Traffic Light Sensor
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by Tom Chance // 1 thread
Making it safe and convenient to travel from Sydenham Hill onto London Road and then onto Wood Vale would improve the link from this part of Sydenham / Crystal Palace into East Dulwich and onto the LCN 25 and 22 routes north.
Currently one can either dismount at the bottom of the hill, cross Sydenham Hill and then London Road by foot and then take the off-road cycle lane onto Wood Vale; or one can cycle left onto London Road, cross two lanes of traffic, brake into the little cut and cross over the southbound traffic to get onto Wood Vale. The first route is slow and inconvenient, the second is dangerous.
Created by David Earl // 1 thread
According to the Cambridgeshire Road works register, Pembroke Street is going to be closed for a long period starting September 2 by the museum of Zoology. Not clear what, if any, the impact on cycles would be, but the hole will be a dramatic 10m deep, so the works will presumably be quite extensive. Also, Tennis Court Road closed for one day on August 9 to prepare.
http://roadworks.org/?u_se_id=30862209:1&e=545014&n=258186&z=7&t=b
Created by Chris Sandbrook // 1 thread
I have just watched a police car over-run the advanced stop lines twice on Gilbert road, once at the Carlton Way cross roads and then again at the Milton Road T-junction. Both times the police car was approaching an already red light, so they had ample time to stop before the line. The second time they filled at least half of the box. If the police in Cambridge can't be relied on to respect the advanced stop line, how can we expect the general public to do so? Does anyone have similar stories or any suggestions on what to do about it? I didn't get the number plate unfortunately, because I thought turning round and photographing a police car on my phone might be more trouble than it's worth!
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WilliamNB // 0 threads
When cycling north-bound along Tavistock Road, there is a cycle lane in places. Once out from under the Crownhill Road bridge the lane turns sharply left, forcing cyclists to yield to traffic joining Tavistock Road from the left.
The Highway Code states you should yield to traffic from the right and this junction is very dangerous to cyclists. It would be far better to simply continue the cycle lane straight ahead and erect yield signs to traffic joining Tavistock Road
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Martin Lucas-Smith // 1 thread
The Cambridge News reports that new traffic calming is to be installed on Fen Road.
Cyclists' views ought to be included so the opportunity is taken to improve things for cycling rather than make things worse.
http://www.cambridge-news.co.uk/News/150k-project-to-tackle-Fen-Road-racers-20130803060000.htm
Created by DaveE // 0 threads
The dropped kerb is about 5-10m down the pavement from where the cycle-path meets the road. This encourages cyclists to cycle along the pavement and there are no shared use signs to warn pedestrians.
Created by DaveE // 0 threads
The link between the cycle-path and Trent Close is missing. It is expected that cyclists should dismount, negotiate a large number of parked cars, and an un-dropped kerb to go from cycle path to road or vice-versa. This is unreasonable and I can't think of a reason not to have the cycle path join straight into the end of the road with no interruption.
The current situation encourages cyclists to cycle along the pavement for entire length of Trent Close to reach a dropped kerb, causing unecessary delay and potential conflict between cyclists and pedestrians, as the pavement isn't very wide.
Created by DaveE // 0 threads
The road surface on Wimlands Road is quite dangerously poor. There is much gravel on the road, particularly in the centre, and there are numerous small potholes to dodge.
This is leading to a risk of accidents involving cyclists and putting off inexperienced cyclists from cycling to work.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
The condition of the cyclepath is so bad that a road bike with narrow tyres cannot be comfortably or safely ridden along the cycle side of the segregared path. There are numerous potholes of more than 25mm depth and quite a bit of loose gravel besides a generally very rough surface. The surface is more pothole than surface in places! It is even bad for mountain bikes and especially bad for small wheeled bicycles such as folding bicycles. This is forcing cyclists to use the pedestrian side of the path, with the potential for safety issues and confrontation. Last seen mid July 2013.
Cycling provision totally inadequate in proposals.
Created by Jon Warbrick // 1 thread
Contractor's safety fencing for some of the work going on adjacent to Addenbrookes has been put up on the adjacent cycle path, presumably because it's easier to to that than put it up in the building site itself. Unfortunately this obstructs about a third of the path.
Whoever did this obviously realised that this was problematic, since they have painted the path side of all the bases yellow. Unfortunately this doesn't help in the dark.
I can't see any obvious contact details for the contractors, apart from 'Tamdown' on an attached 'Danger - Deep Excavation' sign. Anyone any idea how to get this addressed?
Notice is herby given that Southampton city council
proposes to make the following
The City of Southampton(various roads)
(movement restrictions)(amendment no9)order 2013
1. the effect of the order is to remove the contraflow cycle lane on
second avenue between first avenue and the north-westernmost
access to the NXP site, approximately 150metres south-east of allington
road thus reverting this part of second avenue to two way traffic. The
contraflow cycle lane will remain on the part of second avenue between
the north-westernmost access to the NXP site and allington road.
2.Copies of the order, relevant map and statement of reasons for
proposing may be inspected during normal working hours at my enquiry
office. Further information may also be obtained from the Southampton
Highways Partnership (traffic management) on 02380798064
3.Any person wishing to object to the order must write to at the
address given below or email:
Traffic.Orders.legal@southampton.gov.uk stating the grounds for
objection within 21 days of this notice (i.e. by 2 August 2013)
Dated 12 July 2013
Richard Ivory Head Of Legal, HR and Democratic Services,
Created by Sam Saunders // 0 threads
The Brunel Mile is a notional route between Millennium Square and Temple Meads Station. A video (date uncertain) on the Better By Bike website shows the intended journey. http://www.betterbybike.info/video-list/millennium-square-to-bristol-temple-meads-along-brunel-mile
Some of the route shown in the video corresponds with Bristol Cycling Campaign's important orbital freeway: Fo1 Inner Loop Redcliffe Way to Triangle. (see https://maps.google.co.uk/maps/ms?msid=213139683046776952805.0004d820d652973f23c70&msa=0&ll=51.491805,-2.665343&spn=0.025758,0.032959&dg=feature) To enable a network to develop coherently as it grew, Fo1 would be our recommended route.
As it stands (July 2013) there is only one short section of the Brunel Mile that meets a majority of the criteria that would characterise a cycling Freeway, namely the segregated cycle lane across Redcliffe Bridge which fails only on the "continuous" criterion. It seems important that all of it should do, as a priority, given that sections of the Brunel Mile are very heavily used by cyclists and pedestrians, especially at peak times. For many visitors coming by train with cycles or using the Brompton Dock at Temple Meads this will be a first experience of cycling in Bristol. It needs to make sense and to be easy to use first time.
Issues and suggestions, as things stand, are as follows
1. Pero's Bridge already has too much pedestrian and cycle traffic. It is often uncomfortable for pedestrians and for cyclists. Keeping it as part of a major cycle route through the city is unacceptable. Route Fo1 uses Prince Street instead, where a wide segregated cycle lane would be feasible.
2. The Royal Oak Avenue, Queen Square and Bell Avenue sections would benefit from clear segregation of pedestrians and cyclists, along the lines suggested by the de facto segregation that tends to happen at peak times.
3. The pedestrian and cycle crossing at Welsh Back might benefit from an analysis of behaviour at that junction and consideration of standards adopted in other places. Casual observation suggests a great deal of uncertainty among all road users as to what is supposed to happen and who has priority.
4. At the end of Redcliffe Bridge cyclists are faced with uncertainty as to whether to continue along the paved area beside Freshford House or use the pavement alongside Redcliffe Way. Signage at that point (as it is all along the route) is confusing, inconsistent and unspecific.
5. Crossing Redcliffe Street by cycling straight over the zebra crossing and expecting cars to stop seems to be condoned, and practised. This doesn't feel right and matches no standards that I am aware of. A clear decision needs to be made about how cyclists and pedestrians can cross here without arcane knowledge of "Bristol Rules". Many of those using this (as on the other crossings on the Brunel Mile) are visitors to the city on their first mile of city cycling.
6. The following section of Portwall Lane could be made into a fully segregated cycle lane, with a better crossing at Phippen Street. The numbers of pedestrians, cyclists and out-of-office smokers on this section can be very high and leaving the traffic to fend for itself is inimical to a genuine 8-80 environment.
7. At the end of the Portway there is great ambiguity about how to reach Temple Meads on a bike. The Better By Bike video shows the least satisfactory option that ends abruptly on the wrong side of Temple Way with two busy pedestrian crossings and an unsatisfactory cobbled road to negotiate before reaching the front of the station. Most cyclists seem to use one of the more direct routes over light controlled crossings to The Friary, thence to the side entrance of Temple Meads where the presence of the Brompton Docks and the Cycle Hub van give a natural welcome.
8. Development work on the derelict "island" around Portwall Road East should take full account of the existing use of that section as a crossing point for cyclists and pedestrians getting to and from Temple Meads Station.
In conclusion, A cyclist coming off the platforms at Temple Meads should be able to see very clear signs about which exit to use, and which path to use to get to Bristol City Centre. At present there is nothing at all. Once they have made an exit they should be able to see cycling specific signs that are prominent and clear. They should then be able to follow a designated route that is self-evident and waymarked. The current pedestrian signs are elegant and have good maps, but they are no more use to cyclists than they are to motorists.
A cyclist wanting to get to Temple Meads Station from Bristol City Centre should be able to find the Brunel Mile (on Fo1) from wherever they are without too much difficulty, and then follow it confidently all the way to the railway platforms.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by Eric Booth // 1 thread
I need to report a problem with a route in Whitehall. The council made a hoohaa about linking the cycle path to St George Park. They installed a contraflow in Stretford Road, a bike crossing over Whitehall Road and signage between the cycle path and the park. Laudable. I have used this route to take my daughter to Whitehall Primary School on Johnsons Road for the last year. She had her first Bikeability Lesson on Sunday and is now riding to school (aged 6 - v. proud!!). However, where the link goes through a snicket between the Kings Head pub and Packers Field it is being blocked by cars. This is making navigating a blind corner even more dangerous. Links to pictures below.
A lot of money was spent on this link and its being rendered unusable.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Stephan Matthiesen // 1 thread
A large number of brick strips have been installed across the path in Magdalene Glen in early 2017.
While these do nothing at all to deter fast cyclists, they are a real pain for slow cyclists, people with arthritic hands (due to the vibrations and need to grip the handlebar very strongly).
It is not clear if there has been any consultation about these measures. Neither Spokes nor anybody on the CEC forum seems to have been aware of the plans.
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Stephan Matthiesen // 0 threads
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Kevin Ablitt // 1 thread
As you can see in the photo there is a shared use path on river side of West End Rd just east of Bobby Robson bridge. But then where ? How far does it go ? It is certainly no good if you want to cross Princes Street- you cant unless you go up to the Burrel Road end of the bridge. And anyway once you get over Princes Street along Commercial Road and Grafton Way it is a narrow footpath which is not shared use.
It would be good to connect Bobby Robson Bridge and the Waterfront.
Directly and not by switching over to the other path and then over two toucans. Perhaps even a wide cycle crossing of the 4 lanes of Stoke St ? That would be brilliant.
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Peter Loader // 1 thread
This proposed Berry Lane Estate to Shepherd Primary School, Mill End cycle route follows:
* Chiltern Drive.
* Part of Shepherds Lane.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.