S/2060/13/FL Closure of level crossing, replacement with footbridge
Network Rail planning application for replacement of level crossing with footbridge
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Richard Moss // 1 thread
Network Rail planning application for replacement of level crossing with footbridge
Created by Paul L // 1 thread
Between the practically traffic free road through Bushy Park and the quiet roads of Hampton is the busy High Street. This could be a route for all cyclists by segregation as a two-way widened shared footway and conversion of an existing pelican to a toucan crossing.
Created by Paul L // 0 threads
Burtons road has been part of the borough cycle network usually acting as a quiet parallel to Queens Rd. Unfortunately growth of traffic has led to it being a rat-run at peak times despite numerous road humps. As parking leaves space for only one vehicle this makes it unpleasant to cycle.
Created by Gareth Evans // 0 threads
This roadworks is very extensive. There are many cones. However this lorry just blocks not only the lane but the sight lines just next to St Kilda avenue
Created by David Earl // 2 threads
The new flats at the fire station seem to be attracting delivery vehicles to unload in the cycle lane at the west end of East Road. The wide lane here is separated from the road by cross hatching. Should we ask for physical segregation on this short length, e.g armadillos. Would delivery vehicles still bump over them to park are make matters worse to get round them? Would a barrier be effective?
Created by vlejd // 2 threads
The marked lengths of the path has several breaking points (legally dismounting is obligatory), but for no good reason. Needs some paving and marking. Preferably convert to 2-way, there's plenty of space.
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by Jenine // 1 thread
We need some cycle racks outside the Asda store here. I've asked Asda but they say it's up to the Council.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
The road between Hogg End Lane and Three Cherry Trees Lane is closed to all traffic. It should be opened to cyclists to provide a convenient route to the Maylands industrial estate and NE Hemel from the Redbourn Road.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by BrianInBeeston // 1 thread
There have been tacks thrown on the path in this area which cause punctures. Residents have put up signs saying 'no cycling'. This is a defacto bridleway & has been used as such as long as anyone can remember. A local resident has made a witness statement to this effect which is being dealt with by Nottinghamshire County Council rights of way officers.
Created by Claydon & Whitton Parish Council // 0 threads
Cyclists using footpath between Newell Rise & Church Lane Claydon, past bus stop. Potentially dangerous for pedestrians particularly waiting for buses.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
Route along St Albans Road providing a direct link between St Albans and Sandridge. This would connect to the footpath/bridleway conversion from Sandridge to No-Man's land and to a potential route from No-man's land to Wheathampstead providing a route from St Albans to Wheathampstead.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Andrew Clegg // 1 thread
The excellent cyclepath alongside St Mary's stadium joins onto Melbourne Street via an awkward and narrow gap which is often blocked by cars. This is annoying for regular users as well as making it harder for people to follow the NCN23.
Created by Andrew Woodward // 0 threads
There is room for more bike parking here - to encourage people to stop fly parking on the railings of the bridge.
Created by Andrew Woodward // 0 threads
Cycling north down church rd; and wanting to go east on the A316, cyclists can avoid Richmond Circus by makin a right turn onto St. Johns Rd. However, this right turn is on a bend and there are frequently queues of north bound traffic that obscure the view of oncoming vehicles until you reach the bend - see streetview here http://goo.gl/maps/dvlKe ; coupled with a downhill gradient cyclists are tempted to cut across Church Rd at this point at speed despite poor visibility.
Reversing the direction of the Larkfield Rd / St Johns Rd one way system would allow northbound cyclists to make a right turn into Larkfield rd to cycle round and pick up the A316 - with much better view of oncoming traffic. Coming the other way, westbound cyclists heading for Richmond Station could then use St Johns Road to get to Richmond Station - which is slightly shorter and easier route.
Created by Andrew Woodward // 0 threads
Sandpits Rd Ham is closed to through traffic, creating an opportunity for a quiet cycling route. However the closure has been made with a bench and a kerb that would obstruct anyone wanting to cycle between Sandpits Rd and the rest of Ham. This could easily be replaced by bollards.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Created by Andrew Woodward // 1 thread
This short stretch of cycletrack links Leybourne Park to Cumberland Rd - its very narrow and has street furniture in the path, making pretty much unusable.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”