Beeston Centre E-W alternative route - Northern corridor
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
Created by timlennon // 0 threads
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. Measures such as 20mph and traffic calming are needed here, along with re-alignment of parking..
Created by timlennon // 0 threads
Barnes should be a pleasant place to visit. make the whole area 20mph, and provide safe routes for cycling through the town centre away from traffic conflict. Remodel road and pavement layout to provide a family-friendly space.
Created by Simon Nuttall // 3 threads
In 2012 a long list of candidate one way streets for conversion to two-way cycling was drafted. http://www.cyclestreets.net/photomap/tags/twoway2012/
Two years later the County are now proposing a short list of 11 streets for conversion.
Created by Jon_B // 1 thread
The contra-flow cycle lane leading West on Dogs Head St was (once again) obstructed by illegally parked vehicles this morning.
I have reported the specific incident, but this seems to be to be a more general problem of lack of enforcement and commercial vehicles believing that it is acceptable for them to use these lanes for short (or not so short) stops.
In this case there were a large lorry and a van parked one behind each other forcing cyclists to pull out around them into potential oncoming traffic (including buses as can be clearly seen in the photo).
If these lanes are to form part of the planning scheme then they need to either by physically segregated so as to prevent vehicles parking on them or at the very least there needs to be a zero tolerance approach to enforcement.
If commercial vehicles do need to use them for emergency purposes (I think they may have been investigating the traffic lights which were out of order) then they should be obliged to put in place some kind of stop / go scheme to avoid conflict between cyclists and oncoming vehicles.
Created by Jean Dollimore // 1 thread
TfL officers told us last November that they have a project to improving conditions for cyclists on Camden Road. This would include "investigating the feasibility of a northbound mandatory cycle lane; a wide bus and cycle lane southbound and the removal of two- lane flares at junctions". They assumed a 12m road width, suggesting 6m for a pair of general traffic lanes together with a 2m cycle lane and 4 m bus +cycle lane.
They are now inviting CCC to a meeting to discuss cycling on the TLRN in Camden, and also take the opportunity to walk along Camden Rd to further discuss the corridor scheme they’re progressing. On further enquiry they said:
"We would prefer to take the opportunity to engage with CCC as an independent stakeholder, separate from LB Camden, in order to fully understand the campaign’s ambitions for the TLRN."
So....
1. Let's clarify what we would want on Camden Road (without taking on TfL's assumption that there must be a bus lane. And being realistic as to what might fit in at a junction. The above photo shows a potential left hook situation.
2. Can I have volunteers to join me on this walk/talk.
Jean
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Created by timlennon // 1 thread
Cycle parking at Teddington station can only be accessed by bridge from the Bushy Park side. The absence of a gutter on the bridge makes access very difficult, because the bike needs to be lifted all the way.
Created by Pixlink // 0 threads
The priority issue identified by many community stakeholders and in the Town Plan is to ensure the network of cycle paths in the town are joined up in a useful way. The restriction on two-way cycling in the Thoroughfare is a barrier having a complete network in the town. All the cycle local cycle routes feed into the town's main street, the Thoroughfare yet this "pedestrianised" road has a one-way restriction to traffic and cyclists heading northbound. Pedestrians and people in electric buggies are of course able to travel at will in any direction. Those living in residential areas in the south of the town have to cycle on main roads to the schools and industry and residential areas in the north and vice-versa.
Previous work by Sustrans and the Town Plan has identified the impracticality of only allowing one-way travel for cyclists along the Thoroughfare when this is a National Cycle Route and it conflicts with national health and transport strategy to increase cycling. Though permitting two-way cycling on a one-way street is thought politically sensitive, there is no evidence of increased danger to pedestrians and there are many examples of this practise elsewhere.
Created by Grahame Cooper // 0 threads
The cycle lane passes through the door-opening zone of parked cars in several places. This is especially dangerous on a road with a 40mph speed limit.
Created by Shaun McDonald // 0 threads
The London Road Shell garage is a pain to pass as you have to cross the path of vehicles turning in and out, and can be quite dangerous.
It would be far better to have the petrol station closer to the road, and the cycle path going behind the petrol station. This is the Dutch standard as shown in this example:
https://twitter.com/aseasyasriding/status/444203865353621504
Created by Chris Whitehouse // 0 threads
This refers to the shared cyclepath/footway across St Albans Road West at the junction with Cavendish Way.
There is a flower bed on the east side of this crossing which projects into the line of the crossing. There is also a cyclepath/footway sign on a short post in the flower bed.
At night it is very easy to take a line which sends you into the flowerbed, particularly if crossing quickly to avoid traffic exiting from St Albans Road West. It's not hard in daytime too if there is pedestrian traffic.
Please fill in and resurface a short section of flowerbed and resite the sign.
Created by Chris Whitehouse // 0 threads
This refers to the southernmost end of the short loop of Mill Green Lane to west of the A1000.
Heading north on a bike past this side road requires simultaneously looking
- 180deg back to check for vehicles turning in
- to left to check for vehicles exiting
- ahead to check for bikes heading south
Heading south on a bike past this junction requires
- looking 120deg right for vehicles exiting
- looking ahead at road for vehicles turning in
- looking ahead at cycle path for bikes heading north
- moving as far as possible to the left, ie almost into the main road because visibility of the cycle path is obstructed.
A cheap and effective solution would be to block this junction with a safety rail or similar on the line of the edge of the A1000. Motor traffic can use the north end Mill Green Lane, where there is no conflict with cycle traffic on the cycle path because cycle traffic crosses to the east side of A1000.
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Grahame Cooper // 0 threads
One-way carriageway with two lanes, one of which merges onto St Peter's Way. Narrow cycle lane (<1m) with sunken drains and detritus. If you use the cycle lane, you often get passed very close by cars. If you ride outside of the cycle lane, you sometimes get aggression from following drivers. Taking primary position in the inside lane would feel extremely dangerous as the traffic moves very fast despite the 30mph speed limit.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Kate // 1 thread
There are three schools in this ward (St. Stephens Primary, Orleans Primary, Richmond Upon Thames College) and more just on the edge of the ward boundaries (Chase Bridge, St Mary’s, Ivybridge, Worple Primary, Orleans Secondary) and there is a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast moving traffic. The roads surrounding these schools should all have 20mph zones including larger roads such as St Margarets Road, which is a heavily used link between areas. There should be car-free access around the schools, and protected routes to arrive there. In due course there should be a default 20 mile an hour limit on all residential roads in the borough.
Created by Ross // 1 thread
https://mapsengine.google.com/map/edit?gl=uk&mid=z-ea3VIs1n24.kfBnDgw-g7fg
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. The junction with the South Circular is especially unpleasant for both cycling and walking, and deeply unwelcoming.
How to do this: Raised zebra crossing at Vicarage Road, Palmerston Road and E Sheen Library, 20 mph signs to continue park speed limit to Mortlake station, removal of centre lane white lines, toucan crossing at A205 to allow cyclists to cross, with care, at same time as pedestrians, advanced stop boxes at level crossing and A205 junction, wider pavement on East side between York Way and Wayside - should be wide enough for a pushchair, improved signage and right turn access to North/South Worple Way - these are underused ward quiet routes leading to several primary schools and nurseries.
Sheen Lane is a key route in the ward, cycle volume could increase dramatically with some minor road improvements. Calming and reducing traffic on Sheen Lane would encourage recreational and school commuting cyclists to use this route more frequently. Sheen Lane as a pleasant cycle route would provide quiet cycle link routes to many schools; Tower house, Thomson House, Sheen Mount, Barnes, Ibstock, Mary Magdalens and also link together tens of miles of Thames Path and Richmond Park traffic free routes that could be enjoyed by cyclists from 8 - 80. It would attract more recreational cyclists to get off at Mortlake station and spend money and time on our high street.
Created by Matthew Phillips // 1 thread
Another student housing conversion with inadequate provision for bicycles and possibly excessive provision for cars.
Application states 8 cycle spaces, 8 car spaces and 1 disabled parking space. Total 33 student bedrooms. To go with BREEAM this would suggest 17 cycle spaces would be preferable for residents, plus visitor spaces. The cycle spaces pictured are old-fashioned -- I doubt they would actually provide that kind of rack -- but partially covered. It is unclear whether these would be in a secure area or not. They are round the back of the building.
Camden Council's proposals include the following:
- Raise junction Bartholomew Road Kentish Town Road
- Cycle gap in Kelly Street closure at Castlehaven Road
- Raise junction Anglers Lane/Willies Road/PrinceofWalesRoad
- Two way cycling in Wolsey Mews
- Raise the LeightonRoad/Torriano Avenue junction and introduce cycle gap at the central refuge island
Created by Hester Wells // 4 threads
As part of the Cycle City Ambition Grants there are proprosals to install wide, segregated or hybrid cycle lanes, with priority over sideroads, on Hills Road.
Created by Jack Thurston // 1 thread
Cycling is not permitted in 'Red Square', the red-paved pedestrian area of the centre of Abergavenny.
Even so, cycle route 42 runs through it...
An interesting blog post on cycling in pedestrianised areas:
http://aseasyasridingabike.wordpress.com/2014/03/03/cycling-in-pedestrianised-areas/
One solution is to make the entire area 'shared use'. Another would be to restrict the prohibition on cycling to the busies times of day, eg. Mon-Sat 10am-4pm, and allowing unrestricted cycling at all other times.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Stephan Matthiesen // 0 threads
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Kevin Ablitt // 1 thread
As you can see in the photo there is a shared use path on river side of West End Rd just east of Bobby Robson bridge. But then where ? How far does it go ? It is certainly no good if you want to cross Princes Street- you cant unless you go up to the Burrel Road end of the bridge. And anyway once you get over Princes Street along Commercial Road and Grafton Way it is a narrow footpath which is not shared use.
It would be good to connect Bobby Robson Bridge and the Waterfront.
Directly and not by switching over to the other path and then over two toucans. Perhaps even a wide cycle crossing of the 4 lanes of Stoke St ? That would be brilliant.
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Peter Loader // 1 thread
This proposed Berry Lane Estate to Shepherd Primary School, Mill End cycle route follows:
* Chiltern Drive.
* Part of Shepherds Lane.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.