Beeston Centre E-W alternative route - Northern corridor
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
Created by timlennon // 0 threads
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. Measures such as 20mph and traffic calming are needed here, along with re-alignment of parking..
Created by timlennon // 0 threads
Barnes should be a pleasant place to visit. make the whole area 20mph, and provide safe routes for cycling through the town centre away from traffic conflict. Remodel road and pavement layout to provide a family-friendly space.
Created by Simon Nuttall // 3 threads
In 2012 a long list of candidate one way streets for conversion to two-way cycling was drafted. http://www.cyclestreets.net/photomap/tags/twoway2012/
Two years later the County are now proposing a short list of 11 streets for conversion.
Created by Jon_B // 1 thread
The contra-flow cycle lane leading West on Dogs Head St was (once again) obstructed by illegally parked vehicles this morning.
I have reported the specific incident, but this seems to be to be a more general problem of lack of enforcement and commercial vehicles believing that it is acceptable for them to use these lanes for short (or not so short) stops.
In this case there were a large lorry and a van parked one behind each other forcing cyclists to pull out around them into potential oncoming traffic (including buses as can be clearly seen in the photo).
If these lanes are to form part of the planning scheme then they need to either by physically segregated so as to prevent vehicles parking on them or at the very least there needs to be a zero tolerance approach to enforcement.
If commercial vehicles do need to use them for emergency purposes (I think they may have been investigating the traffic lights which were out of order) then they should be obliged to put in place some kind of stop / go scheme to avoid conflict between cyclists and oncoming vehicles.
Created by Jean Dollimore // 1 thread
TfL officers told us last November that they have a project to improving conditions for cyclists on Camden Road. This would include "investigating the feasibility of a northbound mandatory cycle lane; a wide bus and cycle lane southbound and the removal of two- lane flares at junctions". They assumed a 12m road width, suggesting 6m for a pair of general traffic lanes together with a 2m cycle lane and 4 m bus +cycle lane.
They are now inviting CCC to a meeting to discuss cycling on the TLRN in Camden, and also take the opportunity to walk along Camden Rd to further discuss the corridor scheme they’re progressing. On further enquiry they said:
"We would prefer to take the opportunity to engage with CCC as an independent stakeholder, separate from LB Camden, in order to fully understand the campaign’s ambitions for the TLRN."
So....
1. Let's clarify what we would want on Camden Road (without taking on TfL's assumption that there must be a bus lane. And being realistic as to what might fit in at a junction. The above photo shows a potential left hook situation.
2. Can I have volunteers to join me on this walk/talk.
Jean
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Created by timlennon // 1 thread
Cycle parking at Teddington station can only be accessed by bridge from the Bushy Park side. The absence of a gutter on the bridge makes access very difficult, because the bike needs to be lifted all the way.
Created by Pixlink // 0 threads
The priority issue identified by many community stakeholders and in the Town Plan is to ensure the network of cycle paths in the town are joined up in a useful way. The restriction on two-way cycling in the Thoroughfare is a barrier having a complete network in the town. All the cycle local cycle routes feed into the town's main street, the Thoroughfare yet this "pedestrianised" road has a one-way restriction to traffic and cyclists heading northbound. Pedestrians and people in electric buggies are of course able to travel at will in any direction. Those living in residential areas in the south of the town have to cycle on main roads to the schools and industry and residential areas in the north and vice-versa.
Previous work by Sustrans and the Town Plan has identified the impracticality of only allowing one-way travel for cyclists along the Thoroughfare when this is a National Cycle Route and it conflicts with national health and transport strategy to increase cycling. Though permitting two-way cycling on a one-way street is thought politically sensitive, there is no evidence of increased danger to pedestrians and there are many examples of this practise elsewhere.
Created by Grahame Cooper // 0 threads
The cycle lane passes through the door-opening zone of parked cars in several places. This is especially dangerous on a road with a 40mph speed limit.
Created by Shaun McDonald // 0 threads
The London Road Shell garage is a pain to pass as you have to cross the path of vehicles turning in and out, and can be quite dangerous.
It would be far better to have the petrol station closer to the road, and the cycle path going behind the petrol station. This is the Dutch standard as shown in this example:
https://twitter.com/aseasyasriding/status/444203865353621504
Created by Chris Whitehouse // 0 threads
This refers to the shared cyclepath/footway across St Albans Road West at the junction with Cavendish Way.
There is a flower bed on the east side of this crossing which projects into the line of the crossing. There is also a cyclepath/footway sign on a short post in the flower bed.
At night it is very easy to take a line which sends you into the flowerbed, particularly if crossing quickly to avoid traffic exiting from St Albans Road West. It's not hard in daytime too if there is pedestrian traffic.
Please fill in and resurface a short section of flowerbed and resite the sign.
Created by Chris Whitehouse // 0 threads
This refers to the southernmost end of the short loop of Mill Green Lane to west of the A1000.
Heading north on a bike past this side road requires simultaneously looking
- 180deg back to check for vehicles turning in
- to left to check for vehicles exiting
- ahead to check for bikes heading south
Heading south on a bike past this junction requires
- looking 120deg right for vehicles exiting
- looking ahead at road for vehicles turning in
- looking ahead at cycle path for bikes heading north
- moving as far as possible to the left, ie almost into the main road because visibility of the cycle path is obstructed.
A cheap and effective solution would be to block this junction with a safety rail or similar on the line of the edge of the A1000. Motor traffic can use the north end Mill Green Lane, where there is no conflict with cycle traffic on the cycle path because cycle traffic crosses to the east side of A1000.
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Grahame Cooper // 0 threads
One-way carriageway with two lanes, one of which merges onto St Peter's Way. Narrow cycle lane (<1m) with sunken drains and detritus. If you use the cycle lane, you often get passed very close by cars. If you ride outside of the cycle lane, you sometimes get aggression from following drivers. Taking primary position in the inside lane would feel extremely dangerous as the traffic moves very fast despite the 30mph speed limit.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Kate // 1 thread
There are three schools in this ward (St. Stephens Primary, Orleans Primary, Richmond Upon Thames College) and more just on the edge of the ward boundaries (Chase Bridge, St Mary’s, Ivybridge, Worple Primary, Orleans Secondary) and there is a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast moving traffic. The roads surrounding these schools should all have 20mph zones including larger roads such as St Margarets Road, which is a heavily used link between areas. There should be car-free access around the schools, and protected routes to arrive there. In due course there should be a default 20 mile an hour limit on all residential roads in the borough.
Created by Ross // 1 thread
https://mapsengine.google.com/map/edit?gl=uk&mid=z-ea3VIs1n24.kfBnDgw-g7fg
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. The junction with the South Circular is especially unpleasant for both cycling and walking, and deeply unwelcoming.
How to do this: Raised zebra crossing at Vicarage Road, Palmerston Road and E Sheen Library, 20 mph signs to continue park speed limit to Mortlake station, removal of centre lane white lines, toucan crossing at A205 to allow cyclists to cross, with care, at same time as pedestrians, advanced stop boxes at level crossing and A205 junction, wider pavement on East side between York Way and Wayside - should be wide enough for a pushchair, improved signage and right turn access to North/South Worple Way - these are underused ward quiet routes leading to several primary schools and nurseries.
Sheen Lane is a key route in the ward, cycle volume could increase dramatically with some minor road improvements. Calming and reducing traffic on Sheen Lane would encourage recreational and school commuting cyclists to use this route more frequently. Sheen Lane as a pleasant cycle route would provide quiet cycle link routes to many schools; Tower house, Thomson House, Sheen Mount, Barnes, Ibstock, Mary Magdalens and also link together tens of miles of Thames Path and Richmond Park traffic free routes that could be enjoyed by cyclists from 8 - 80. It would attract more recreational cyclists to get off at Mortlake station and spend money and time on our high street.
Created by Matthew Phillips // 1 thread
Another student housing conversion with inadequate provision for bicycles and possibly excessive provision for cars.
Application states 8 cycle spaces, 8 car spaces and 1 disabled parking space. Total 33 student bedrooms. To go with BREEAM this would suggest 17 cycle spaces would be preferable for residents, plus visitor spaces. The cycle spaces pictured are old-fashioned -- I doubt they would actually provide that kind of rack -- but partially covered. It is unclear whether these would be in a secure area or not. They are round the back of the building.
Camden Council's proposals include the following:
- Raise junction Bartholomew Road Kentish Town Road
- Cycle gap in Kelly Street closure at Castlehaven Road
- Raise junction Anglers Lane/Willies Road/PrinceofWalesRoad
- Two way cycling in Wolsey Mews
- Raise the LeightonRoad/Torriano Avenue junction and introduce cycle gap at the central refuge island
Created by Hester Wells // 4 threads
As part of the Cycle City Ambition Grants there are proprosals to install wide, segregated or hybrid cycle lanes, with priority over sideroads, on Hills Road.
Created by Jack Thurston // 1 thread
Cycling is not permitted in 'Red Square', the red-paved pedestrian area of the centre of Abergavenny.
Even so, cycle route 42 runs through it...
An interesting blog post on cycling in pedestrianised areas:
http://aseasyasridingabike.wordpress.com/2014/03/03/cycling-in-pedestrianised-areas/
One solution is to make the entire area 'shared use'. Another would be to restrict the prohibition on cycling to the busies times of day, eg. Mon-Sat 10am-4pm, and allowing unrestricted cycling at all other times.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.