Poor surface on path
Path reported to be poorly surfaced and in need of resurfacing.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Chris Lowe // 0 threads
Path reported to be poorly surfaced and in need of resurfacing.
Created by DavidTheScientist // 1 thread
While some painted "cycle lane" does exist northbound, there is woefully little provision for cyclists considering the huge number that use this section of road each day, a large number of whom are those who work at the General Hospital and other nearby health centres. Southbound cyclists have no real provision of space at all, save a graduated stopline, where cars turning right often try to pass right-turning cycles on the inside. Dale road itself is extremely narrow by winchester road, with almost no pavement space for pedestrians.
Cyclists heading northbound on Winchester road must beat traffic off the line at Dale road to get to the painted centre of Winchester road. North of the traffic light at The Range, the cycle lane is almost non-existent, placing cyclists between 2 lanes of heavy traffic, and cyclists have to stop and wait in this dangerous area in order to turn right onto Wilton road. Furthermore, the road surface, especially at this part of Winchester road, is currently deplorable.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Eric Booth // 1 thread
Another pinch point issue being installed on Whiteladfies Rd as part of the St. John’s Primary School Expansion which links the school in Worrall Road to the new site at the old police station at Lower Redland Road. Looks bad at the moment as there's just the buildout but signals will follow.
BCC Engineer states:
"In terms of specific cycle facilities we are making a number of improvement to the area:
Adding a 1.5 metre uphill cycle lane on Whiteladies Road near the Grove Road area (existing signalised crossing is to be removed).
Adding a 1.5m uphill red surfaced cycle lane (without markings) through the crossing on Whiteladies Road near Lower Redland Road.
Adding a continuous contra-flow cycle lane through the 2 one-way sections of Lower Redland Road (which was requested by cyclists in the area).
Created by Hester Wells // 0 threads
Temporary traffic lights for building works between High Cross and Charles Babbage Road.
I have received the following from our building facilities manager as these lights affect access to our building, and two others.
"1. With effect from Monday 22 July there will be 3-way traffic lights positioned between the existing Charles Babbage Road and new CBR. This will last for 1 week. The lights will be installed on Friday ready for operation on Monday. These lights will have an operator to monitor traffic flow during peak periods (8.30am – 9.30am and 4.30pm to 5.30pm). Outside of these times the lights will operate on sensor detection for queued vehicles to avoid unnecessary queuing, and will automatically sequence between the roads when no traffic is present. Unfortunately the lights will not detect and activate for cyclists and cyclists will need to wait for the lights to operate on the normal sequenced rotation.
2. Following the initial works and as work progresses along CBR, the traffic management will become 2 way light operation along the High Cross Access Road the CBR and this is expected to commence from Monday 29 July for a further 2 weeks.
3. During the above the New CBR and Access Road to Schlumberger are being prepared and tarmacked – kerbs are being installed etc. Surfacing is to be complete by 12 August ready to opened for use by all to access via the New CBR after 12th August.
4. Also after 12 August works will commence on finalising the junction at AVEVA/New Data Centre access and this will have 3 way traffic management and is expected to take 3 weeks.
5. Finally the access road into site via High Cross will close from week commence 19 August and this will be for approximately 7 weeks. This closure will be fully diversion signed from Madingley Road and around the site with diversion management (sighs) taking us via JJ Thompson Road and round to AVEVA from there. However there will be a trial closure of the High Cross Road entrance on the Thursday/Friday 15th & 16th August prior to the work starting on 19th, just to ensure all the signage is correct and easily followed. "
I am interpreting this as at least 6 weeks of temporary traffic lights which will not detect people on bikes.
I suspect cycle detection was only mentioned because I had specifically asked this question when the issue of temporary traffic lights first came up.
I have sent a message back to our facilities manager saying that I don't think this is acceptable as:
1) Cycle usage is nearly as high has car usage here in summer
2) I also see people using this as a through-route for Coton
3) We are on a side road off a through-route for buses, so I suspect the lights on their normal sequence will not be at all favourable for a person on a bike trying to get out, as the normal sequence will not want to disrupt bus flow too much.
4) I fear that the complete lack of provision will lead to some people breaking the rules, which could be dangerous.
However, she is merely relaying these details to us and is not responsible for it. She can contact the site project managers about any issues, which I hope she will do.
Any other ideas?
Created by christhebull // 0 threads
Heading westbound along Bridge Road towards the junction with Rownham Hill, one sees a narrow (90 cm wide) cycle lane leading to an ASL (lacking the appropriate markings), however, the main issue with this junction is the time given to cyclists heading across Rownham Hill into Ashton Court Estate. A slow cyclist who passes the stop line just after the signals turn amber will struggle (uphill) to cross towards the gatehouse before traffic coming up Rownham Hill gets a green light. As cyclists will have previously navigated the debacle that exists on both sides of the Suspension Bridge, this is hardly a welcoming introduction to what is actually a very nice estate to ride around.
Created by Andrea // 3 threads
In Museum Street and Upper Brook Street/Northgate Street it is very dangerous to cycle. Both roads are very narrow, have lots of buses pass through and there are contraflow cycle paths. On those you are very close to the buses (both directions) even if you wait on the pavements to let them through because you are worried about accidents. Can cyclepaths go through Elm Street, Tower Street or Tower Rampart instead?
Created by christhebull // 1 thread
South Gloucestershire have released plans of their proposed changes to their section of the A38 Gloucester Road. Several locations will be altered, namely:
Northville Road Roundabout
Filton Roundabout
A38 / Filton Avenue Junction
A38 Patchway Slips
The proposals can be viewed here https://consultations.southglos.gov.uk/consult.ti/A38_Cycle_Safety_2013/consultationHome and the consultation closes on the 29th July.
What is being proposed is, in my mind, inadequate, as the modifications are mostly tinkering with junctions, with cyclists still expected to use the mainline carriageway (which has a 40 mph speed limit north of the Air Balloon). This route forms part of Bristol Cycling Campaign's proposed "cycle freeways" and the proposals are nowhere near adequate for this road to be called such - so make your voice known at consultation!
Created by Ian Jackson // 0 threads
DUPLICATE ISSUE OF
http://www.cyclescape.org/issues/74-20mph-limits-in-cambridge
- PLEASE RESPOND THERE.
---
The Cambridge City Council's consultation on 20mph speed limits in North Cambridge closes today.
Here is the URL:
https://www.cambridge.gov.uk/20mph-speed-limit
If you haven't already done this survey, please do so.
(I have said that I agree with all the proposals, and indeed that they don't go far enough.)
Created by David Earl // 1 thread
Cambridgeshire County Council proposes traffic lights on Sawston bypass where NCN11 and the northern link to Sawston meets it. However, the plan is for cyclists to have to cross three separate sets of lights.
Created by Ian Jackson // 1 thread
There are "Cyclists dismount and use footway" signs at some roadworks on Kings Hedges Road SE-bound outside the Post Office near the Golden Hind.
I spoke to a worker who said the sign had been put in by their traffic management team, after getting permission from Cambridgeshire County Council.
I have phoned the County who say one of their traffic management people will phone me back.
I have also made this FOI request:
https://www.whatdotheyknow.com/request/roadworks_traffic_management_cor
Created by David Earl // 1 thread
Ida Darwin Hospital, Fulbourn Old Drift, Fulbourn, Cambridge, Cambridgeshire, CB21 5EE
Approval is sought for a. A development brief for the Fulbourn and Ida Darwin hospital sites and b. Outline Planning Permission for the redevelopment of the Ida Darwin Hospital site with up to 180 dwellings (C3) including affordable housing, a 70 unit Extra Care facility (C2) with access and associated works, open space and landscaping, following the demolition of existing buildings on site.
Created by ambrosen // 0 threads
Turning right, eastbound from Weston Road to Victoria Park the cycle path (marked as a footpath on the map above, but signed in roundels once in the park) is not marked at all from the road.
A pointer showing the existence of the path would be great. Even better would be a turn refuge from the centre of Weston Road.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Chris Ruse // 2 threads
I think I’m correct in saying that several months ago the kerb at the junction of Strawberry Vale and Waldegrave Road was realigned with the result that the cycle lane that had previously continued up to the stop line was cut short at the point where the kerb was realigned. Photo 1341 -1 shows this quite clearly. I cycle along this road fairly frequently and had recognised this as a dangerous point for a cyclist but did nothing about it other than taking care. On Monday however my alertness paid off as a large lorry overtook me about 8 – 9 metres back from the stop line. Had I not braked hard it would have undoubtedly have hit me. The alignment of the kerb creates a pinch point which a cyclist is funnelled into without any warning.
It appears to me that the needs of cyclists have been ignored in the redesign of this junction and that a road safety hazard has been created.
Created by Shaun McDonald // 1 thread
As a cyclist it's pretty horrible to cycle along Clerkenwell Road due to it being much narrower than it used to be, or could be due to the ultra wide pavements.
West bound there is a bit of 2 lane queuing preventing cyclists getting past. Eastbound just before the lights the Island is in the way forcing cyclists to merge with motors.
Created by Simon Nuttall // 2 threads
Garden Walk is a two way street for all but the last few metres at it's junction with Victoria Road. At that end there is a cycle bypass to the no-entry. It's a bodge up that only transport planners understand.
http://www.cyclestreets.net/location/10161/
I've experienced it myself, but a resident of the street tells me of her frequent problems with aggressive oncoming traffic (mostly van drivers) that barge at her as she rides up the road. When she tries to point out how the street works they don't listen and challenge her knowledge because of her french accent.
I've suggested these two signage solutions...
Blue signs...
http://www.cyclestreets.net/location/44690/
Big bicycle markings on the road...
http://www.cyclestreets.net/location/37295/
Martin Lucas-Smith // 1 thread
This new development is almost finished, but there is no obvious sign of cycle parking on the frontage - which I believe may be for shops - yet (and the back area is obviously not publicly accessible at the moment).
Do we know what cycle parking is planned here?
Martin Lucas-Smith // 1 thread
There have been several reports of a surfacing problem here.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
Created by Jim Chisholm // 3 threads
AstraZeneca have announced they will by 2016 move to the Biomedical Campus on the Addenbrooke's site. We need to engage with them.
The service entrance to the motorway services now has priority over the shared use path which runs parallel to the main road.
I have contacted both Hampshire County Council and Test Valley Borough Council about this change in priorities, but neither has responded beyond a cursory "we have received your email".
This is yet another example of through traffic being de-prioritised simply because it is on a cycle (or shared) path, rather than on a road.
Southampton Cycling Campaign has received many reports of local cyclists having accidents on the cycle path outside the Dominos Pizza outlet at the southern end of The Avenue.
A recent incident was reported in the Southampton Echo, http://www.dailyecho.co.uk/news/10475081.Cyclist_hurt_in_road_crash/
Martin Lucas-Smith // 2 threads
The University Arms (next to the entrance to Parker's Piece) is planning a new frontage.
This could have cycle access issues.
Also this would be a good opportunity to push for a contraflow from Hobbs Pavilion to Regent Street.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
The cycle lane on Billacombe Road is unusable due to car parking in it.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.