Transport Corridor Funding
On a bi-annual basis, the funding for S106 projects is to be reviewed with Area Committee recommendations going to Cabinet for final approval.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
On a bi-annual basis, the funding for S106 projects is to be reviewed with Area Committee recommendations going to Cabinet for final approval.
This is a change of use application to turn Mickey Flynns from a snooker hall to shops, financial services and a café.
Created by Richard Moss // 1 thread
Planning application for 5 retail units - cycle parking required.
Created by cobweb // 1 thread
Change of use for the former Joshua Taylor building to provide 12 residential units over three floors.
Created by Andy Allan // 0 threads
There's no bike parking outside of the parade of shops at the top end of Leigham Vale. The only options are the railings on the railway side of the road, or the handrail outside the post office.
There's plenty of space outside the front of the shops, and it would be good to have some near the garden centre.
Created by Jim Chisholm // 1 thread
The possibility of a new cycle/walking route from Whittlesford station in part using funds from proposed adjacent development (Relocation of Welches transport depot from Stapleford/Shelford
The platform which is c 264m long extends beneath A505 overbridge.
Longest trains are 240m (12 coaches). This route was investigated some 10 years ago.
Greater Anglia say a route is not possible. I regard this as a stuck rather than locked door.
It may be possible with the use of a fence to take over all of last few metres or to have half (if half cyclist dismount signs may be needed)
As a very last resort to may be REQUIRED for those with bikes to walk.
I can see no reason why a walking route cannot be permitted.
Any 'risk' crossing A505 at grade must be orders of magnitude greater than using end of platform!
"Anyone who uses the racks in St John's Street, Trinity Street, and King's Parade, may have seen notices about filming this week. They're suspending cycle parking for Wednesday and Thursday 'due to the nature of the filming'. The mind boggles" (Bev)
The suspension notice (elevation, lifting?) says "We have been working with Cambridge council to achieve this. " This phrase probably means that the production company has negotiated a location fee with the city council for filming on Cambridge streets, and to film "bike free". If it is correct that the CCC represents Cambridge Cyclists, and in so far as our constituency bears the impact of this "suspension", we would be well placed to receive some compensation for the inconvenience forced upon local cyclists. 1000 £ or 2000 £ could buy us a lot of bike badges (pins), including blue ones of course
http://www.cambridge.gov.uk/ccm/content/business/licensing-and-permissions/filming.en
citycentremanagement@cambridge.gov.uk
Created by Gregory Williams // 1 thread
Inconsiderate parking of cars on the shared-use RCR15 Viking Coastal Trail cycle path at North Foreland. This has completely blocked the path to cyclists and pedestrians. The photo clearly shows a pedestrian trying to get past the parked vehicles.
Created by cobweb // 1 thread
Two 5 bed houses, five 4 bed houses, internal access road plus car and cycle parking.
Martin Lucas-Smith // 0 threads
Poor-quality cycle parking at Geography.
Created by Andrew Clegg // 0 threads
Parking does exist (at the back of the car park), but it's not obvious. The vast majority of people just leave their bikes propped against the wall near the door.
The bike parking which exists is rather bizarre heavy plant pots with a bike symbol and loops to lock your bike to. The positioning of the loops is awkward and having a plant in the way doesn't help.
As this shop is on NCN 8, it would be really good to see them welcoming cyclists with a prominent sheltered bike parking area with proper stands near the door of the shop.
Created by cobweb // 1 thread
A new shop front for a Co-op store with an ATM to the side elevation.
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by cobweb // 1 thread
Madgelene College (at Cripps Court) wish to remove a cycle shed in order to build a timber furniture store. The design and access statement, justifying this, says that few of the racks are used.
Created by cobweb // 1 thread
External works including pedestrian access ramp, alterations to bin storage, covered cycle parking, staff and visitor car parking etc.
Created by cobweb // 1 thread
8 cycle racks shown in the ground floor plan. A retail unit is likely to have some effect on traffic.
Created by cobweb // 0 threads
An application to demolish 191 and 193 Mill Road (opposite St Phillip's Church and replace with 6 studio units and a retail unit. It's a conservation area.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by cobweb // 0 threads
The proposal is to install two bollards on the corner of Hemingford Road in order to prevent cars from mounting the pavement. The pavement here (as with much of Mill Road) is not that wide. A build out was considered but it was felt that this would create pinch point of cyclists.
(Scheme 16, page 29)
Created by cobweb // 0 threads
Two speed cushions are proposed in order to reduce speed and make it safer for pedestrians to cross.
The proposal is to put in double yellow lines and no waiting restrictions at this entrance to the Tins.
Created by cobweb // 2 threads
EIP's from the East Area Committee. Two schemes proposed here, one at the Riverside end of the Tesco path, the other near Stanley Road. For the first, double yellow lines are suggested, for the second, double yellow lines and residents only parking.
Scheme 3, page 5.
Created by cobweb // 0 threads
Not sure if this is something or nothing but in the East Area Committee agenda (EIP Appendix B) there's discussion of Coleridge Community College (Parkside Federation is probably the right name now) installing bollards on the verge.
(Scheme 6, page 11)
Created by Gerhard Weiss // 1 thread
How St is Walthamstow's artery. It carries way too much motor traffic for its size. Many bus routes run through it. Recent improvement plans are looking ok, but are as usual a mixed bag.
This is a general, over-arching issue for discussion of helmet-related and cycle safety promotion strategic matters in Cambridge that periodically (and continually) arise.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.