QW10 - Blackstock Road to Amwell St
Part of Quietway 10 - Bowes Park–Farringdon Quietway. Also referred to by ICAG as 'the Islington Quietway'.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by John Ackers // 2 threads
Part of Quietway 10 - Bowes Park–Farringdon Quietway. Also referred to by ICAG as 'the Islington Quietway'.
Created by Space Pootler // 2 threads
1. Relocation of the existing zebra crossing on Little Ealing Lane closer to Weymouth Avenue The crossing will be installed on a raised table which will help to slow down traffic. Existing parking spaces directly outside Little Ealing Primary School will be relocated which will improve visibility for drivers exiting Weymouth Avenue.
2. Installation of a new shared zebra crossing outside Mount Carmel Primary School. This will help parents and pupils of this school to cross the road safely, and make it easier for cyclists to turn right from Radbourne Avenue into Little Ealing Lane. The new zebra will be also raised which will help to further reduce speeds of vehicles. This will result in removal of existing School Keep Clear markings.
3. Cycle track adjacent to footway to separate cyclists form motor traffic on the section of the road where they are at the most risk. The track will also provide a safer link between Radbourne Avenue and Weymouth Avenue, which is part of a proposed ‘Quietway’ cycle route linking Brentford and Ealing. This will also result in removal of existing School Keep Clear markings which will be replaced by double yellow lines.
Created by Simon Munk // 1 thread
TfL Overview:
We would like your views on proposals to improve safety, journey time reliability and the urban realm on Commercial Road between New Road and Jubilee Street in the London Borough of Tower Hamlets.
We have identified a higher rate of collisions along this stretch of road compared to similar roads in London, particularly involving pedestrians, cyclists and motorcyclists. Therefore, we are proposing a scheme that is designed to reduce the number of collisions involving these vulnerable road users.
The area also suffers from vehicle congestion, particularly at peak times. Parked vehicles prevent buses from using the eastbound bus lane at busy times, which causes delays to bus passengers.
What are we proposing?
We are proposing to implement a number of changes to improve conditions for bus passengers and vulnerable road users. These include:
Pedestrians
- Raised carriageway with coloured surfacing on Commercial Road between Turner Street and Sidney Street to help lower traffic speeds and reduce collisions. There would still be a detectable kerb height between the road and the footway
- Converting the pedestrian crossing outside Watney Market to a wider straight crossing and relocating it closer to the market. This would mean pedestrians crossing in one stage rather than waiting on a central island. Pedestrian “Countdown” at the crossing would also be provided.
- Providing a wider crossing point for schoolchildren outside Mulberry School for Girls and installing electronic signs to make drivers more aware of schoolchildren crossing
- Raising the level of all side road entrances and providing kerb build outs to reduce traffic speeds, making it easier for pedestrians to cross
- Providing a continuous footway across the following side roads to give priority to pedestrians and a smoother crossing surface: Richard Street; Jane Street; Anthony Street; Fenton Street; Buross Street; Hungerford Street; Bromehead Street
- Reducing kerb heights, particularly around Watney Market, to help pedestrians
- Installing low level central islands to help pedestrians cross the road informally
- Upgrading pavements where damaged or uneven
Other Road Users
- Re-surfacing sections of the road to provide a smoother surface for cyclists and motorcyclists and to reduce noise
- Making Turner Street “no entry” to motor traffic (except cycles) from Commercial Road in order to improve safety outside Mulberry School for Girls and to prevent vehicles queuing back onto Commercial Road at busy times. Access would still be possible using other routes, and motorists would be able to exit Turner Street onto Commercial Road as they do now
- Widening bus lanes to 4.5 metres to allow cyclists and motorcyclists to pass buses more safely. We would create space for this by changing the hours of operation of the parking bays on the North side of Commercial Road
- Converting some existing parking bays into two new loading bays.
- Changing parking controls where necessary on the north side of Commercial Road by converting existing ‘all day’ parking (Mon-Sat 7am-7pm) to off-peak times (Mon-Sat 10am-4pm). This would allow the bus lane to operate at peak times (Mon-Sat 7-10am and 4-7pm)
- Providing Advanced Stop Lines for cyclists at junctions to let them wait ahead of other traffic
Urban Realm Improvements
- New tree planting where conditions allow.
- Improving the urban realm – reducing clutter, better paving and a more pleasant environment particularly around Watney Market
Created by Hugh McClintock // 1 thread
Comments welcome please on this consultation about barriers on rights of way.
Pedals believes that any kind of barriers should be avoided as far as possible, especially those of the A-frame design. If access controls really are needed they should take the form of bollards (or staggered bollards) rather than barrier.
Message of 22 Feb 2016 from John Lee, Nottm City Council
Morning all
Some of you will recall taking part in its preparation.
We are in the process of reviewing the attached Policy. The policy was in response to complaints about the design of barriers the council have used on rights of way to deal with motorcycles and users safety. Although barriers help deter illegal use some designs were causing problems for disabled citizens, mobility scooters, double buggies and cyclists. When deciding whether a barrier is the best solution for a particular problem/location, the policy has helped provide a consistent approach.
As part of the review do you have any comments on the policy, for example is there anything else the policy should include so the rights of way network is kept free from unnecessary obstructions and is accessible by all? Please forward onto any contacts who may have an interest.
Please could I have your comments by Monday 21st March.
Regards
John Lee
Public Rights of Way
Traffic and Safety
Development and Growth
Nottingham City Council
Loxley House
Station Street
Nottingham
NG2 3NG
Tele: 0115 8765246
Mobile: 07976 794880
www.nottinghamcity.gov.uk/rightsofway
Created by WildNorthlands // 0 threads
Highcliffe Rd is used as a rat-run between Fulwood and Bents Green/Ecclesall. It's a difficult road for cyclists as it starts off very steeply and is quite narrow, with cars parked on the uphill side. There is an alternative route through the woods - a bridleway that if brought up to standard would provide a very pleasant alternative for cyclists heading to/from Bents Green, with a direct link to NCN6.
Created by WildNorthlands // 1 thread
Redevelopment of the former Norton College site.
Created by M Stanley // 1 thread
Linton Bridge has been closed since the Dec 2015 floods.
Created by M Stanley // 1 thread
Created by T Harris // 1 thread
Hounslow Cycling has been asking for a Quietway on Essex Place as a way of getting to Belmont Primary School.
Lendlease currently have a planning application to redevelop the area
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.
Created by Ben Brierton // 1 thread
The new road layout on the westbound approach to M11 turning on Madingley Road has poor provision for cyclists.
Cyclists going westbound now have to take the second lane for a few hundred metres with traffic passing at speed on both sides. Traffic passing in the left lane will be taking the slip road onto the M11 and traffic in the second lane will be going straight on.
Created by Shaun McDonald // 1 thread
The cycle lane on Norwich Road is exceptionally narrow and not fit for purpose. Can't even fit a bike in it.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
What is the Draft Transport Strategy for East Cambridgeshire?
We have drafted a transport strategy to tackle the current and future transport pressures in and around the district, and to help support growth in East Cambridgeshire. The purpose of this strategy is to:
Provide a detailed policy framework and Action Plan of potential transport improvements for the area, addressing current problems and consistent with the policies of the third Cambridgeshire Local Transport Plan 2011-2031 (LTP3).
Support the East Cambridgeshire Local Plan, and take account of the committed and predicted levels of growth, detailing the transport infrastructure and services necessary to deliver this growth.
The strategy contains details of the schemes proposed in the short and medium term as well as the longer term schemes as proposed in the Long Term Transport Strategy.
We want the views of anyone who lives, works, visits or travels through East Cambridgeshire in order to improve this draft transport strategy. Let us know your views on the strategy objectives, policies and the action plan of proposed transport improvements for the area by answering the questionnaire before the 8th April 2016.
View the TSEC consultation leaflet (pdf, 1MB) for a summary of the information we are consulting on and answer the questionnaire. Alternatively, hard copies of the consultation leaflet and questionnaire are available at libraries and doctors surgeries around East Cambridgeshire or by request via the contact details below.
Come to talk to us and fill in a questionnaire at one of the public exhibitions below:
Created by dpattinson // 1 thread
Although cycle lanes are marked in parts along Chapeltown Rd going out of town, it is quite dangerous, especially where there is parking for the shops along the west side of Chapeltown Rd. A particular concern is just after the pedestrian crossing lights past Mexborough St, opposite Costcutters. The vehicle lane narrows for the pedestrian island in the middle of the road, but straight after it are car parking spaces which protrude out into the road, creating a bottleneck so cyclists have to go into the middle of the vehicle lane to get around cars parked there. I've had a few close calls there as impatient vehicles try to push past where there is no room.
It is almost normal during peak hour to have to negotiate cars parked on double yellow lines across the cycle lane.
Created by Robin Heydon // 1 thread
A simple tool for assessing the cycling environment, at the moment only for lengths of streets. This is not for a whole root assessment or for junction assessments.
Created by Dexter Johnstone // 1 thread
Blackstock Road widening from on the approach to Gleadless Road from Bankwood Road to Gleadless Road junction.
Created by T Harris // 1 thread
New cycle parking in Staines Road, Cavendish parade, Beavers Road, Martindale Road, Barrak Road, Laurel Gardens, Bath Road, St Paul's Close
Martin Lucas-Smith // 1 thread
Cambridge City Council is consulting on an update to its Historic Core Conservation Area Appraisal.
The Historic Core Conservation Area Appraisal covers 70+ streets in the city centre which are defined according to their significance. This significance can be their historical, architectural or social impact on the character and appearance of Cambridge.
The original appraisal, which was published in 2006, has been reviewed to ensure that it is up to date with any new developments within the city centre, and that any new pressures on the historic heart of Cambridge are recognised. This revised document is now out to public consultation.
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by T Harris // 2 threads
‘Segregated cycleway’ planned for western side of Gunnersbury Avenue (next to park and cemetery)
Transport for London are proposing widening the cycleway on the western side of Gunnersbury Avenue, next to the cemetery and park.
‘Shared pavement’ planned for eastern side of Gunnersbury Avenue
TfL are proposing to make a 5m wide ‘shared use area for pedestrians and cyclists’ on the eastern side.
Created by Simon Munk // 1 thread
TfL overview
We are proposing a number of changes at Hammersmith gyratory, King Street, Beadon Road and Hammersmith Road as part of our Road Modernisation Plan, in partnership with Hammersmith & Fulham Council (H&F Council).The proposals aim to deliver a safer and more direct east-west cycle route through Hammersmith town centre.
What are we proposing?
We are proposing to create a direct, kerb-segregated two-way route for cyclists across the northern side of the gyratory, with separate cycle signals to protect them from traffic. This would remove the need to cycle round the gyratory, mixing with fast-moving traffic, and break a key barrier to cycling in west London.
To improve conditions and safety for cyclists we would:
- Provide a segregated two-way cycle track on the north side of Hammersmith gyratory. Cyclists would be physically separated from traffic by a kerb. We would make room for the cycle track by reallocating space from some sections of the wide pavement on the south side of the road
- Separate cyclist and motor vehicle movements at junctions; cyclists would have their own traffic signals which would be green at different times to those for motor traffic
- Extend the eastbound contraflow cycle track on King Street to allow cyclists to reach the gyratory from Hammersmith Town Hall without having to follow Studland Street, Glenthorne Road and Beadon Road. The cycle track would be ‘stepped’, meaning it would be at a height between the road and footway, and become physically separated with a kerb east of Lyric Square. We would make room for the cycle track by reallocating some space from the pavement on the south side of King Street
- Provide a short two-way section of cycle track on Queen Caroline Street to allow access to Black’s Road and Hammersmith Bridge Road
- Enable cyclists to pass through the island at the junction of Hammersmith Broadway and Butterwick, and increase the size of the island to accommodate cyclists and pedestrians
We would also make the following changes in the area:
- Provide a new bus lane on Beadon Road, between Glenthorne Road and Hammersmith Broadway
- Remove the pedestrian crossing between the south side of Hammersmith Broadway and Shepherd’s Bush Road to allow for provision of the segregated cycle track
- Install pedestrian countdown signals at the crossings of King Street, Beadon Road, Shepherd’s Bush Road, Queen Caroline Street, Hammersmith Broadway and Butterwick
- Widen the footway on King Street where possible to provide more space for pedestrians in this busy area
- Raise the carriageway to footway level on King Street opposite Lyric Square to make crossing more convenient for pedestrians and encourage slower motor vehicle speed
- De-clutter pavements by rationalising locations of street furniture
- Increased cycle parking
- Relocate one loading bay and two disabled parking bays on Black’s Road to provide space for additional taxi rank spaces
Why are we proposing this?
TfL is investing £4bn in the Capital’s vital road network to ensure London’s roads are able to meet the needs of a growing population. As part of this plan, we are reviewing junctions and gyratories across London to make them safer for all road users, including cyclists, and to make journey times more reliable. Hammersmith gyratory is used by many cyclists each day, and can be an intimidating place to cycle. Hammersmith is one of the Mayor of London’s 33 priority “Better Junctions”.
H&F Council’s cycling strategy sets out an ambitious plan to increase the number of people cycling in the borough to reach eight per cent of all journeys. Part of this plan is to deliver a segregated cycle route along the A315 corridor, a key commuter route for cyclists. Hammersmith gyratory lies on this route.
We are proposing to give cyclists dedicated space and separate cycle signals at junctions on the northern side of the gyratory. This would offer cyclists a more comfortable and direct route between King Street and Hammersmith Road, bridging the gap in the proposed A315 cycling route that the gyratory currently creates.
Removal of the pedestrian crossing
To ensure cyclists have adequate space to wait for a green signal on the island at the south of Shepherd’s Bush Road, we would need to remove the existing pedestrian crossing that connects this island to the south side of Hammersmith Broadway.
Although the crossing is less well-used than others in the area, its removal would mean pedestrians would have to find alternative routes. Those walking between the south side of Hammersmith Broadway and the west side of Shepherd’s Bush Road would need to cross Queen Caroline Street and Beadon Road. Those walking between the south side of Hammersmith Broadway and the east side of Shepherd’s Bush Road would have a choice between crossing Queen Caroline Street, Beadon Road and Shepherd’s Bush Road or crossing Hammersmith Broadway at its junction with Butterwick.
The vast majority of pedestrians crossing Hammersmith Broadway from outside the Piccadilly Line tube station use the most western of the two crossings.
Impact on buses
Beadon Road is narrow and carries a high volume of buses and general traffic. To reduce delays currently experienced by buses approaching the gyratory, we would provide a new bus lane on Beadon Road between Glenthorne Road and Hammersmith Broadway, replacing one of the two general traffic lanes.
We also would need to relocate bus stop Z5 on the gyratory, which is currently used for emergency purposes only, to Butterwick.
How would bus and traffic journey times be affected?
Our proposals would affect some journey times through the area. In the main these changes would not be significant, with some bus and general traffic journeys getting shorter and some getting longer. The most notable increases in journey times will be for traffic approaching Hammersmith gyratory from Fulham Palace Road in the morning and evening peaks.
Impact on other road users
We propose to relocate the position of one loading bay on Shepherd’s Bush Road, with the existing dimensions remaining, in order to allow for an increase in the size of the existing taxi rank.
How does this fit in with the wider plans for Hammersmith town centre?
TfL and H&F Council are working together on ambitious plans for a long-term transformation of Hammersmith town centre.
We are proposing shorter-term improvements to improve safety and connectivity for existing cyclists and support the Council’s cycling strategy to increase the number of new cyclists in the area. This plan is separate to, and does not affect longer term proposals for the area, however these proposals would be integrated with any future schemes.
Delivery of the wider A315 cycling improvements
TfL and H&F Council are also working together on plans for an east-west cycling route along the A315. Plans for this route either side of Hammersmith gyratory are currently being developed, with public consultation planned to take place later this year.
Created by Goalie911 // 2 threads
I have noticed that cyclists use both sides of the one way street (The Common, Hatfield).I was just wondering if there's a two way cycling system in use?
Created by Simon Munk // 1 thread
TfL Overview
We are proposing to make changes on A205 Stanstead Road at two locations. One proposal includes improving the pedestrian crossing facilities at the junction of Brockley Rise and A205 Stanstead Road. The second proposal includes removing a loading bay from A205 Stanstead Road to Ravensbourne Road.
What are we proposing?
Brockley Rise
We propose to install a new signal-controlled ‘staggered’ crossing on Brockley Rise. To achieve this, we propose to create a safer pedestrian waiting area by widening the central reservation, while maintaining the two lane approaches to the junction heading south along Brockley Rise. We propose to improve the footway layout by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.
We also propose to modify the loading and parking bays to allow for traffic to turn into Brockely Rise. The bay would be slightly shortened by 2.5m and moved north by 2.5m.
Cranston Road
Similar to Brockley Rise, we propose to install a new signal-controlled ‘staggered’ pedestrian crossing on Cranston Road. We would create a safer pedestrian waiting area by enlarging the central island. We would also improve the footway by providing a suitable gradient at the crossing for all users, particularly pushchairs and wheelchairs users.
Created by Simon Munk // 1 thread
TfL Overview
In partnership with the London Borough of Southwark, we have developed proposals to improve the provision for cyclists and other road users around Tower Bridge Road/Tanner Street junction, and we would like to hear your views.
What are we proposing?
The proposals are part of the Central London Grid – a network of cycle routes in Zone 1. The route passes along Tanner Street, Southwark Council consulted on proposals on the rest of the route in autumn 2015, including proposals for the one-way operation of Tanner Street. Our proposals aim to improve safety and create more space for cyclists, and have been coordinated with Southwark Council’s designs.
Our proposals also include changes to traffic and bus lanes, as well as new traffic restrictions and improved pedestrian crossings.
The enclosed consultation drawing shows the proposals for this junction. The numbered descriptions below correspond with the numbered labels on the drawing.
1 Carriageway to be widened by 0.5 metres to improve traffic flow. There will still be sufficient width maintained on the footway.
2 Centre lines to be altered to provide two northbound general traffic lanes further back from the junction with Druid Street
3 New one-way westbound on Tanner Street between Tower Bridge Road and Archie Street to create space for a segregated two-way cycle track
4 New one-way eastbound on Tanner Street between Tower Bridge Road and Pope Street to allow for contraflow cycle provision
5 Segregated bi- directional cycle track to allow cyclists to approach and exit the junction with substantially reduced risk of conflict with motor vehicles
6 New segregated contraflow cycle track to parallel crossing to allow for safer approach for cyclists, and to decrease potential conflict between modes of traffic. This would require the relocation of a loading bay (see 9 and 10)
7 New parallel cycle/pedestrian crossing to connect the cycle route on Tanner Street and allow cyclists to conveniently cross Tower Bridge Road separately from pedestrians
8 Cycle stands to be relocated to allow for widened traffic lanes on the approach to the junction, and to prevent conflict between traffic modes
9 Loading bay relocated from Tanner Street to Tower Bridge Road to create space for the contraflow cycle track (see 6). The same operating hours will apply
10 New position of relocated loading bay from Tanner Street (see 9)
11 Loading bay relocated 12m south to provide enough space for traffic to merge. Operating hours will remain the same.
12 New bus lane (Hours of operation: Mon –Sat, 7am-10am, 4pm-7pm) to make journeys faster and more reliable for bus passengers. We would create space by moving the centre line on this section of Tower Bridge Road.
Created by Simon Munk // 5 threads
Full route of Quietway 7 Elephant & Castle to Crystal Palace
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.