Traffic Light Sensor
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by Tom Chance // 1 thread
Making it safe and convenient to travel from Sydenham Hill onto London Road and then onto Wood Vale would improve the link from this part of Sydenham / Crystal Palace into East Dulwich and onto the LCN 25 and 22 routes north.
Currently one can either dismount at the bottom of the hill, cross Sydenham Hill and then London Road by foot and then take the off-road cycle lane onto Wood Vale; or one can cycle left onto London Road, cross two lanes of traffic, brake into the little cut and cross over the southbound traffic to get onto Wood Vale. The first route is slow and inconvenient, the second is dangerous.
Created by David Earl // 1 thread
According to the Cambridgeshire Road works register, Pembroke Street is going to be closed for a long period starting September 2 by the museum of Zoology. Not clear what, if any, the impact on cycles would be, but the hole will be a dramatic 10m deep, so the works will presumably be quite extensive. Also, Tennis Court Road closed for one day on August 9 to prepare.
http://roadworks.org/?u_se_id=30862209:1&e=545014&n=258186&z=7&t=b
Created by Chris Sandbrook // 1 thread
I have just watched a police car over-run the advanced stop lines twice on Gilbert road, once at the Carlton Way cross roads and then again at the Milton Road T-junction. Both times the police car was approaching an already red light, so they had ample time to stop before the line. The second time they filled at least half of the box. If the police in Cambridge can't be relied on to respect the advanced stop line, how can we expect the general public to do so? Does anyone have similar stories or any suggestions on what to do about it? I didn't get the number plate unfortunately, because I thought turning round and photographing a police car on my phone might be more trouble than it's worth!
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WilliamNB // 0 threads
When cycling north-bound along Tavistock Road, there is a cycle lane in places. Once out from under the Crownhill Road bridge the lane turns sharply left, forcing cyclists to yield to traffic joining Tavistock Road from the left.
The Highway Code states you should yield to traffic from the right and this junction is very dangerous to cyclists. It would be far better to simply continue the cycle lane straight ahead and erect yield signs to traffic joining Tavistock Road
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Martin Lucas-Smith // 1 thread
The Cambridge News reports that new traffic calming is to be installed on Fen Road.
Cyclists' views ought to be included so the opportunity is taken to improve things for cycling rather than make things worse.
http://www.cambridge-news.co.uk/News/150k-project-to-tackle-Fen-Road-racers-20130803060000.htm
Created by DaveE // 0 threads
The dropped kerb is about 5-10m down the pavement from where the cycle-path meets the road. This encourages cyclists to cycle along the pavement and there are no shared use signs to warn pedestrians.
Created by DaveE // 0 threads
The link between the cycle-path and Trent Close is missing. It is expected that cyclists should dismount, negotiate a large number of parked cars, and an un-dropped kerb to go from cycle path to road or vice-versa. This is unreasonable and I can't think of a reason not to have the cycle path join straight into the end of the road with no interruption.
The current situation encourages cyclists to cycle along the pavement for entire length of Trent Close to reach a dropped kerb, causing unecessary delay and potential conflict between cyclists and pedestrians, as the pavement isn't very wide.
Created by DaveE // 0 threads
The road surface on Wimlands Road is quite dangerously poor. There is much gravel on the road, particularly in the centre, and there are numerous small potholes to dodge.
This is leading to a risk of accidents involving cyclists and putting off inexperienced cyclists from cycling to work.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
The condition of the cyclepath is so bad that a road bike with narrow tyres cannot be comfortably or safely ridden along the cycle side of the segregared path. There are numerous potholes of more than 25mm depth and quite a bit of loose gravel besides a generally very rough surface. The surface is more pothole than surface in places! It is even bad for mountain bikes and especially bad for small wheeled bicycles such as folding bicycles. This is forcing cyclists to use the pedestrian side of the path, with the potential for safety issues and confrontation. Last seen mid July 2013.
Cycling provision totally inadequate in proposals.
Created by Jon Warbrick // 1 thread
Contractor's safety fencing for some of the work going on adjacent to Addenbrookes has been put up on the adjacent cycle path, presumably because it's easier to to that than put it up in the building site itself. Unfortunately this obstructs about a third of the path.
Whoever did this obviously realised that this was problematic, since they have painted the path side of all the bases yellow. Unfortunately this doesn't help in the dark.
I can't see any obvious contact details for the contractors, apart from 'Tamdown' on an attached 'Danger - Deep Excavation' sign. Anyone any idea how to get this addressed?
Notice is herby given that Southampton city council
proposes to make the following
The City of Southampton(various roads)
(movement restrictions)(amendment no9)order 2013
1. the effect of the order is to remove the contraflow cycle lane on
second avenue between first avenue and the north-westernmost
access to the NXP site, approximately 150metres south-east of allington
road thus reverting this part of second avenue to two way traffic. The
contraflow cycle lane will remain on the part of second avenue between
the north-westernmost access to the NXP site and allington road.
2.Copies of the order, relevant map and statement of reasons for
proposing may be inspected during normal working hours at my enquiry
office. Further information may also be obtained from the Southampton
Highways Partnership (traffic management) on 02380798064
3.Any person wishing to object to the order must write to at the
address given below or email:
Traffic.Orders.legal@southampton.gov.uk stating the grounds for
objection within 21 days of this notice (i.e. by 2 August 2013)
Dated 12 July 2013
Richard Ivory Head Of Legal, HR and Democratic Services,
Created by Sam Saunders // 0 threads
The Brunel Mile is a notional route between Millennium Square and Temple Meads Station. A video (date uncertain) on the Better By Bike website shows the intended journey. http://www.betterbybike.info/video-list/millennium-square-to-bristol-temple-meads-along-brunel-mile
Some of the route shown in the video corresponds with Bristol Cycling Campaign's important orbital freeway: Fo1 Inner Loop Redcliffe Way to Triangle. (see https://maps.google.co.uk/maps/ms?msid=213139683046776952805.0004d820d652973f23c70&msa=0&ll=51.491805,-2.665343&spn=0.025758,0.032959&dg=feature) To enable a network to develop coherently as it grew, Fo1 would be our recommended route.
As it stands (July 2013) there is only one short section of the Brunel Mile that meets a majority of the criteria that would characterise a cycling Freeway, namely the segregated cycle lane across Redcliffe Bridge which fails only on the "continuous" criterion. It seems important that all of it should do, as a priority, given that sections of the Brunel Mile are very heavily used by cyclists and pedestrians, especially at peak times. For many visitors coming by train with cycles or using the Brompton Dock at Temple Meads this will be a first experience of cycling in Bristol. It needs to make sense and to be easy to use first time.
Issues and suggestions, as things stand, are as follows
1. Pero's Bridge already has too much pedestrian and cycle traffic. It is often uncomfortable for pedestrians and for cyclists. Keeping it as part of a major cycle route through the city is unacceptable. Route Fo1 uses Prince Street instead, where a wide segregated cycle lane would be feasible.
2. The Royal Oak Avenue, Queen Square and Bell Avenue sections would benefit from clear segregation of pedestrians and cyclists, along the lines suggested by the de facto segregation that tends to happen at peak times.
3. The pedestrian and cycle crossing at Welsh Back might benefit from an analysis of behaviour at that junction and consideration of standards adopted in other places. Casual observation suggests a great deal of uncertainty among all road users as to what is supposed to happen and who has priority.
4. At the end of Redcliffe Bridge cyclists are faced with uncertainty as to whether to continue along the paved area beside Freshford House or use the pavement alongside Redcliffe Way. Signage at that point (as it is all along the route) is confusing, inconsistent and unspecific.
5. Crossing Redcliffe Street by cycling straight over the zebra crossing and expecting cars to stop seems to be condoned, and practised. This doesn't feel right and matches no standards that I am aware of. A clear decision needs to be made about how cyclists and pedestrians can cross here without arcane knowledge of "Bristol Rules". Many of those using this (as on the other crossings on the Brunel Mile) are visitors to the city on their first mile of city cycling.
6. The following section of Portwall Lane could be made into a fully segregated cycle lane, with a better crossing at Phippen Street. The numbers of pedestrians, cyclists and out-of-office smokers on this section can be very high and leaving the traffic to fend for itself is inimical to a genuine 8-80 environment.
7. At the end of the Portway there is great ambiguity about how to reach Temple Meads on a bike. The Better By Bike video shows the least satisfactory option that ends abruptly on the wrong side of Temple Way with two busy pedestrian crossings and an unsatisfactory cobbled road to negotiate before reaching the front of the station. Most cyclists seem to use one of the more direct routes over light controlled crossings to The Friary, thence to the side entrance of Temple Meads where the presence of the Brompton Docks and the Cycle Hub van give a natural welcome.
8. Development work on the derelict "island" around Portwall Road East should take full account of the existing use of that section as a crossing point for cyclists and pedestrians getting to and from Temple Meads Station.
In conclusion, A cyclist coming off the platforms at Temple Meads should be able to see very clear signs about which exit to use, and which path to use to get to Bristol City Centre. At present there is nothing at all. Once they have made an exit they should be able to see cycling specific signs that are prominent and clear. They should then be able to follow a designated route that is self-evident and waymarked. The current pedestrian signs are elegant and have good maps, but they are no more use to cyclists than they are to motorists.
A cyclist wanting to get to Temple Meads Station from Bristol City Centre should be able to find the Brunel Mile (on Fo1) from wherever they are without too much difficulty, and then follow it confidently all the way to the railway platforms.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by Eric Booth // 1 thread
I need to report a problem with a route in Whitehall. The council made a hoohaa about linking the cycle path to St George Park. They installed a contraflow in Stretford Road, a bike crossing over Whitehall Road and signage between the cycle path and the park. Laudable. I have used this route to take my daughter to Whitehall Primary School on Johnsons Road for the last year. She had her first Bikeability Lesson on Sunday and is now riding to school (aged 6 - v. proud!!). However, where the link goes through a snicket between the Kings Head pub and Packers Field it is being blocked by cars. This is making navigating a blind corner even more dangerous. Links to pictures below.
A lot of money was spent on this link and its being rendered unusable.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by SallyEva // 2 threads
Mina Road would be no entry, apart from cyclists, from the junction with Ivy Church Lane. This will prevent northbound traffic entering from Mina Road onto B203 Dunton Road, to prevent stopping on the hatch markings at the junction with the A2 Old Kent Road. This movement can cause congestion and a road safety risk to all users.
Motor vehicles would not be able to use Bagshot Street and Mina Road for access onto the A2 Old Kent Road. The scheme would improve conditions and safety for local residents and cyclists. The reduced amount of traffic will create a safer environment.
Road users who normally would use Mina Road to access the A2 Old Kent Road would need to use Bagshot Street, Albany Road and Shorncliffe Road. The parking and loading bays on the northern side section of Mina Road would remain unchanged.
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Anon // 1 thread
Wandsworth Council in TMO 1644 propose removing the contra-flow segregated cycle track at the eastern end of Putney Embankment to allow a hoarding to be built around the Thames Tideway tunnel construction site. The track will be re-opened when the work is complete, but this could take at least a year. It is proposed that eastbound cyclists join the Upper Richmond road by the Dukes Head pub and then continue on this road. Wandsworth Cycling Campaign objected to this on the grounds that the Upper Richmond Road is extremely heavily trafficked and the proposed diversion involved cycling past a row pf parking bays . This would be very difficult and hazardous for the mix of cyclists using the Thames Path of which this forms part. We asked that the parking bays be temporarily removed and replaced by a 1.5 to 2 m cycle lane separated from the motor traffic by wands or similar. For west-bound cyclists using the narrow lane left on Putney Embankment past the work site, we asked for the installation of 'Do not overtake cyclists' signs.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Gipsy Hill // 2 threads
Introduction:
Quietway7 links a cycle route from Elephant & Castle (E&C) with Crystal Palace, and was routed by TfL to be via Dulwich Village, West Norwood (Thurlow Park Road), Gipsy Hill and then Crystal Palace (via Farquhar Road).
The route from E&C southbound is in Southwark (to Dulwich) then is in Lambeth (Turney Road, Rosendale Road/Thurlow Park Road, Hamilton Road, to Gipsy Hill), then goes back into Southwark (from Gipsy Hill to Crystal Palace). Southwark had their part of the quietway consultation approved.
Lambeth delayed their decision to June 2017, and was then subsequently “called in” as there was widespread concerns from both the local community and cycling groups for parts of the route. Cycling groups unanimously objected to the proposed design along Gipsy Hill by: Southwark Cyclists, Lambeth Cyclists and Wheels for Wellbeing. 70% of respondents objected to the the design on Gipsy Hill. Gipsy Hill is a busy Local Distributor Road and bus route. Gipsy Hill has “insufficient road width” for a segregated track. The original proposed design meant motor vehicles “will encroach on the advisory cycle lane” to allow oncoming motor vehicles to pass.
Gipsy Hill Options:
There are alterative options to avoid Gipsy Hill. Southwark Cyclists have supported the design option to follow LCN23 downhill all the way along Dulwich Wood Avenue and then using the other side of Long Meadow (so not using Gipsy Hill), with a new track behind the bus stop.
See navy dashed line on sketch attached (mauve was the proposed Q7 design, red is LCN23)
This design is quieter and safer than using Gipsy Hill, and avoids the proposed dangerous junction Gipsy Hill/ Dulwich Wood Avenue, near the rail station. This integrated design also allows greatest cycle access to local amenities, schools, shops, and parks in Dulwich, West Dulwich and West Norwood. There is interest and outline support from Southwark to explore this option.
Next Steps:
Lambeth are now actively progressing engagement and revised designs for their part of the route, with a new consultation process due in September. There is potential for an improved option at Gipsy Hill, but this is likely to need new additional funding from TfL.
Suggested, to let local Gipsy Hill Ward Cllrs (Lambeth) and College Ward Cllrs (Southwark) and local cycling groups know your views.
Background:
Lambeth proposal that was called-in, see reports:
- Quietway 7 - Elephand Castle to Crystal Palace - Decision Report – 12 June 2017
- Appendix B - Quietway 7 - details designs (Gipsy Hill pages: 23, 46-49)
http://www.cpneighbours.org/gipsyhillquietway/
Thurlow Park Ward Cllr updates:
http://thurlowparklabour.org/post/162548844962/quietways-engagement-next-steps
TfL Quietway 7 Programme (Elephant & Castle to Crystal Palace) - Proposed changes in Lambeth - West Dulwich area
https://consultations.tfl.gov.uk/cycling/lambeth-q7-wd/
LCN23 Map:
https://www.openstreetmap.org/relation/2707#map=17/51.42643/-0.08336
What are Quietway?
London Cycling Design Standards, Chapter 1 (page 15):
Quietways “..are aimed at new cyclists who want a safe, unthreatening experience.” The key principles for Quietways include:
o Routes should be on the quietest available roads consistent with directness;
o Routes should be as straight and direct as possible;
o where they have to join busier roads, or pass through busy, complicated junctions, segregation must be provided;
http://content.tfl.gov.uk/lcds-chapter1-designrequirements.pdf
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)