More cycle parking needed near Clocktower Square area of Canterbury
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Shaun McDonald // 1 thread
Overview
Barclays Cycle Superhighways are cycle routes running between outer and central London. They provide new cycle lanes and other dedicated infrastructure so that cyclists can enjoy swift, direct, safer journeys around the city. We have developed plans for a new route and would like to hear your views.
What are we consulting on?
We’re proposing to introduce a new cycle route between New Cross Gate and Victoria. Barclays Cycle Superhighway Route 5 (CS5) would run via Peckham, Camberwell, Kennington and Vauxhall.
Proposed road layout changes
The new route would bring substantial changes to the road layout to improve safety for cyclists, including:
More space for cyclists and buses, through reallocation of road space
New mandatory cycle lanes, all at least 1.5 metres wide
Improvements for cyclists at 52 junctions, including new Advanced Stop Lines, cycle feeder lanes, and speed reduction measures
An innovative cycle ‘early-start’ facility at Vauxhall Bridge Road/Millbank to help cyclists get ahead of traffic
Banning some turns for cars and lorries to reduce conflict with cyclists
Extended 20mph speed limit in New Cross
Other benefits
Over 3,000 new cycle parking spaces along the route
Cycle safety checks
Free cycle training
Industry-recognised safety training for drivers of large goods vehicles
Proposed route
Click here to download a larger map of Barclays Cycle Superhighway Route 5.
How do I view the proposals and have my say?
Detailed proposals
Find out more about the proposals for each section of the new route by clicking the links below.
► Section 1 – Vauxhall Bridge Road north (Neathouse Place to Charlwood Street)
► Section 2 –Vauxhall Bridge Road south (Charlwood Street to Millbank)
► Section 3 – Vauxhall Bridge Road / Millbank junction
► Section 4 – Vauxhall Bridge
► Section 5 – Vauxhall Gyratory
► Section 6 – Kennington Oval / Harleyford Street
► Section 7 – Oval Junction
► Section 8 – Camberwell New Road
► Section 9 – Camberwell Green (consultation in January 2013)
► Section 10 – Peckham Road west (Benhill Road to Southampton Way)
► Section 11 – Peckham Road east (Lyndhurst Way to Peckham Bus Station)
► Section 12 – Peckham High Street / Queen's Road west (Peckham Bus Station to Carlton Grove )
► Section 13 – Queen's Road (Carlton Grove to Pomeroy Street)
► Section 14 – Queen's Road east (Pomeroy Street to Pepys Road)
► Section 15 - New Cross (and other local cycling improvements in Lewisham)
To request a paper copy of our proposals, please email barclayscyclesuperhighways@tfl.gov.uk
Public Exhibitions
You can also view the plans at our public exhibitions. Dates and locations are given below.
Saturday 8 December 11:00-15:00, Peckham Library, SE15 5JR (view map)
Tuesday 11 December 15:00-19:00, Oval House Theatre café, SE11 5SW (view map)
Wednesday 12 December 15:00-19:00, Parnell House, SW1V 1LW (view map)
Created by Rohan Wilson // 1 thread
Cambridge Science Park though in the northern edge of the city, is administratively in South Cambs.
I propose to attach a thread relating to a new planning application for the Bard Pharma site, northeast corner.
Created by Fonant // 0 threads
The current Promenade has "NO CYCLING" a few dozen yards before its western end, so cyclists have nowhere to go. The parallel road, especially Eirene Road, is dangerous and unpleasant for cycling, so many continue to ride along the footpath to Sea Lane.
There is plenty of room to widen the path, using concrete on top of the stable shingle. The same method could be used as was used to the east of Worthing some years ago.
This project has the full backing of local cyclists as their number-one priority in Worthing, and has local resident support too. It was included in WSCC's last LSTF bid document, which won them £2.36 million of funding from central government.
Can we just build it, please?
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by ambrosen // 1 thread
Sustrans route 4 coming from the canal path on its main route into Bath city centre has a high level of traffic conflict and the need to filter between two tight lanes of traffic with a large proportion of LGVs coming down the A36 Beckford Road.
The right turn from Sydney Place southbound into Great Pulteney Street is signposted as no right turn as well as being route 4, and has no refuge to turn from.
It should be possible to route the path through Sydney Gardens as the Darlington Place/Sydney Place westbound/Great Pulteney Street junction has been improved to increase pedestrian flows.
Some non-cycling residents are also concerned about cyclists using the pavement in this area too.
Created by Shaun McDonald // 1 thread
Further safety improvements at Bow roundabout
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions.
Why We Are Consulting
As part of this work, we have developed proposals to further improve safety at Bow roundabout.
What we’re proposing and why
Bow roundabout is a key junction for cyclists travelling between central and east London.
Cycle Early Start
A cycle early-start would operate at the traffic signals on the westbound approach to Bow roundabout.
This would provide a dedicated green light to allow cyclists to wait ahead of other traffic before moving onto the roundabout.
A new mandatory cycle lane on the westbound approach would allow cyclists to get to the roundabout entrance without having to filter through traffic.
The early-start area would be 18 metres deep, so there's a clear space for cyclists in front of any traffic.
This cycle early-start would improve safety, due to the reduced risk of conflict between cyclists travelling straight ahead and vehicles turning left. It would also provide a quick and direct route through the roundabout for cyclists.
The eastbound early-start was completed in June 2012. Our provisional monitoring to date shows that the eastbound early-start has been effective in reducing the left turning conflict risk that it was designed to address. It also shows that the cycle lane on the approach is well-used, with significantly fewer cyclists using the footway than before. We will continue to monitor and analyse the operation of these facilities.
Cycle Bus Stop By-Pass
TfL is proposing to introduce a new cycle lane around the back of the bus stop on the approach to the roundabout to help cyclists get ahead of other traffic and reduce the risk of conflict between cyclists and buses pulling in and out of the bus stop.
To accommodate the new cycle lane, the bus lay by would be filled in so buses would stop on the carriageway instead. .
Please click here to see the map for further information on the proposals.
We continue to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Bow area.
We intend to begin work at the roundabout in January 2013. We’ll write to residents and businesses nearer the time to advise on the timing and impact of construction work.
https://consultations.tfl.gov.uk/betterjunctions/bow_roundabout/consult_view
Created by velocipedus@gmail.com // 12 threads
Resources, opportunities, ideas and opinions about bicycle culture in Cambridge
Created by Rohan Wilson // 2 threads
Next meeting is Thursday 6 Dec at Trumpington Village Hall
(Informal Drop-In 15:30 - 18:30, followed by Forum 19:00 - 20:30)
Though the above page indicates it's about residential developments, Addenbrooke's was covered in a presentation on previous 6 Sep meeting. Bell School was not covered.
The main discussion was around schools and young people.
Created by cobweb // 32 threads
e.g.
https://www.gov.uk/government/news/cash-boost-to-get-england-cycling--2
Govt announces £20 million for cycling infrastructure improvements.
Marshall reveals plan for 1,500 homes
http://www.cambridge-news.co.uk/News/New-plan-for-1500-homes-27112012.htm
Created by George Coulouris // 1 thread
Camden are contemplating a re-design of this junction (the one adjacent to Mornington Cresent Station). We hope to get in early and try to ensure that the junction and its surrounding streets are made as safe and pleasant for cycling as possible.
This CycleScape issue is intended as a forum for discussion of improvements or a total redesign.
Martin Lucas-Smith // 2 threads
There are rumours that the AJC will be scrapped.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jim Chisholm // 5 threads
There is a suggestion of a group looking at issues for those cycling in the A10 corridor between M11 J11 and Royston. This is, in part about cycling along the corridor, but mainly about access between villages and access to rail stations. Of course the A10 north of Cambridge has LSTF money, but there are currently few funds available for improvements in this area.
Created by David Earl // 1 thread
Road closures - but will cycle parking be OK?
Created by velocipedus@gmail.com // 1 thread
Forwarded message:
I noticed that half of the bicycle shelter was fenced off, and I wondered whether we may be getting some new racks. In Connect I read the Trust was considering two tier bike racks so I was half expecting we would get these. Today however I learnt that the area will be transformed into a smoking shelter! Is this true?
I think it is fair to state 30% of the people working in the S-block cycle into work. Losing half of our cycle parking facilities is not very helpful. The area is heavily used and often overflowing with bikes.
If the area will indeed be turned into a smoking shelter, can you please explain why this decision was made and why it was not communicated to the staff concerned?
This is outrageous and a good press story. Robin - are you up for this?
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling, road user and safety organisations - to review and improve cycling provision at junctions. As part of this work, we have developed proposals for further safety improvements at the junction of Battersea Park Road and Havelock Terrace. This follows the introduction of a new signalised pedestrian crossing and cyclist Advanced Stop Line at the junction in June 2012.
Why We Are Consulting
About the proposed changes:
Our review of the current junction layout showed that the two narrow general traffic lanes on Battersea Park Road southbound mean that cyclists are sometimes squeezed towards the kerb by motorists. It also identified conflict between cyclists and motorists merging across lanes when approaching the junction southbound from Battersea Park Road.
Our proposed improvements have been designed to address the above issues. They include:
A new central cycle lane to help cyclists turning right from Battersea Park Road into Prince of Wales Drive. This would mean two lanes of traffic on the southbound approach from Battersea Park Road instead of three. These proposals may mean a slight increase in journey times at busy periods.
One wider southbound general traffic lane on the Battersea Park Road exit instead of two narrow ones. This would reduce the likelihood of cyclists being squeezed against the kerb by motorists
A new traffic island at the junction of Prince of Wales Drive to segregate westbound cyclists and motorists
New sections of eastbound and westbound mandatory cycle lane on Prince of Wales Drive to provide more space for cyclists. The eastbound cycle lane would replace one of the general traffic lanes on the approach to the junction
Widening the existing mandatory cycle lane on Battersea Park Road (northbound) to provide more space for cyclists
Removing the existing yellow box marking from the junction, as the proposed new lane layout would mean it was no longer needed.
Please click here to see the attached map for further information on our proposals. We plan to start work in late December 2012.
How to comment on the proposals:
Please let us know your views completing the online consultation form below by 30 November 2012.
About the Better Junctions programme:
TfL is making it easier and safer for people to cycle in London. As part of this work, we’re meeting with a number of different organisations to review and improve junctions on the Barclays Cycle Superhighways and the Transport for London Road Network (TLRN). We’re planning a variety of improvements, ranging from initial upgrades at some locations, to more substantial and innovative redevelopment at others. Please see www.tfl.gov.uk/betterjunctions for more information.
https://consultations.tfl.gov.uk/betterjunctions/battersea-park
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Eric Booth // 1 thread
There's an online survey around three options for this problem junction. Open to 30th November. http://www.the-bear-pit.org.uk/19.html
Identified in Times Survey of problem junctions for cycling http://www.thetimes.co.uk/tto/public/cyclesafety/article3392986.ece
"Temporary" barrier/road closure created because of Leith Walk tram 'works'.
No-one seems willing to take responsibility for restoring/creating/protecting decent permeable route.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Gregory Williams // 1 thread
The cycle parking at Canterbury's Asda is conveniently located for the shop entrance, but doesn't properly secure or support bicycles. Hence parts of bicycles go missing and cyclists choose to secure to other street furniture.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.