Cycle route connection needed on Woodbridge Road by Rushmere Common
We need a cycle route connection alongside this part of Woodbridge Road by Rushmere Common.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Andrea // 0 threads
We need a cycle route connection alongside this part of Woodbridge Road by Rushmere Common.
Created by Shaun McDonald // 2 threads
Comments at Cycle Ipswich meeting:
* Westbound cycling is confusing as you currently technically need to ride on the pavement.
* Are vehicles really needed along here?
Letter for TfL, copied to RCC, by local resident:
I am a resident of the Dover House Estate area and regularly use the crossroads of the Upper Richmond Road (A206) with Roehampton Lane and Rocks Lane (A306) as pedestrian, cyclist and/or car driver. There are three major issues with this junction which need to be addressed.
The first is the pedestrian crossings, which are poorly timed/synchronised and inadequate. There is a significant volume of pedestrian traffic to and from the station and bus stops and the university, yet to cross the road safely using the crossings can easily add 5 mins to the journey. This is mainly as there are push button crossings on only two of the four arms of the junction, a third having provision to cross which requires too much calculated risk (and insufficient island space considering the probability of standing in the middle for some time), and the fourth having no sensible provision at all. There is a high proportion of children using the crossing - with buggies, scooters, bikes, and on the south west corner insufficient pavement space for the volume of pedestrian traffic at peak times. The timing/synchronisation of the green men requires pedestrians to stand in the middle islands for an overly long period of time - during which time they cannot help but notice the very high level of exhaust fumes. Given that the only traffic flowing south along the A306 and allowed to turn right on to the A205 is buses and cycles, the extended wait for the green man in the middle of the A205 to head south seems unnecessary. Heading north there is a similarly unnecessary wait for the green man, as motorised traffic heading east along the A205 is also at a red light while that heading north on the A306 is on green.
The second major problem is the filter lane for motorists turning right off the A205 into the A306 to head north. This only operates at peak times, leaving motorists with a choice between being stuck in the middle waiting for a second round of lights or skipping through an amber or red light (frequently even though they were first in the queue). There is simply too much traffic heading east to not have the filter light operating for a greater part of the day. Even when the filter light is in operation it is for such an insufficiently short period that unless you are among the first three cars you are almost certainly going to wait for at least two rounds of lights - at peak times I have waited for the fifth round of lights. This in turn causes a tail back and high levels of air pollution.
The third major problem is the lack of cycle ways. There is a large number of cyclists on both these major roads but for something like a 500m radius around this junction there is no cycle way despite it bring both possible and dangerous without. The temporary narrowing of Barnes Station bridge only exacerbates the situation and since being put there some years ago seems to have been forgotten. This area is a real hole in the cycle way network and a blackspot considering the attractive options in every direction coming into/out of it.
The junction is an accident just waiting to happen on many levels. I would be grateful if you could me a detailed response to each of the points I raise with where at all possible a timetable for when they can each be expected to be resolved.
Created by Joe Adam // 4 threads
Arbury Road is proposed to be upgraded under the City Deal scheme.
In 2014 there was a consultation running on improving the Arbury Road near St Laurence Primary School.
Created by fishter // 2 threads
At the bottom of the hill there is a "chicane" for motor vehicles to negotiate. Northbound traffic must give priority to southbound traffic.
The chicane is formed by an island on the northbound side of the road. This island has a bypass to the left to allow cyclists to proceed despite oncoming traffic.
After a recent resurfacing of the road the markings for the cycle lane were omitted (see picture). This means that cyclists should now give priority to southbound traffic as the markings indicate they should not use the bypass.
Created by Jim Chisholm // 4 threads
There is now an Area Action Plan for the Northern Fringe East
This is a huge area, and if the Anglia Water Works site is also redeveloped it brings big oportunities and associated risks
The Campaign needs to be involved
Created by MJR // 1 thread
There's an OK cycleway alongside the Bawsey Drain from the Loke Road Junction but the link from the edge of the town centre 20mph zone isn't very good. The section between North Street and Loke Road involves negotiating your way across the multiple lanes of John Kennedy Road which is the northern approach to the town, or illegally using the narrow footway as many people do.
This section is crying out for one of the three or four lanes to be given back to cycling and walking and the 20mph zone to be extended to the north end of North Street.
I see Addenbrooke's have found a solution to all the bikes locked to the railings around by the front entrance.
Not, as you might hope, by providing more cycle parking, but by removing the railings.
I wandered around yesterday. There were 91 bikes parked outside of cycle rack spaces & 6 spaces free.
should be interesting for anyone who usually cant park in a cycle space over the next few days
:(
Richard
A fast road - dual carriageway in both directioms and with 6 lanes at one end. Speed limit of 30mph rarely respected - except in rushhour when speeds can be down to zero mph at times.
Cyclists can not cycle safely along either side of the road. Cars, lorries, busses etc are travelling too fast, with drivers jostling to change lanes, overtake busses or 'beat the lights'. The cyclists I see are on the pavement & I don't blame them - frankly the layout is not fit for cyclists. Fortunately the pavement is wide, there are few pedestrians and there is ample room for considerate cyclists to travel this way. More cyclists would use this roue if it was safer & if it joined up properly with Danebury Avenue & the other cycle routes in the area.
With the wide pavements & carriageway there is room for segregated cycle, pedestrian and motor vehicle routes. There may even be room for 'floating' bus stops. A zebra or Toucan crossing on the road would also reduce average speeds.
There are three strips of cobbles across NCN11 here, or maybe they're setts. It seems bad to have these on a cycle route because they are unpleasant for cycling and especially bad to put them so near a junction because rider attention should be on the junction and other road users, rather than man-made problems with the road surface.
Created by Cllr Ian Manning // 1 thread
This pinch point has always been an issue for anyone cycling North along Green End Road. The pavement suddenly becomes wider at the roundabout, forcing cyclists into conflict with cars.
Created by John Chamberlain // 3 threads
Camden are consulting on their plans to extend the Royal College Street cycle tracks to the south, down Pancras Road towards Kings Cross. Unfortunately, the plans for the junctions at St Pancras and contra-flow up Midland Road are not ready yet, so it will remain difficult to get to and from the south and east until these are finalised, but this is another link in the planned North-South route through the borough as part of the London Cycle Grid.
Details of the proposals can be found on Camden’s website at:
https://consultations.wearecamden.org/culture-environment/pancrasroad
For cyclists, the main proposals are as follows:
- Protected cycle lanes from Royal College Street to just south of Chenies Place.
- Removal of two bus-stops to make the cycle lanes continuous
- North-bound bus-stop converted to 'island' style.
- Southbound bus-stop uses Royal College Street style due to lack of road width.
- Additional protection for cyclists crossing Crowndale Road from Royal College Street.
You can reply to the consultation via Camden's website. Please also add your comments to the threads on this issue, or by email to john AT camdencyclists.org.uk . We have already had suggestions for improvements to the lane behind the bus-stop at Chenies Place. We will be saying that cyclists heading north to Royal College Street should use Goldington Crescent to avoid one set of traffic lights and the need to cross lanes. What else?
Our response needs to be in by 14th November so we'll take comments on board until the 7th.
Created by Al Storer // 1 thread
A lot of attention is given, especially by the council, to the radial routes. This is OK. But what about this key (partial) orbital?
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Martin Lucas-Smith // 1 thread
Bikes leaving the cul-de-sac, heading East, have to cross traffic twice. There is poor visibility and vehicles rat-run through the area.
With the North West Cambridge development coming forward, this problem will get worse in time.
The side roads that access the avenue are a danger to the users of the shared path. This is especially prevalent on the northbound side in the mornings. Cars seem to have two modes:
1) stationary avenue traffic - approach at speed and hit the anchors in time not to hit the queue
2) no queue on avenue - approach at speed hoping not to have to stop. Then go for it or again hit the anchors.
In both stopping cases this blocks the crossing for the cycle/pedestrian
Ideally there would be an advance giveaway line/colored tarmac to identify the possibility of crossing bikes/pedestrians
Created by David Earl // 0 threads
We (Cambridge Cycling Campaign) have received an invitation to this event: Commuting and Health – Research and Policy Forum
Wednesday 21 January 2015, 10.00am – 2.00pm
http://www.cedar.iph.cam.ac.uk/commuting-health-forum/
Free, but registration required.
"The way we travel can affect our health and the health of people around us. In the Commuting and Health in Cambridge study funded by the National Institute for Health Research (NIHR), researchers have been following the travel and physical activity patterns of commuters since 2009, seeking to understand more about why people use different modes of transport and how this is related to physical activity, health and wellbeing. A key aim of the study has been to assess the impact of new transport infrastructure in the form of the Cambridgeshire Guided Busway, which opened in 2011 and provides dedicated traffic-free facilities for buses, cyclists and pedestrians."
Created by Shaun McDonald // 1 thread
There are 3 main problems with this cycle route which would be easy to rectify:
* This cycle track is only signed from the retail park side, with no signage from the residential end of this link.
* The surface is pretty poor along here, especially if you have some shopping in panniers.
* There is also a problem with a gate part of the way along, which could pose a problem for people with a trailer or cargo bikes.
Photos:
http://www.mapillary.com/map/im/BMxiiFHdjmrrL0iqIx8WTw
http://www.mapillary.com/map/im/8Y-kQQoHYp0Y_Zjn4dziJw
Created by Shaun McDonald // 1 thread
Overview
Working together with interested parties - including cycling, pedestrian and motorised road user organisations – we have reviewed the design of a number of key junctions identified as having road safety or other significant issues for cyclists and / or pedestrians.
This junction was identified as having a particular cycle safety problem. We have therefore developed proposals to improve safety at the junction, in particular for cyclists.
The responses to this consultation will help inform our decsion making as to whether we go ahead with the scheme as proposed or make changes to the scheme.
Why We Are Consulting
Our review of this junction has shown that there is a road safety issue for cyclists, in particular those travelling northbound along the A21.
Our proposals for this junction are designed to improve sight lines to make it easier for cyclists, motorists and pedestrians to see each other and hence improve junction safety. In addition the opportunity will be taken to improve the informal pedestrian crossings to make these more visible and easier to use.
Our proposed improvements include:
Amended A21 and Oakley Road junction layout to bring the junction closer to a right angle – this will improve sight lines
The cycle lane on A21 north bound (towards Bromley) will be widened to increase the separation of cyclists from other road users.
Revised informal pedestrian crossings will be provided across Oakley Road and across A21 Hastings Road. A central island will allow roads to be crossed in stages. Informal crossing points offer pedestrians a safe point to cross, with tactile pavement for those with visual impairments.
The right turn from Hastings Road to Church Road, which is not currently physically possible, will be specifically prohibited. The revised junction layout would make this a possible manoeuvre but it would conflict with right turning traffic into Oakley Road from the north and would not be a safe movement.
We are not changing any other aspects of the junction. Traffic will still only be able to turn left (north) towards Bromley from Oakley Road, while Church Road will remain one way eastbound, with changes to the kerb layout to deter illegal movements.
The map below illustrates our proposals.
You can have your say on our proposals by following the link at the bottom of the page.
Created by BrianInBeeston // 0 threads
Proposed route of NCN 15 from Trent bridge to Clifton, following the south bank of the river Trent. The idea under discussion is for the route to be temporarily signed by Sustrans volunteer rangers in the first instance. there are also plans to sign an NCN 15 to NCN6 link route via Wilford Toll, Birdcage walk, Lenton Lane, Abbey St. NCN15 from Clifton westwards to East Midlands parkway station can be signed once the A453 works are complete.
Martin Lucas-Smith // 31 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
'Except cycles' plates missing on No Left/Right turn signs at Mackenzie Road and Stockwell Street, and shared-use signs missing on Perne Road between Natal Road and Brookfields
Created by David Earl // 2 threads
The new franchise for the Kings Cross rail line started recently. We have been sent a letter of introduction.
Created by MJR // 1 thread
Basil Drive, Coriander Road and Bay Walk are residential streets that probably should be a 20mph zone, at least to avoid sat-nav routing cars that way in preference to Rosemary Way.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Paul James // 1 thread
The exit from the car park crosses the shared use path and is blind from the drivers POV if they stop at the give way markings. This means that drivers will move blindly across the shared use path without being able to see cycles moving along the path.
The solution is to close the gate to motor traffic.
The carpark is accessible from both the driveway to Pools on the Park and from Kew Foot Road and the entrance from Pools on the Park would appear adequate to act as both an entrance and an exit.
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Elizabeth E. // 1 thread
TfL are making changes to junction because of safety issues.
For Cyclists:
Two-stage right turns at the junction in the west to south and east to north directions
An early release at the traffic lights on all four arms of the junction
Deeper Advanced Stop Lines (ASLs)
Mandatory cycle lane on Camberwell Church Street westbound approach to operate at all times
St Giles bus stop moved further west from the Vicarage Grove junction to improve safety of left turning cyclists on the LCN 23 cycle route
Resurfacing throughout the junction.
Retention of the 20mph speed limit at the junction and on all the approaches.
Created by Andrea // 1 thread
Remove left-turn priority filter: if you want to cycle to the station from Stoke Park Drive, you currently get a lot of stress from drivers honking at you from behind
Created by Jean Dollimore // 1 thread
Camden is consulting on improving safety for pedestrians in the vicinity of Hampstead School in Westbere Road.
See StreetView from Lichfield Road (Barnet) towards Westbere Road Camden showing Hampstead School on the left and the 20 mph sign
Created by jpennycook // 1 thread
There is a petition to signalise Golden Pot junction, near Alton, on the B3349 (The Avenue/Froyle Road/Old Odiham Road junction)
"Hampshire County Council: I would like to start a petition to have traffic lights put at the Golden Pot crossroads.
Petition by Philippa Webster"
Created by Shaun McDonald // 0 threads
The traffic lights don't detect cyclists, thus you potentially have to wait ages until a car comes up behind you.
Kate Ravilious // 2 threads
The Fishergate Gyratory is a complete nightmare for all cyclists and very dangerous. Crossing the lanes of the busy dual carriage-way is dangerous and drivers show little awareness or patience with cyclists. The entire junction needs rethinking.
Created by Clare Gibbons // 0 threads
I propose the creation of bike/bus scheme: a bus service for Sundays and Bank holidays leaving Cambridge Rail Station, heading out through Barton Road and linking Burwash Manor, Wimpole Hall, Gamlingay Woods, Great Gransden Woods etc in a circular route. Short cycle routes to be developed around villages along the route. Cyclists can choose the length of journey they want to make and be assured of a ride home by bus if they do not wish to cycle back to Cambridge...
A 24 cycle bike-trailer can be towed behind a 20 seater bus, providing sustainable tourism access to South Cambridgeshire and passenger transport services for settlements that do not currently have Sunday services. Please respond and state whether you would be interested in such a service.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by North Devon Cycling Forum // 0 threads
Change of Road lay out on Long Bridge; NO new centre road line when road is due resurfacing and long term research into "shared space" alternative road surface
Created by Shaun McDonald // 1 thread
Recently near Petts Wood station there has been a similar junction where the main flow of traffic is round the corner, whilst being a crossroads, which has been changed to a mini roundabout which slows the traffic more and makes it easier for cyclists. http://osm.org/go/0EEBtsaNj-?m
I'm wondering if the same can happen here.
Created by Andrew Woodward // 0 threads
Southbound cyclelane ends abruptly in row of parked cars forcing cyclists out into often fast moving traffic whilst trying to climb a hill.
Created by jpennycook // 1 thread
Erection of Class A1 and Class A3/A5 units. Provision of highway works and alterations to access; parking; landscaping; service infrastructure; and associated works and improvements.
St Michaels Retail Park The Harrow Way Basingstoke Hampshire
Basingstoke
Application reference : 16/04208/FUL
NCN45 across Peckforton Hill at risk of being closed
Created by Simon B // 1 thread
Adjacent to existing apartments on Sealand Road near the Cop is a new development currently under construction by Watkins Homes Ltd. Curently there is a barriered-off ramped access to Sealand Road to cross the Canal entrance to the river that leads around the exisiting apartments. This was originally envisaged as part of a continuous shared use riverside route.
The development of the site offers the opportunity to ensure that shared use access can be maintained, developed and improved along the riverside route that skirts the perimiter of the Racecourse and continues to the River Dee path that leads to Garden City and Queensferry. This could be before residents purchase properties who could well be resistant to a pathway near their new homes.
Whilst the access to the River Dee from the Shropshire Union Canal presents a barrier to a straightforward continuation of the riverside route to join the River Dee shared use path into Wales, the creation of a small extension around the permiter of the new development under construction would mean that an attractive continuous offroad route could be created with minimal additional works (widening of the existing footway for approximately 100mtrs).
It would be helpful to gather thoughts and ideas before the developers and Planning and Highways Department of the Local Authority are approached about this opportunity
Created by Roxanne (CEO) // 0 threads
Plans are emerging for development on the Coldham's Lane site with implications for the surrounding area including links with Cherry Hinton.
Created by GinaroZ // 1 thread
See: https://goo.gl/maps/sZEe3AdMN8v - dropped kerb and step removal required for NEPN access from Bonnington Grove. The other side at Dalmeny Road has step-free access.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
Created by David Wilcox // 1 thread
Proposal
To provide either a fully segregated two-way cycle facility on the south side or a suitable alternative on Commercial Road and Clarence Road. If delivered this would provide an excellent East/West route that extends from Avonmouth to Temple Meads and beyond.
This scheme would tie in with proposals on Redcliffe Hill. BRT designs will be considered in conjunction with the proposals. This route will significantly help achieve the Local Enterprise Zone sustainable transport aims.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF Proposal.
Created by Kate // 1 thread
This spot is part of the route that has potential to help people cycling avoid congested unappealing George Street in order to get to Richmond station or other parts of Richmond from the riverside. When you come up Friars Lane from the riverside you reach a junction where the traffic is one way away from central Richmond.
If you follow the one way system left around the Green you add at least 5 minutes to your journey time. You cannot turn right and take the quicker route because it is one way. You also cannot turn right up King Street to join George Street because that is also one way.
You also cannot go straight across the path on the Green as this is officially a footpath.
There is more than one possible solution here: a contraflow for cyclists on the side of the Green nearest to George Street. A cycle path alongside the footpath straight across the Green.
King Street would also benefit from a contraflow which would open up the options for cyclists - particularly when the riverside route is flooded.
Created by Stephan Matthiesen // 1 thread
The gate at the north end of the Innocent tunnel only leaves a narrow opening.
1. It's generally too narrow for trailers etc.
2. You move from bright light outside into the darkness of the tunnel, and going into the tunnel you often can't see people cycling or walking out; this would not be an issue of the full width of the path was usable.
3. The gap is at the edge of the path with various surface defects
Created by Simon Nuttall // 3 threads
London Cycling Campaign's Space for Cycling campaign
Has a clear message - what can we learn from them?
Barriers, so many barriers, most of which should be removed.