today.
Why is The Avenues Special?
Far more bikes use The Avenues than any other road in the city, "nearly 700,000 in 2016 according to the Air Quality Status Report for 2018. Most are students at UEA or workers at the Hospital and Research Parks. It’s also the route hundreds of children should be using to cycle to the City Academy School, so the potential number of cyclists could be even higher if the road were not so dangerous. Logically it should have been the highest priority for providing proper cycle tracks, but it didn’t turn out like that.
Why is it bad?
The road markings only allow enough space for one direction of flow on a two way street, so if it needs to pass traffic has to drive in the cycle lanes and when it gets busy the cycle lane simply disappear. There is basically far too much traffic for this type of design.
Why did we end up with this mess?
That’s a good question but there are clues, take a look on Tombland and the expensive paving around the cathedral gate. All this meant there just wasn’t enough money left to build the proposed cycle tracks and the present botch is the result. The council decided that the cost of doing The Avenues didn’t represent good value for money, yet doing Tombland did. This is a very suspect situation which has left us with an unacceptable, dangerous mess that simply can’t be left as it is.
What can be done?
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Dawes Jaguar // 0 threads
College Walk is in a terrible state and the ancient and totally obsolete street lamps no longer turn on at night and off during the day.
Created by Gregory Williams // 2 threads
This provides a flatter, shorter, and traffic-free alternative to the National Cycle Route 18 alignment via Sole Street.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Steven Moseley // 6 threads
Of and relating to Colchester Borough Council.