Crossing Cove Road
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Sarah Wood // 0 threads
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
The Greater Anglia franchise is due for renewal in October 2016 and the process has already started. It is quite unsusal to have a station serving such a large number of passengers with access on only one side o the tracks. This situation leads to many more and longer car journeys along Mill Road, Cherry Hinton Road and Hills Road.
There is an existing access via (non-residential) Clifton Road to the east side of the station and there is vacant land. We need to argue the case for an eastern entrance to the station, along with cycle parking and pedestrian access. There is a mainly empty car park on the other side of the tracks. We should also try to include a link from the Carter bridge to the new cycle park.
Interested parties
3 shortlisted franchises
local MPs
Minister responsible (Clare Perry MP)
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by Jon G // 1 thread
The Embankment, Twickenham is a two-way street. Many driver sseem to think it is one-way Westbound. Even the Cyclescape map wrongly marks it as one-way! It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding Eastward along it.
Created by Jon G // 1 thread
Bell Lane is two-way. Most drivers using it go Northward and many seem to think it is one-way that way. It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding South along it.
Created by Jon G // 1 thread
Cricket Lane is a dead end and therefore two-way. Since an exit from a car park was built leading into it, many drivers seem to think it is a one-way street from the car park. In fact it is used by cyclists going in both directions between High St and Bushy Park.
It needs signs clarifying that it is two-way, as drivers are being obstructive or abusive to cyclists legitimately using it.
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
Created by Richard Taylor // 1 thread
Proposal for three new pedestrian and cycle access points to Cambridge Business Park. The proposals are being made in light of the plans for an new station nearby.
Representations from companies with premises on the business park - Redgate and Autonomy - have expressed concerns about security and the potential for people to try and park on the business park and then get on a train.
The proposals are for the new accesses to be gated to restrict general public access.
The proposals include a connection to the potential cycleway along the line of the disused railway.
Cambridge Business Park Cowley Road Cambridge Cambridgeshire CB4 0WZ
Cambridge
Application reference: 15/0919/FUL
Created by Violinist John // 1 thread
Noticed this a couple of weeks ago. As you will see the sign is incomplete and misleading given that the place to see all the details is the end of Ferry Lane waiting to join High Street. High Street at this point is both Route 51 and Route 11.
Major points:
Left turn to go to Impington on Route 51 - I think not.
Abbey and Fen Ditton to the left when you could just go back across Green Dragon bridge.
No directions to Histon, Milton, Waterbeach probably others.
Also the lack of any idea where route 11 goes to the right.
This appears to be one of a number of new signs that have recently appeared. If anyone has seen any more let's get the info out there and try to get them fixed.
Created by Iain Lane // 1 thread
Some new lamp posts have been installed on the pedestrian side of this split ped/cycle path. This reduces the effective width of the path and creates conflict.
Created by Katja Leyendecker // 0 threads
Council is planning changes on parts of Heaton Road
http://www.newcastle.gov.uk/parking-roads-and-transport/cycling/strategic-cycle-routes/improvements-heaton-road
Discuss your thoughts and ideas here!
Created by Roxanne (CEO) // 3 threads
Relocation of the existing liquid nitrogen (LN2) tank, Denios unit and cycle parking facilities.
Department Of Chemistry Lensfield Road Cambridge Cambridgeshire CB2 1EW
Cambridge
Application reference: 15/0988/FUL
NOTE:
Introduction of two tiered cycle parking to maintain the same number of parking spaces.
Richard G // 1 thread
A new research institute is planned for the Addenbrookes campus, plans are due to be submitted within a few weeks
There has been a exhibition of the overall plan & I have concerns about the cycle parking provision
Just wanted to report a collision on 1/6/15 at about 1700 between myself and a car in Cambridge.
Travelling South on Trumpington Road, turning into Fens Causeway I was hit by a car travelling North at the roundabout. There are three lanes of traffic heading north, the outmost car gave way correctly but the car in the second lane for whatever reason chose to accelerate onto the roundabout and hit me square on. I heard the noise of a revving engine, turned and watched the car drive straight into me. I felt the bonnet of the car as it hit and heard the sound of the impact, have a vague recollection about spinning through the air then hitting the tarmac. Although I was wearing a helmet it didn't help as I landed on my right buttock, back and leg.
Fortunately there were several witnesses including medically trained people who left their cars to help; the driver of the car involved remained in his car.
The police took about 25 minutes to arrive and the ambulance about 10 minutes after that.
I have nothing but praise for everyone who stopped and helped, the police, the paramedics and the A&E staff at Addenbrookes. The driver of the car knows what I think of him as I was quite vocal when he tried to get involved. He apparently told the police that I had 'cut the corner' of the roundabout. I'm not sure what he meant by this, nor was the police officer.
I count myself very lucky. Although I've been off work since the collision, I have no broken bones - just serious bruising, a lot of pain in my back and hip which I'm assuming will go away eventually. The ironic thing is that I'd been cycling from Melbourn to Hills Road since the previous week up and down the A10, and had decided to try a different route over Chapel Hill as I thought it might be safer.
I'm curious though, does this junction not have a history of collisions? I can recall seeing at least one there myself in the past. What is the recommended route for cyclists travelling this route?
I took the advice of the Campaign website and contacted Cycleaid for legal advice. I'll report back the outcome as things progress if anyone is interested.
BTW not sure how to draw a route on the map AND mark the collision point, so I've just done the latter.
By-election for the Romsey Division in June 2015
Martin Lucas-Smith // 1 thread
The University has published initial plans for a Masterplan for the West Cambridge site, which will see further extension towards the M11.
https://www.admin.cam.ac.uk/reporter/2014-15/weekly/6387/section6.shtml#heading2-11
Created by Robin Heydon // 1 thread
Extension to foodstore
ALDI Unit 1 157 Histon Road Cambridge Cambridgeshire CB4 3JD
Cambridge
Application reference: 15/0914/FUL
Created by Shaun McDonald // 1 thread
There is a footpath linking London Road to Columbine Gardens and Lupin Road, which has a series of barriers. Removing the barriers, ensuring there are dropped kerbs are on Columbine Gardens and Cowslip Close. Signs need to be added to sign post the route to the town centre, London Road, and appropriate other places.
This would mean that there would be direct link from Chantry on to London Road and into town along a potentially safer route than Gippeswk Avenue/Birkfield Drive.
Created by Rosie Downes // 1 thread
First consultation on the main scheme: 26 May to 31 July 2015
Second consultation on amendments to the scheme: 22 February to 20 March 2016
Created by Shaun McDonald // 1 thread
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
Created by Al Storer // 2 threads
The County Council have launched an initial consultation on improvements to Queen Edith's Way and Cherry Hinton Road (Hills Road to Mowbray Road). Very positively, what they're asking about is separated cycling facilities and bus stop bypasses. The devil will be in the detail as always, but the principle is good
http://www.cambridgeshire.gov.uk/site/custom_scripts/cons_details.aspx?ref=367
Created by Ross // 1 thread
Richmond Hiil and Ormond Road provide direct routes into Richmond town centre. However they are one way and force cyclists to take detours to get into town. Making these roads 2 way for cycling with contraflow cycle lanes would improve movement for cycles and remove some conflict which exists where cyclists ride on the pavement.
Created by Ross // 1 thread
Cycling around Richmond town centre is tortuous on a bicycle due to the one way system. To encourage even greater cycling journeys to Richmond town centre business the one way system should be redesigned to allow 2 way cycling for bicycles on Eton Street, Paradise Road and George Street. Ideally this should be achieved with segregated cycle contraflows
Created by Ross // 1 thread
Make Priests Bridge in Barnes - 2 way for cycling. Facilitate easier and shorter cycle journeys and link more effectively into LCN 37 and 4. Encourage cycle traffic of the busy A205.
Created by Rohan Wilson // 1 thread
Sustrans invites comments by 30 June on its draft chapters of a "Cycle-friendly Design Manual".
This document, once published, could influence local authorities to provide better, safer cycle routes, and so persuade people who are not yet cycling their every day journeys to do so.
Your comments please to designandconstruction@sustrans.org.uk by 30 June.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.