Prijelaz Držićeva - istok
Potrebno iscrtati prijelaz preko ceste
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by James Gilbert // 1 thread
New barriers will be used to prevent cars driving into the ford when the river is too high. Almost all of the time when the ford is in flood it is still passable by cyclists and pedestrians on the footbridge. On the Duxford side (pictured), cyclists will have to squeeze past on the verge next to a ditch to get round. This will be hard for cyclists with trailers, children in seats etc...
Richard G // 1 thread
Hi everyone
I'm looking on cycling round the east anglian coastline with a group of scouts this summer.
Has anyone done this & could give hints or suggestions to the routes?
Sustrans maps show plenty of quiet road type routes, but I'm thinking they are not well signposted.
the NCR01 route cuts through Norwich rather than round the coast, but I guess may well be better signposted?
Can anyone help me out with thinking about a route please?
Thanks
Richard (Cambridge area)
Created by timlennon // 1 thread
Note from correspondent:
At the moment there is an agreement for non-vehicle access in and out and vehicular egress for the Canons leisure club members via a controlled barrier with responsibility in the hands of The Harlequins Management. This is regularly abused by unauthorised traffic. I want to investigate the feasibility of it being made pedestrian and cycling only, in advance of any building developments which might want to bring it back into full use for vehicle entry and egress, which would have a significant negative impact on the safe use by pedestrians and cyclists.
Created by Robin Heydon // 1 thread
The Guided Busway is a huge success. It carries many adults and youth to and from many destinations, a major destination being the Cambridge Regional College bus stop. Unfortunately, the volume of bicycle and pedestrian traffic along the line of the busway at this point probably wasn’t considered and is now causing problems. It will probably cause even more problems once the new Science Park Station is built at the far end of the busway.
Current Situation
When I started looking at this junction, I tried to ignore what was “built” and instead tried to observe how people moved through the junction. In the first diagram I’ve shown the main desire lines. Desire lines are where people actually move rather than those which engineers designed. For example, when crossing the access road to the college, from the busway, people walked in as straight a line as possible pretty much ignoring the supposed 90º toucan crossing.
Many people on bicycles don’t bother with the toucan but instead just wait for a gap between the traffic light phases and quickly scoot across. Many people ignore what has been designed and have found new, possibly better, ways through the junction - for example, creating a path from King Hedges Road over bare ground. This informal crossing obviously works, but is it safe? Do the bus drivers expect people to cross at this point?
There are many conflict points, some less bothersome than others. The two biggest problems are at the bus stop exit junction with the science park entrance, and between the toucan crossing and the brick surround of the gas supply for the area. When cycling there can be many people trying to cross the road, especially after the bus has stopped, or just before classes are due to start, all getting in your way. Of course, we are getting in their way too, and this isn’t helped by the poor sight lines.
I would therefore summarise that the problems are simply:
1. Severely limited space at the toucan crossing and busway crossing points.
2. Informal pedestrian crossing show junction isn’t working as desired.
3. Very narrow access to science park with poor sight lines.
Proposed Solution
First, we should always respect peoples desire lines. They are voting with their feet, it is obviously safe enough for them to do it day after day, and they have left plenty of evidence that it works by wearing down the grass. So we should make this a proper pedestrian route. This actually has two benefits: it moves a lot of the pedestrian traffic to the west side of the busway stop reducing the number of people at the science park entrance, and it allows a more “directed” path to the north side of that brick building.
Second, we should separate the CRC traffic and guided busway traffic as much as possible at the CRC junction. The busway traffic should follow their natural desire line which is straight on. There are wide turning splays for buses to access the busway from the CRC, yet no buses do this. We should remove them and make a straight on toucan in line with the busway. The CRC traffic would be given their own toucan on the north side of the brick building. Some of the existing railing (cycle parking) here may need to be removed, and the car stop line pushed back a car length or so. The space between the car stop line and the new toucan could usefully become an advanced cycle box.
Third, we should build a proper segregated footway to the north of the cycle track that links to the existing footway going to the “new” toucan. This would be built similar to the Coton path such that pedestrian traffic would be encouraged to seek the higher and safer ground.
Forth, we should straighten the line for access from the science park to the busway. The current facility bends away from the busway crossing, is very narrow, and limits the flow. I’ve seen times when people are queuing cross the busway to travel through this gate. On the south side, the highly restrictive chicane should be removed. People happily cross the busway at multiple points without problems, as here the buses are moving very slowly as they approach the station.
Lastly, we should alter the phasing of the traffic lights. A simple desire for people on bicycle is to wait as little time as possible, but we take very little time to cross a road. Therefore, I would suggest that bicycles are given a green light between every car phase, but only for a few seconds. They should also be given a green light whenever the busway is given a green light. The individual phases may need to be lengthened slightly, say from 25 seconds to 30 seconds to maintain the “capacity”, but the advantages it gives to bicycles would be huge. Also, the pedestrian crossing could be changed to a zebra crossing. This route would then become preferable to the slower toucan crossing further pulling people away. It would also allow for a much more pedestrian focused environment around what should be highly walkable area.
Created by Jack Thurston // 0 threads
The A40 between Abergavenny and Crickhowell is a narrow, fast trunk road and totally unsuitable to cycling. This is a vital connecting route in the area, between two neighbouring towns. There are sections where it is easily wide enough for a proper, separate 2m wide cycle path, or a wider shared use path with pedestrians.
This is a critical issue if the Usk valley is to be made accessible to people riding bikes.
More detail on the issue on the ACG website: http://abergavennycyclegroup.org.uk/cycle-route-to-crickhowell/
Created by Jack Thurston // 0 threads
ISSUE REPORTED AT ACG PUBLIC MEETING - 10 APRIL 2014
Crossing from Belgrave Road to Hatherleigh Road is often difficult due to fast moving traffic and no crossing infrastructure on the Brecon Road.
Created by Jack Thurston // 0 threads
ISSUE REPORTED AT THE ACG PUBLIC MEETING - 10 APRIL 2014
Making right turns when riding east on this section of A40 is difficult due to fast moving motor traffic.
Created by David Earl // 1 thread
Demolition of Edinburgh Building, warehouse and associated buildings and erection of office development of up to 41,750 sq. m. gross external area with development generally being of between 4 and 5 storeys (with limited areas of screened rooftop plant), a single tower element with two further storeys of accommodation, up to 189 car parking spaces (+/- 10%), up to 1325 cycle parking spaces (+/- 20%), up to 26 motorcycle spaces, hard and soft landscaping and ancillary facilities including staff canteens, meeting rooms, refuse enclosures, plant rooms, social break-out spaces etc. all to serve as the new office campus headquarters for Cambridge Assessment.
Created by David Earl // 1 thread
Bella Italia have applied to Cambridgeshire County Council to put outside seating (19 tables/38 chairs) at the Mill Pond outside their restaurant:
http://www.cyclestreets.net/location/57440/
(I'll put the detailed plan on the thread to follow).
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
What would the merits be of putting a crossing further upsteam of Abergavenny, such as where the historic ferry crossing was?
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The obvious cycle route to get to Gilwern Velo Park from Abergavenny is to join the canal towpath at Govilon. On arriving in Gilwern, the cyclist is faces with several issues: Poor surface of the canal path along Gilwern Wharf, steep access down from the canal path. No crossing point on Abergavenny road (without cycling all the way into Gilwern) and then a narrow de-restricted lane with steep sides and no verge leading to the turn into the outdoor centre. We would like to see many improvements made to allow safe access as part of the velo park scheme.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Apparently a route round NH Hospital was proposed once many years. There are many opportunities for the hospital to improve cycle (and foot) access.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
If the authorities are serious about expanding Llanfoist with new housing and de-trunking the A40 though Abergavenny, then they have to face this problem. A foot/cycle bridge, either just upstream of the existing bridge, or down stream into castle meadows would both be a solution, as would a new road bridge that would allow the old bridge to become single lane.
We all know that cost is the big problem here and that some of the options are not going to be possible, but we should campaign for some solution to be found.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Radical, and would please victorian steam enthusiasts... but how about actually re-instating the old high-level bridge? The footings are still there and, if extended, could link directly onto route 46 beside Waitrose, thereby avoiding the need to cross the busy road!
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The small industrial park that includes Aber-Rocks Climbing wall and Kingdom Come Softplay has no cycle path. There are various options for linking it to safe routes.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
One mainly for the pedestrians and anyone pushing a pushchair, but also impacts toddlers and young children riding on the pavement: On the corner of The Cutting and Merthyr Road, any car longer than a small hatchback blocks the narrow strip of pavement assigned to pavement users.
This is a key route for people coming from Abergavenny to access Llanfoist and route 46.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
There are relatively shallow paths that run from both ends of the bridge down to the A4143, but both have shallow steps that stop them being useful to cyclists. This means that people heading out of the hospital wanting to cycle down the A4143 towards Llanfoist have to cross the road with the traffic, rather than the safer alternative of crossing the bridge and coming down the ramp.
Note that openstreetmap's map of this is incorrect. I'll submit a correction (11-04-2014)
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Part of Union Road East is one-way, so cyclists heading from the hospital into town have to cycle 3 sides of an undulating square to reach Tudor Street. A contraflow cycle lane would solve this and encourage cycling.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A very short section of Route 42 is steep and rutted. Not rideable by road bikes. Simply improving the surface would be a start.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by TMiles // 0 threads
A shared-used area runs parallel to Park End Street across Frideswide Square, fronting the Saïd Business School. This offers an alternative approach to the station, and allows cyclists approaching from the city centre to avoid manoeuvres across two roundabouts.
There is however a lack of a properly aligned, clearly marked refuge between the two streams of traffic on Hythe Bridge Street at the point where cyclists would seek to cross into this shared space.
Created by David Butler // 1 thread
Manchester City Council Development strategy for the Ancoats and New Islington Areas. Includes development and urban design principles, and will be a "material consideration" in determinng planning applications.
A recent announcement about the funding of 6000 new residential units by ADUG in this part of Manchester increases the need to ensure that cycling is given due prominence in this strategy.
Created by James Avery // 1 thread
The UHCW NHS Trust has applied for planning permission for a new access roads and multistorey car parks, under a plan drawn up by leading global engineering firm Arup.
Please ask them to go back to the drawing board and come up with something better.
The planning application details are here:
http://planning.coventry.gov.uk/portal/servlets/ApplicationSearchServlet?PKID=744613
Please state that you OBJECT to the current proposals as they don't give any consideration to encouraging more cycling (or walking).
The trust are open to discussion via twitter (@NHSUHCW), but the council need to be asked to bring this matter to the committee (currently it is just classed as deferred, which means officers decide themselves).
Created by Shaun McDonald // 1 thread
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
20 mph speed limit for Newport area, enclosed by the river Taw, The Square, Belle Meadow Road, Inner Relief Road, Hollowtree Road, South Street and Park Lane.
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
Kate Ravilious // 0 threads
Like Fossgate, High Petergate needs to be made two-way for cyclists. Otherwise cyclists travelling north are forced to either get off and walk (not an option for disabled cyclists) or join the busy St Leonard's place via a difficult junction.
Created by Simon Munk // 1 thread
Havering council said:
"We wrote to you on 21st October setting out a series of safety proposals for Romford town
centre comprising of a 20mph zone for all streets within the Romford Ring Road (including
some traffic calming measures) and some changes to road markings on various
roundabouts on the Ring Road itself.
We sent out over 2,500 letters to people in the area, but only received 8 responses with 4
of these being from residents. This was reported to the Council’s Highways Advisory
Committee on 6th December where the decision on the scheme was deferred in order for
further discussions to take place with ward councillors.
As a result of these discussions, it has been decided to provide a further period of
consultation and any other comments received shall be reported to the Highways Advisory
Committee on 7th February 2017.
We would therefore like to extend the opportunity for you to provide any comments you
may have to the postal address above, via our email address highways@havering.gov.uk
or through an online form which we have provided at www.havering.gov.uk/consultations."
Created by Alex Jenkins // 1 thread
Tower Hamlets Council is committed to making the borough a safer place for all road users by delivering a range of street improvements in the area; intending to benefit pedestrians, cyclists, drivers and public transport users alike.
Influencing positive changes in road user behaviour is key in providing a safe road environment for the community and although changes in road layout can’t fully resolve this, redesign of our streets can help. Therefore, Chrisp Street and the surrounding areas are currently being invested in with aims to improve road safety for the local community.
Please give us your feedback by filling in the survey (below the map). You may also like to add a comment to our interactive map of the wider area.
Martin Lucas-Smith // 1 thread
This junction is currently very poor. Cyclists end up doing awkward manoeuvres and visibility is not good.
It is possible this could be improved as part of the Chisholm Trail.
How could this junction be redesigned to make it best practice?
Created by Simon Still // 2 threads
Our proposals at a glance
Transport for London (TfL), together with Lambeth Council would like to know your views on proposals for improvements which will include:
To complement this scheme we have been working with Lambeth Council to develop a Low Traffic Neighbourhood in the nearby residential areas to the east of the A23. This will complement the A23 scheme by protecting local streets from through traffic and will help deliver wider objectives such as creating Healthy Routes on local roads. Visit the consultation page of Lambeth’s website from the 22 February 2020 to find out more.
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac