Greater Anglia Cycle Strategy
Greater Anglia has just issued a consultation on cycles at stations and on trains
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Al Storer // 4 threads
A citywide (and indeed beyond) problem is poor consideration given to the needs of cyclists and pedestrians during road works- eg "cylist dismount" sign use
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by aSemy // 0 threads
https://www.citizenspace.com/bristol/city-development/baldwin-street-cycle-safety-fund-scheme
Overview
The purpose of this scheme is to address the large number of crashes involving cycles on Baldwin St, at the junction with Queen Charlotte Street.
We propose extending the existing cycle track at Welsh Back and take it across the junction via a humped crossing. We have introduced a ‘floating bus stop’ to separate buses and cyclists. There will be a formal crossing point for pedestrians to access the stop from the footway.
A small number of parking places would be removed but loading, bus and taxi facilities are retained, although altered.
Created by Shaun McDonald // 0 threads
The legal pavement cycling is suddenly not allowed 3 car lengths before a cycle shop near this junction which has toucan crossings and cycle paths on all other sides of it. Why can't it be continued to the bike shop for a safe cycle route to/from the junction away from traffic?
Created by Shaun McDonald // 0 threads
The cycle cut through between Appold St and Worship St is often blocked by pedestrians or Taxis dropping off passengers. It's also too narrow, thus can only be used one way, and isn't suitable for higher levels of two way cycling.
Created by Jean Dollimore // 5 threads
Camden Council proposes major improvements to Cobden junction – the junction of Camden High Street with Crowndale Road and Hampstead Road at its southern end.
They propose the following measures:
- eliminate the unnecessary northbound road on the east side of the island
- gain extra footway space on the east side of the road (uses to include cycle parking, trees, seating)
- widen the footway outside Mornington Crescent Station
- safer, quicker and simpler pedestrian crossings
- improved link for cyclists to the Mornington Crescent quiet route (from Arlington Road).
- new ASL boxes with lead-in lanes on the approach to the junction from Eversholt Street, Crowndale Road and Hampstead Road.
- re-site the statue of Richard Cobden and the war memorial
Proposal for contraflow cycling on Crowndale Road:
A few months ago, we were shown designs for a contraflow on Crowndale Road between Hampstead Road and Bayham Street with some junction changes at the latter to accommodate it. Unfortunately, this was rejected by TfL on the grounds that it would delay buses. This consultation notes that the layout has been designed to accommodate the contraflow at a future date.
This consultation also says that in addition, alternative options for providing a west to east link are being explored at both Delancey Street / Pratt Street and Oakley Square. We need to encourage Camden to pursue these essential links. In the case of the latter, there is an urgent need to allow cyclists to make right turn right into Hampstead road from the southern end of Mornington Crescent.
See consultation on Camden Council website:
https://consultations.wearecamden.org/culture-environment/cobdenjunction
Created by Aidan Van de Weyer // 0 threads
The Hills Road / Regent Street axis of the Catholic Church junction was resurfaced overnight (28-29 August) as part of the junction upgrade.
Many of the damaged iron works (manhole covers, etc) have not been changed. Some are in a bad state and quite dangerous because they have worn smooth, sunk or tilted.
I have contacted the Traffic Signals team at CCC, as they seem to be responsible for the works, and they should be getting back to me.
If anyone else fancies having a go at finding out what is going on and whether anything can now be done, it would be very welcome.
Created by George Coulouris // 1 thread
For discussions on the design of the new website, following the CCC Committee decision to initiate the construction of a new CCC website.
A working party has been set up, consisting initially of George, Jean, Ben and Geoff.
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Ben Edmonds // 1 thread
Redesign of street to include two-way for cyclists, one-way for motorists, light segregation and bus stop islands.
Martin Lucas-Smith // 1 thread
Changes to car parking in the Kite are proposed.
Cycle parking is not being included.
Created by Dan Doherty // 0 threads
Very narrow cycle lane between University Road and Violet Road and Broadlands Road. Encourages very close passes when cycling in the lane (with 10cm of your handlebars), or aggressive impatient driving if you cycle outside of the lane. Additionally to cycle within this cycle lane it is necessary to cycle closer to the kerb than the recommended 50cm from kerb (http://www.cyclescheme.co.uk/community/how-to/road-positioning)
Lane markings are extremely faded. Lane contains several drains.
No cycle lane would be better than the current cycle lane.
Created by Shaun McDonald // 0 threads
The railings here probably should be removed. They promote faster motor vehicle driving, as drivers think it's safer as nothing will walk out in front of them.
Created by Robin Heydon // 1 thread
Planning application for flats near the Busway Cycleway
Created by Martinn // 0 threads
There is a set of bollard which have been placed that prevent cycling as a family, in order to reduce car journeys. Negotiation without manhandling the Bike and dismounting is impossible when riding a Tandem, and requires even more effort when a Tag -along is connected. Can these obstructions be removed please
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Broken headlight glass from a couple cars has been there since 8th August
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Shaun McDonald // 1 thread
Would it be possible to make the full length of Marchmont Street two way for cycling? The northern half doesn't seem to be now.
Created by Shaun McDonald // 0 threads
It's horrible to cycle along Old Street due to the number of cars/taxis/minicabs parked in the cycle lane. I usually find this a lot worse in the evening.
Created by Shaun McDonald // 0 threads
The toucan crossing for cyclists avoiding Old Street Junction are very slow to change for pedestrians and cyclists. Often people get fed up waiting and then dart across in a gap. Or once there is a gap, it takes until cars start appearing before they change.
If TfL is seriously interested in encouraging walking and cycling they need to change the timing of these lights so that they don't take forever to change.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by WilliamNB // 1 thread
On Royal Parade, when traveling in an easterly direction, shortly before the pedestrian lights by the Theatre Royal there is a poorly repaired trench across the road.
In lane 2, the surface is reasonable, but in lane 1 the tar has shifted to create a severe and unmarked speed hump. This is dangerous to cyclists.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by SallyEva // 2 threads
Mina Road would be no entry, apart from cyclists, from the junction with Ivy Church Lane. This will prevent northbound traffic entering from Mina Road onto B203 Dunton Road, to prevent stopping on the hatch markings at the junction with the A2 Old Kent Road. This movement can cause congestion and a road safety risk to all users.
Motor vehicles would not be able to use Bagshot Street and Mina Road for access onto the A2 Old Kent Road. The scheme would improve conditions and safety for local residents and cyclists. The reduced amount of traffic will create a safer environment.
Road users who normally would use Mina Road to access the A2 Old Kent Road would need to use Bagshot Street, Albany Road and Shorncliffe Road. The parking and loading bays on the northern side section of Mina Road would remain unchanged.
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Anon // 1 thread
Wandsworth Council in TMO 1644 propose removing the contra-flow segregated cycle track at the eastern end of Putney Embankment to allow a hoarding to be built around the Thames Tideway tunnel construction site. The track will be re-opened when the work is complete, but this could take at least a year. It is proposed that eastbound cyclists join the Upper Richmond road by the Dukes Head pub and then continue on this road. Wandsworth Cycling Campaign objected to this on the grounds that the Upper Richmond Road is extremely heavily trafficked and the proposed diversion involved cycling past a row pf parking bays . This would be very difficult and hazardous for the mix of cyclists using the Thames Path of which this forms part. We asked that the parking bays be temporarily removed and replaced by a 1.5 to 2 m cycle lane separated from the motor traffic by wands or similar. For west-bound cyclists using the narrow lane left on Putney Embankment past the work site, we asked for the installation of 'Do not overtake cyclists' signs.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Gipsy Hill // 2 threads
Introduction:
Quietway7 links a cycle route from Elephant & Castle (E&C) with Crystal Palace, and was routed by TfL to be via Dulwich Village, West Norwood (Thurlow Park Road), Gipsy Hill and then Crystal Palace (via Farquhar Road).
The route from E&C southbound is in Southwark (to Dulwich) then is in Lambeth (Turney Road, Rosendale Road/Thurlow Park Road, Hamilton Road, to Gipsy Hill), then goes back into Southwark (from Gipsy Hill to Crystal Palace). Southwark had their part of the quietway consultation approved.
Lambeth delayed their decision to June 2017, and was then subsequently “called in” as there was widespread concerns from both the local community and cycling groups for parts of the route. Cycling groups unanimously objected to the proposed design along Gipsy Hill by: Southwark Cyclists, Lambeth Cyclists and Wheels for Wellbeing. 70% of respondents objected to the the design on Gipsy Hill. Gipsy Hill is a busy Local Distributor Road and bus route. Gipsy Hill has “insufficient road width” for a segregated track. The original proposed design meant motor vehicles “will encroach on the advisory cycle lane” to allow oncoming motor vehicles to pass.
Gipsy Hill Options:
There are alterative options to avoid Gipsy Hill. Southwark Cyclists have supported the design option to follow LCN23 downhill all the way along Dulwich Wood Avenue and then using the other side of Long Meadow (so not using Gipsy Hill), with a new track behind the bus stop.
See navy dashed line on sketch attached (mauve was the proposed Q7 design, red is LCN23)
This design is quieter and safer than using Gipsy Hill, and avoids the proposed dangerous junction Gipsy Hill/ Dulwich Wood Avenue, near the rail station. This integrated design also allows greatest cycle access to local amenities, schools, shops, and parks in Dulwich, West Dulwich and West Norwood. There is interest and outline support from Southwark to explore this option.
Next Steps:
Lambeth are now actively progressing engagement and revised designs for their part of the route, with a new consultation process due in September. There is potential for an improved option at Gipsy Hill, but this is likely to need new additional funding from TfL.
Suggested, to let local Gipsy Hill Ward Cllrs (Lambeth) and College Ward Cllrs (Southwark) and local cycling groups know your views.
Background:
Lambeth proposal that was called-in, see reports:
- Quietway 7 - Elephand Castle to Crystal Palace - Decision Report – 12 June 2017
- Appendix B - Quietway 7 - details designs (Gipsy Hill pages: 23, 46-49)
http://www.cpneighbours.org/gipsyhillquietway/
Thurlow Park Ward Cllr updates:
http://thurlowparklabour.org/post/162548844962/quietways-engagement-next-steps
TfL Quietway 7 Programme (Elephant & Castle to Crystal Palace) - Proposed changes in Lambeth - West Dulwich area
https://consultations.tfl.gov.uk/cycling/lambeth-q7-wd/
LCN23 Map:
https://www.openstreetmap.org/relation/2707#map=17/51.42643/-0.08336
What are Quietway?
London Cycling Design Standards, Chapter 1 (page 15):
Quietways “..are aimed at new cyclists who want a safe, unthreatening experience.” The key principles for Quietways include:
o Routes should be on the quietest available roads consistent with directness;
o Routes should be as straight and direct as possible;
o where they have to join busier roads, or pass through busy, complicated junctions, segregation must be provided;
http://content.tfl.gov.uk/lcds-chapter1-designrequirements.pdf
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)