Crossing Cove Road
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Sarah Wood // 0 threads
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
The Greater Anglia franchise is due for renewal in October 2016 and the process has already started. It is quite unsusal to have a station serving such a large number of passengers with access on only one side o the tracks. This situation leads to many more and longer car journeys along Mill Road, Cherry Hinton Road and Hills Road.
There is an existing access via (non-residential) Clifton Road to the east side of the station and there is vacant land. We need to argue the case for an eastern entrance to the station, along with cycle parking and pedestrian access. There is a mainly empty car park on the other side of the tracks. We should also try to include a link from the Carter bridge to the new cycle park.
Interested parties
3 shortlisted franchises
local MPs
Minister responsible (Clare Perry MP)
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by Jon G // 1 thread
The Embankment, Twickenham is a two-way street. Many driver sseem to think it is one-way Westbound. Even the Cyclescape map wrongly marks it as one-way! It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding Eastward along it.
Created by Jon G // 1 thread
Bell Lane is two-way. Most drivers using it go Northward and many seem to think it is one-way that way. It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding South along it.
Created by Jon G // 1 thread
Cricket Lane is a dead end and therefore two-way. Since an exit from a car park was built leading into it, many drivers seem to think it is a one-way street from the car park. In fact it is used by cyclists going in both directions between High St and Bushy Park.
It needs signs clarifying that it is two-way, as drivers are being obstructive or abusive to cyclists legitimately using it.
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
Created by Richard Taylor // 1 thread
Proposal for three new pedestrian and cycle access points to Cambridge Business Park. The proposals are being made in light of the plans for an new station nearby.
Representations from companies with premises on the business park - Redgate and Autonomy - have expressed concerns about security and the potential for people to try and park on the business park and then get on a train.
The proposals are for the new accesses to be gated to restrict general public access.
The proposals include a connection to the potential cycleway along the line of the disused railway.
Cambridge Business Park Cowley Road Cambridge Cambridgeshire CB4 0WZ
Cambridge
Application reference: 15/0919/FUL
Created by Violinist John // 1 thread
Noticed this a couple of weeks ago. As you will see the sign is incomplete and misleading given that the place to see all the details is the end of Ferry Lane waiting to join High Street. High Street at this point is both Route 51 and Route 11.
Major points:
Left turn to go to Impington on Route 51 - I think not.
Abbey and Fen Ditton to the left when you could just go back across Green Dragon bridge.
No directions to Histon, Milton, Waterbeach probably others.
Also the lack of any idea where route 11 goes to the right.
This appears to be one of a number of new signs that have recently appeared. If anyone has seen any more let's get the info out there and try to get them fixed.
Created by Iain Lane // 1 thread
Some new lamp posts have been installed on the pedestrian side of this split ped/cycle path. This reduces the effective width of the path and creates conflict.
Created by Katja Leyendecker // 0 threads
Council is planning changes on parts of Heaton Road
http://www.newcastle.gov.uk/parking-roads-and-transport/cycling/strategic-cycle-routes/improvements-heaton-road
Discuss your thoughts and ideas here!
Created by Roxanne (CEO) // 3 threads
Relocation of the existing liquid nitrogen (LN2) tank, Denios unit and cycle parking facilities.
Department Of Chemistry Lensfield Road Cambridge Cambridgeshire CB2 1EW
Cambridge
Application reference: 15/0988/FUL
NOTE:
Introduction of two tiered cycle parking to maintain the same number of parking spaces.
Richard G // 1 thread
A new research institute is planned for the Addenbrookes campus, plans are due to be submitted within a few weeks
There has been a exhibition of the overall plan & I have concerns about the cycle parking provision
Just wanted to report a collision on 1/6/15 at about 1700 between myself and a car in Cambridge.
Travelling South on Trumpington Road, turning into Fens Causeway I was hit by a car travelling North at the roundabout. There are three lanes of traffic heading north, the outmost car gave way correctly but the car in the second lane for whatever reason chose to accelerate onto the roundabout and hit me square on. I heard the noise of a revving engine, turned and watched the car drive straight into me. I felt the bonnet of the car as it hit and heard the sound of the impact, have a vague recollection about spinning through the air then hitting the tarmac. Although I was wearing a helmet it didn't help as I landed on my right buttock, back and leg.
Fortunately there were several witnesses including medically trained people who left their cars to help; the driver of the car involved remained in his car.
The police took about 25 minutes to arrive and the ambulance about 10 minutes after that.
I have nothing but praise for everyone who stopped and helped, the police, the paramedics and the A&E staff at Addenbrookes. The driver of the car knows what I think of him as I was quite vocal when he tried to get involved. He apparently told the police that I had 'cut the corner' of the roundabout. I'm not sure what he meant by this, nor was the police officer.
I count myself very lucky. Although I've been off work since the collision, I have no broken bones - just serious bruising, a lot of pain in my back and hip which I'm assuming will go away eventually. The ironic thing is that I'd been cycling from Melbourn to Hills Road since the previous week up and down the A10, and had decided to try a different route over Chapel Hill as I thought it might be safer.
I'm curious though, does this junction not have a history of collisions? I can recall seeing at least one there myself in the past. What is the recommended route for cyclists travelling this route?
I took the advice of the Campaign website and contacted Cycleaid for legal advice. I'll report back the outcome as things progress if anyone is interested.
BTW not sure how to draw a route on the map AND mark the collision point, so I've just done the latter.
By-election for the Romsey Division in June 2015
Martin Lucas-Smith // 1 thread
The University has published initial plans for a Masterplan for the West Cambridge site, which will see further extension towards the M11.
https://www.admin.cam.ac.uk/reporter/2014-15/weekly/6387/section6.shtml#heading2-11
Created by Robin Heydon // 1 thread
Extension to foodstore
ALDI Unit 1 157 Histon Road Cambridge Cambridgeshire CB4 3JD
Cambridge
Application reference: 15/0914/FUL
Created by Shaun McDonald // 1 thread
There is a footpath linking London Road to Columbine Gardens and Lupin Road, which has a series of barriers. Removing the barriers, ensuring there are dropped kerbs are on Columbine Gardens and Cowslip Close. Signs need to be added to sign post the route to the town centre, London Road, and appropriate other places.
This would mean that there would be direct link from Chantry on to London Road and into town along a potentially safer route than Gippeswk Avenue/Birkfield Drive.
Created by Rosie Downes // 1 thread
First consultation on the main scheme: 26 May to 31 July 2015
Second consultation on amendments to the scheme: 22 February to 20 March 2016
Created by Shaun McDonald // 1 thread
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
Created by Al Storer // 2 threads
The County Council have launched an initial consultation on improvements to Queen Edith's Way and Cherry Hinton Road (Hills Road to Mowbray Road). Very positively, what they're asking about is separated cycling facilities and bus stop bypasses. The devil will be in the detail as always, but the principle is good
http://www.cambridgeshire.gov.uk/site/custom_scripts/cons_details.aspx?ref=367
Created by Ross // 1 thread
Richmond Hiil and Ormond Road provide direct routes into Richmond town centre. However they are one way and force cyclists to take detours to get into town. Making these roads 2 way for cycling with contraflow cycle lanes would improve movement for cycles and remove some conflict which exists where cyclists ride on the pavement.
Created by Ross // 1 thread
Cycling around Richmond town centre is tortuous on a bicycle due to the one way system. To encourage even greater cycling journeys to Richmond town centre business the one way system should be redesigned to allow 2 way cycling for bicycles on Eton Street, Paradise Road and George Street. Ideally this should be achieved with segregated cycle contraflows
Created by Ross // 1 thread
Make Priests Bridge in Barnes - 2 way for cycling. Facilitate easier and shorter cycle journeys and link more effectively into LCN 37 and 4. Encourage cycle traffic of the busy A205.
Created by Rohan Wilson // 1 thread
Sustrans invites comments by 30 June on its draft chapters of a "Cycle-friendly Design Manual".
This document, once published, could influence local authorities to provide better, safer cycle routes, and so persuade people who are not yet cycling their every day journeys to do so.
Your comments please to designandconstruction@sustrans.org.uk by 30 June.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”