Beeston Centre E-W alternative route - Northern corridor
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
Created by timlennon // 0 threads
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. Measures such as 20mph and traffic calming are needed here, along with re-alignment of parking..
Created by timlennon // 0 threads
Barnes should be a pleasant place to visit. make the whole area 20mph, and provide safe routes for cycling through the town centre away from traffic conflict. Remodel road and pavement layout to provide a family-friendly space.
Created by Simon Nuttall // 3 threads
In 2012 a long list of candidate one way streets for conversion to two-way cycling was drafted. http://www.cyclestreets.net/photomap/tags/twoway2012/
Two years later the County are now proposing a short list of 11 streets for conversion.
Created by Jon_B // 1 thread
The contra-flow cycle lane leading West on Dogs Head St was (once again) obstructed by illegally parked vehicles this morning.
I have reported the specific incident, but this seems to be to be a more general problem of lack of enforcement and commercial vehicles believing that it is acceptable for them to use these lanes for short (or not so short) stops.
In this case there were a large lorry and a van parked one behind each other forcing cyclists to pull out around them into potential oncoming traffic (including buses as can be clearly seen in the photo).
If these lanes are to form part of the planning scheme then they need to either by physically segregated so as to prevent vehicles parking on them or at the very least there needs to be a zero tolerance approach to enforcement.
If commercial vehicles do need to use them for emergency purposes (I think they may have been investigating the traffic lights which were out of order) then they should be obliged to put in place some kind of stop / go scheme to avoid conflict between cyclists and oncoming vehicles.
Created by Jean Dollimore // 1 thread
TfL officers told us last November that they have a project to improving conditions for cyclists on Camden Road. This would include "investigating the feasibility of a northbound mandatory cycle lane; a wide bus and cycle lane southbound and the removal of two- lane flares at junctions". They assumed a 12m road width, suggesting 6m for a pair of general traffic lanes together with a 2m cycle lane and 4 m bus +cycle lane.
They are now inviting CCC to a meeting to discuss cycling on the TLRN in Camden, and also take the opportunity to walk along Camden Rd to further discuss the corridor scheme they’re progressing. On further enquiry they said:
"We would prefer to take the opportunity to engage with CCC as an independent stakeholder, separate from LB Camden, in order to fully understand the campaign’s ambitions for the TLRN."
So....
1. Let's clarify what we would want on Camden Road (without taking on TfL's assumption that there must be a bus lane. And being realistic as to what might fit in at a junction. The above photo shows a potential left hook situation.
2. Can I have volunteers to join me on this walk/talk.
Jean
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Created by timlennon // 1 thread
Cycle parking at Teddington station can only be accessed by bridge from the Bushy Park side. The absence of a gutter on the bridge makes access very difficult, because the bike needs to be lifted all the way.
Created by Pixlink // 0 threads
The priority issue identified by many community stakeholders and in the Town Plan is to ensure the network of cycle paths in the town are joined up in a useful way. The restriction on two-way cycling in the Thoroughfare is a barrier having a complete network in the town. All the cycle local cycle routes feed into the town's main street, the Thoroughfare yet this "pedestrianised" road has a one-way restriction to traffic and cyclists heading northbound. Pedestrians and people in electric buggies are of course able to travel at will in any direction. Those living in residential areas in the south of the town have to cycle on main roads to the schools and industry and residential areas in the north and vice-versa.
Previous work by Sustrans and the Town Plan has identified the impracticality of only allowing one-way travel for cyclists along the Thoroughfare when this is a National Cycle Route and it conflicts with national health and transport strategy to increase cycling. Though permitting two-way cycling on a one-way street is thought politically sensitive, there is no evidence of increased danger to pedestrians and there are many examples of this practise elsewhere.
Created by Grahame Cooper // 0 threads
The cycle lane passes through the door-opening zone of parked cars in several places. This is especially dangerous on a road with a 40mph speed limit.
Created by Shaun McDonald // 0 threads
The London Road Shell garage is a pain to pass as you have to cross the path of vehicles turning in and out, and can be quite dangerous.
It would be far better to have the petrol station closer to the road, and the cycle path going behind the petrol station. This is the Dutch standard as shown in this example:
https://twitter.com/aseasyasriding/status/444203865353621504
Created by Chris Whitehouse // 0 threads
This refers to the shared cyclepath/footway across St Albans Road West at the junction with Cavendish Way.
There is a flower bed on the east side of this crossing which projects into the line of the crossing. There is also a cyclepath/footway sign on a short post in the flower bed.
At night it is very easy to take a line which sends you into the flowerbed, particularly if crossing quickly to avoid traffic exiting from St Albans Road West. It's not hard in daytime too if there is pedestrian traffic.
Please fill in and resurface a short section of flowerbed and resite the sign.
Created by Chris Whitehouse // 0 threads
This refers to the southernmost end of the short loop of Mill Green Lane to west of the A1000.
Heading north on a bike past this side road requires simultaneously looking
- 180deg back to check for vehicles turning in
- to left to check for vehicles exiting
- ahead to check for bikes heading south
Heading south on a bike past this junction requires
- looking 120deg right for vehicles exiting
- looking ahead at road for vehicles turning in
- looking ahead at cycle path for bikes heading north
- moving as far as possible to the left, ie almost into the main road because visibility of the cycle path is obstructed.
A cheap and effective solution would be to block this junction with a safety rail or similar on the line of the edge of the A1000. Motor traffic can use the north end Mill Green Lane, where there is no conflict with cycle traffic on the cycle path because cycle traffic crosses to the east side of A1000.
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Grahame Cooper // 0 threads
One-way carriageway with two lanes, one of which merges onto St Peter's Way. Narrow cycle lane (<1m) with sunken drains and detritus. If you use the cycle lane, you often get passed very close by cars. If you ride outside of the cycle lane, you sometimes get aggression from following drivers. Taking primary position in the inside lane would feel extremely dangerous as the traffic moves very fast despite the 30mph speed limit.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Kate // 1 thread
There are three schools in this ward (St. Stephens Primary, Orleans Primary, Richmond Upon Thames College) and more just on the edge of the ward boundaries (Chase Bridge, St Mary’s, Ivybridge, Worple Primary, Orleans Secondary) and there is a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast moving traffic. The roads surrounding these schools should all have 20mph zones including larger roads such as St Margarets Road, which is a heavily used link between areas. There should be car-free access around the schools, and protected routes to arrive there. In due course there should be a default 20 mile an hour limit on all residential roads in the borough.
Created by Ross // 1 thread
https://mapsengine.google.com/map/edit?gl=uk&mid=z-ea3VIs1n24.kfBnDgw-g7fg
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. The junction with the South Circular is especially unpleasant for both cycling and walking, and deeply unwelcoming.
How to do this: Raised zebra crossing at Vicarage Road, Palmerston Road and E Sheen Library, 20 mph signs to continue park speed limit to Mortlake station, removal of centre lane white lines, toucan crossing at A205 to allow cyclists to cross, with care, at same time as pedestrians, advanced stop boxes at level crossing and A205 junction, wider pavement on East side between York Way and Wayside - should be wide enough for a pushchair, improved signage and right turn access to North/South Worple Way - these are underused ward quiet routes leading to several primary schools and nurseries.
Sheen Lane is a key route in the ward, cycle volume could increase dramatically with some minor road improvements. Calming and reducing traffic on Sheen Lane would encourage recreational and school commuting cyclists to use this route more frequently. Sheen Lane as a pleasant cycle route would provide quiet cycle link routes to many schools; Tower house, Thomson House, Sheen Mount, Barnes, Ibstock, Mary Magdalens and also link together tens of miles of Thames Path and Richmond Park traffic free routes that could be enjoyed by cyclists from 8 - 80. It would attract more recreational cyclists to get off at Mortlake station and spend money and time on our high street.
Created by Matthew Phillips // 1 thread
Another student housing conversion with inadequate provision for bicycles and possibly excessive provision for cars.
Application states 8 cycle spaces, 8 car spaces and 1 disabled parking space. Total 33 student bedrooms. To go with BREEAM this would suggest 17 cycle spaces would be preferable for residents, plus visitor spaces. The cycle spaces pictured are old-fashioned -- I doubt they would actually provide that kind of rack -- but partially covered. It is unclear whether these would be in a secure area or not. They are round the back of the building.
Camden Council's proposals include the following:
- Raise junction Bartholomew Road Kentish Town Road
- Cycle gap in Kelly Street closure at Castlehaven Road
- Raise junction Anglers Lane/Willies Road/PrinceofWalesRoad
- Two way cycling in Wolsey Mews
- Raise the LeightonRoad/Torriano Avenue junction and introduce cycle gap at the central refuge island
Created by Hester Wells // 4 threads
As part of the Cycle City Ambition Grants there are proprosals to install wide, segregated or hybrid cycle lanes, with priority over sideroads, on Hills Road.
Created by Jack Thurston // 1 thread
Cycling is not permitted in 'Red Square', the red-paved pedestrian area of the centre of Abergavenny.
Even so, cycle route 42 runs through it...
An interesting blog post on cycling in pedestrianised areas:
http://aseasyasridingabike.wordpress.com/2014/03/03/cycling-in-pedestrianised-areas/
One solution is to make the entire area 'shared use'. Another would be to restrict the prohibition on cycling to the busies times of day, eg. Mon-Sat 10am-4pm, and allowing unrestricted cycling at all other times.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by DavidT // 2 threads
The current layout of the pedestrian crossing at the junction of Winchester road and Vermont close forces cyclists out of the cycle lane and into the flow of traffic. This is a risky maneuver and relies on the patience of the car driver behind the cyclist. A possible solution would be to be extend the cycle lane through the chicane, with give way markings so that pedestrians have right of way.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Created by Shaun McDonald // 1 thread
There is a loading bay in the cycle contraflow cycle lane, which means that the cycle lane is blocked for cyclists as soon as a vehicle is parked there. This means that cyclists have to pull out into the path of oncoming buses, thus making the NCN route unsuitable to young children or inexperienced cyclists.
We have a tandem which fits in all the spaces on trains in Scotland (as far as I know), but we are prohibited from taking it on any except the East Coast line trains. I've been writing to various officials - elected and otherwise - and contributed to the recent review of the Scotrail franchise, but am not getting much joy. No one seems to think it is a big deal. But, for my family, with 2 kids aged 5 and 1, and no car, if we don't go by tandem and train, we can't go anywhere much. The tandem is not a luxury but a practical transport solution. Does anyone else want to join in and make this more than a one-woman issue?
(another related issue: even once the kids can ride their own bikes, we won't be able to use trains much since most only allow 2 reservations).
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
Created by Alex Oldman // 1 thread
Disused railway tracks on St Peters Dock provide short section of road surface that is dangerous to traverse from East to West by bike.
If you are avoiding crossing the tracks then you are forced into oncoming traffic.
If you cross the tracks, you are then potentially trapped between parked cars and the railway tracks, which can be dangerous.
The tracks are very slippery when wet or icy, and sections are often hidden underwater because there is poor drainage after heavy rain.
Ideally the tracks are totally removed, or the surface covered with concrete or tarmac.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Created by Andrea Casalotti // 1 thread
Here is an ambitious plan for a Bicycle Boulevard from Shoreditch to Fitzrovia, along Old Street, Clerkenwell Road and Theobalds Road, open only to bicycles, buses and motor traffic for local access only.
a. It is now the most cycled route in London, showing that it is the desired EW route.
b. It is of variable width, therefore trying to accommodate bikes, buses, and through traffic in a consistent and safe way is impossible. In other words, a compromise will be a botch job.
c. There will not be mixing of buses and bicycles: bicycles will have a dedicated two way cycle lane on the South side of the street.
d. The Boulevard stops being a mega- EW-rat-run. Motor traffic will have to use Pentonville/City Road.
More details here: https://docs.google.com/presentation/d/1yw9mkHhGZaVBKYJs6FxyhC1Z4nNYVl-IFH-aR1ScK9U/pub?start=false#slide=id.p
Martin Lucas-Smith // 29 threads
Proposed route along the rail corridor through Cambridge, part of which is in the Cambridge Local Plan.
Surface, drainage and width issues.
Planned for upgrade as part of CEC 'family network'
No details/dates.
Was an issue 5 years ago (and before)
Created by David MacKay FRS // 1 thread
Our campaign for safer walking and cycling to/from NWCambridge now has a petition and a first video (of five) summarising our position.
See our new video summarising our petition:
https://youtu.be/hIlQAzsU0js?t=1s
I’d be delighted if you could promote this to your networks. Time is of the essence because a Senate House discussion is coming up [3 Nov 2015], and I will report the number of signatures on our petition there. (But signatures after the date will still be useful.)
More information:
http://tinyurl.com/EddingtonSafety
The petition:
http://www.ipetitions.com/petition/EddingtonSafety
Anyone is welcome to sign the petition; we ask people to use the Comment field to let us know if they are University Member / University employee / City resident / SouthCambs resident / etc.
For twitter purposes the recommended hashtag is #EddingtonSafety and there is an @EddingtonSafety account too.
Thanks very much
David
David J C MacKay FRS
djcm1@cam.ac.uk
Regius Professor of Engineering,
Cambridge University Engineering Department
Author of “Sustainable Energy - without the hot air” www.withouthotair.com
and “Information Theory, Inference, and Learning Algorithms” www.inference.eng.cam.ac.uk/mackay/
Girton resident and parent.
Cambridge Cycling Campaign Member
Created by londoncycler // 1 thread
Six inch high ridge near left side of north bound lane on the south side of the bridge forces cyclists too close to the kerb or into the path of motor vehicles. Issue reported via CTC pothole reporting site. Resurfacing required.
Created by Rohan Wilson // 1 thread
I've visited Riverside to Waterbeach with William Rayner of county cycling team. He's revising signage here and providing it along the St Ives corridor, with the old NCN 51 being renamed Regional Route 24 (blue patch). We've decided finally to continue to sign NCN 11 from Riverside Bridge to Waterbeach Station, and he's looking at suitable (hopefully temporary) wording to advise to follow NCN 51 to Bottisham for destinations beyond Waterbeach, which will hopefully eliminate misrouting those from outside the area.
Our inspection of existing signs showed that only one new signboard was provided on completion 5 years ago of Riverside Bridge. Signboards still send people via Green Dragon. Sustrans considers signage is an important part of any route project.
The intention is to sign Milton Country Park as a destination, not as part of the route, removing route signs within the park, and probably retaining Coles Road as the signed route through the village, though it would be much preferable to have improvements past the shops and the village green, pubs etc.
Retaining the route to Waterbeach as NCN will help keep the gap in people's awareness.
I am planning to contact again the landowner of the missing link between Bottisham Lock and Fen Road, Lode with a suggestion for a low-level route, southeast side of the Bottisham Lode floodbank which is the route of the public footpath, where signs forbid cycling. It might be considered more visually acceptable. All parish councils are for the route, including the one of which he is a member.
Created by Andy Allan // 1 thread
Garratt Lane at Earlsfield station sucks massively for cyclists, and is a jarring interruption to the Wandle Trail (Sustrans route 20). It would be great to extend the riverside path underneath the railway to avoid this dangerous stretch of road.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by Robin Heydon // 9 threads
The A14 is a very hostile, dangerous road for cycling.
Improvements to it, as well as broader changes to the national framework for cyclist crossings of major roads, are needed.
Created by David Green // 1 thread
My employer is planning to relocate from central cambridge to the Cambridge Business Park (near Waterbeach). There is currently no decent cycle (or footpath!) access to this business park which avoids riding along the A10. I am a confident cyclist but I am not looking forward to riding to work along sections of the A10.
Are there any plans for cycle route construction which the campaign can, perhaps, help accelerate?
Martin Lucas-Smith // 1 thread
The permeability gate between Hooper Street and Kingston Street is obstructive as it only allows passage in one direction at a time.
Given the ever-increasing amount of cycling in areas like this, it's time to get this replaced with a simple bollard arrangement that would allow two-way passage whilst still enable the emergency services to unlock for access in an emergency.
Created by HVS // 2 threads
The A41 ring road cuts across a useful quiet route north-west out of Chester, which is an alternative to the traffic-free Greenway (which is unlit, and slippery in icy conditions). Crossing the A41 during busy periods - e.g. when commuting at rush-hour - can be a slow and potentially very dangerous process, especially after dark. A better crossing for cyclists and pedestrians, or a lower speed limit on the A41 (or both), would be very helpful here.
[Original version of map was wrong; I've now updated it.]
Created by Chris Neston // 2 threads
The cycle path crosses the soutbound exit from the M53 at Cheshire Oaks. The exit is light controlled for traffic as they enter the roundabout. This provides a safe time for cyclists to ride across the sliproad. However the lights are not visible to cyclist on the path and there is no light provided to advise cyclists when they can cross.
This makes it very difficult and dangerous for cyclists to know when they can safely cross. This would require no physical change to the road layout simply a new light to show cyclists when to cross.
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by Rosie Downes // 5 threads
Transport for London's public consultation on Cycle Superhighway 1 is open from 16 February to 29 March. The LCC office has set up this thread to facilitate discussion of the proposals.
Created by WildNorthlands // 1 thread
Brook Hill roundabout is a major barrier for cyclists in West Sheffield. The traffic is fast and as it is a three-lane spiral roundabout with the exit roads (except Bolsover St) having two lanes there is a lot of lane-switching by motorists. This makes the risk of a collision very high, and for less experienced cyclists it is simply a no-go area.
Many of the buildings adjacent to the roundabout belong to the University, and have been built up to the curtilage, so there is no space to expand the pavements and make them shared use.
One alternative for cyclists coming from the Walkley/Crookes area via Bolsover St is to use Tower Court, but this area can be very congested when the University is in session, with several thousand students using the Arts Tower and Library.
The council has signed an alternative route via Weston St and the Netherthorpe Rd tram subway, but this involves a drop in height of about 100 metres and subsequent climb up again, plus the negotiation of access barriers in the subway, so is not really sensible.
Meanwhile on Upper Hanover Way, a cycle crossing was severed when the tramway was installed, although cyclists still use the crossing. A proposed alternative crossing is stalled as it is too expensive.
What can be done about this knotty problem?
As the bridleway crosses Milton Road, it swaps sides of the busway, so most pedestrians and cyclists want to cross diagonally. However the toucan crossing only protects people crossing Milton Road. It doesn't stop busway traffic.
This is confusing and dangerous. When the road traffic stops at red lights, and the Toucan crossing turns green, it feels very safe to cross the busway. Yet buses can come from three directions (busway west, busway east, Milton Road south) at speeds of 30 mph.
Cyclists in particular are tempted to cross diagonally from north west to south east. Last week I saw a near accident.
Created by Eric Booth // 2 threads
Prince St bridge is an anarchic pigs ear. I like pigs and fond of a bit of anarchy but it's getting beyond a joke. Of course it will all be sorted out properly in due course but we could live with this for years. Here's a quick fix:
SOUTH
1. Move south vehicle stop line back 10m behind tramlines
2. Remove all bollards unless one or two kept in line with centre of bridge with arrows right for cars
3. Widen cycle lane from bridge to Festival way turn so suitable for 2-way cycling.
4. Put in Give Way painted line at an angle running from enlarged cycle lane to centre line so southbound cyclists alerted to need to filter across traffic.
NORTH
1. Remove all bollards
2. Widen cycle lane for 2 way cycling all the way up to the traffic lights with The Grove.
3. Remove 5 bollards on each side of north bound traffic light along with the two set back
4. Paint cycle lane passing behind light and then back onto carriageway making it nice and clear that it's an option for cyclists when lights red or they can carry on (as most will, no worse than now but at least it will be clear that they can treat these as 'give way')
5. There will need to be 'give way' paint to make clear that pedestrians have right of way on the by-pass.
Yes it's muddled but less so than now and makes the desire lines easier. It's also a cheap paint based fix pending the proper job.