S/2060/13/FL Closure of level crossing, replacement with footbridge
Network Rail planning application for replacement of level crossing with footbridge
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Richard Moss // 1 thread
Network Rail planning application for replacement of level crossing with footbridge
Created by Paul L // 1 thread
Between the practically traffic free road through Bushy Park and the quiet roads of Hampton is the busy High Street. This could be a route for all cyclists by segregation as a two-way widened shared footway and conversion of an existing pelican to a toucan crossing.
Created by Paul L // 0 threads
Burtons road has been part of the borough cycle network usually acting as a quiet parallel to Queens Rd. Unfortunately growth of traffic has led to it being a rat-run at peak times despite numerous road humps. As parking leaves space for only one vehicle this makes it unpleasant to cycle.
Created by Gareth Evans // 0 threads
This roadworks is very extensive. There are many cones. However this lorry just blocks not only the lane but the sight lines just next to St Kilda avenue
Created by David Earl // 2 threads
The new flats at the fire station seem to be attracting delivery vehicles to unload in the cycle lane at the west end of East Road. The wide lane here is separated from the road by cross hatching. Should we ask for physical segregation on this short length, e.g armadillos. Would delivery vehicles still bump over them to park are make matters worse to get round them? Would a barrier be effective?
Created by vlejd // 2 threads
The marked lengths of the path has several breaking points (legally dismounting is obligatory), but for no good reason. Needs some paving and marking. Preferably convert to 2-way, there's plenty of space.
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by aSemy // 1 thread
The Freedom To Ride Manifesto, a petition run by Bristol Cycling Campaign, calls for a comprehensive cycle network across Bristol. As part of this I have sketched a plan to pedestrianise Bristol's Clifton Triangle and kick start a discussion.
My aims were
1) Pedestrianise the road from Victoria Rooms to Wills Memorial Building
2) Using ideas seen in New York, plan for a minimum of work, meaning this can be done cheaply and removed if a trial doesn't work.
3) Provide a decent pedestrian and cycle through routes, redressing the balance
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by Jenine // 1 thread
We need some cycle racks outside the Asda store here. I've asked Asda but they say it's up to the Council.
Created by Shaun McDonald // 1 thread
This is a signed cycle route from Capel St Mary into Ipswich. It used to be the A12 into Ipswich. Now it's a 50 mph dual carriageway, with little traffic due to minimal access. It would be easy to bring it down to one lane each way, and give the other lane over to cyclists with safe segregation and a wide path. Also on the south end a better link and also signage southbound to Capel St Mary and other places further south is needed.
The road between Hogg End Lane and Three Cherry Trees Lane is closed to all traffic. It should be opened to cyclists to provide a convenient route to the Maylands industrial estate and NE Hemel from the Redbourn Road.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by BrianInBeeston // 1 thread
There have been tacks thrown on the path in this area which cause punctures. Residents have put up signs saying 'no cycling'. This is a defacto bridleway & has been used as such as long as anyone can remember. A local resident has made a witness statement to this effect which is being dealt with by Nottinghamshire County Council rights of way officers.
Created by Claydon & Whitton Parish Council // 0 threads
Cyclists using footpath between Newell Rise & Church Lane Claydon, past bus stop. Potentially dangerous for pedestrians particularly waiting for buses.
Created by Charlie Halliday // 0 threads
Surrey County Council have started a consultation for their proposed cycling strategy.
This issue covers the aspects related to the bordering borough of Rushmoor.
Consultation finishes on 1 November 2103
Route along St Albans Road providing a direct link between St Albans and Sandridge. This would connect to the footpath/bridleway conversion from Sandridge to No-Man's land and to a potential route from No-man's land to Wheathampstead providing a route from St Albans to Wheathampstead.
Created by mike1727 // 0 threads
Route to link the Northern end of the converted foothpath running from Sandridge to No-Mans's land via Heartwood to Wheathampstead.
This is on the Hertfordshire County Council's rights of way improvement scheme.
Created by Andrew Clegg // 2 threads
The garage at the end of radcliffe road uses the end of this road as a car storage area, which often results in the access onto the cyclepath being obstructed.
Created by Andrew Clegg // 1 thread
The excellent cyclepath alongside St Mary's stadium joins onto Melbourne Street via an awkward and narrow gap which is often blocked by cars. This is annoying for regular users as well as making it harder for people to follow the NCN23.
Created by Andrew Woodward // 0 threads
There is room for more bike parking here - to encourage people to stop fly parking on the railings of the bridge.
Created by Andrew Woodward // 0 threads
Cycling north down church rd; and wanting to go east on the A316, cyclists can avoid Richmond Circus by makin a right turn onto St. Johns Rd. However, this right turn is on a bend and there are frequently queues of north bound traffic that obscure the view of oncoming vehicles until you reach the bend - see streetview here http://goo.gl/maps/dvlKe ; coupled with a downhill gradient cyclists are tempted to cut across Church Rd at this point at speed despite poor visibility.
Reversing the direction of the Larkfield Rd / St Johns Rd one way system would allow northbound cyclists to make a right turn into Larkfield rd to cycle round and pick up the A316 - with much better view of oncoming traffic. Coming the other way, westbound cyclists heading for Richmond Station could then use St Johns Road to get to Richmond Station - which is slightly shorter and easier route.
Created by Andrew Woodward // 0 threads
Sandpits Rd Ham is closed to through traffic, creating an opportunity for a quiet cycling route. However the closure has been made with a bench and a kerb that would obstruct anyone wanting to cycle between Sandpits Rd and the rest of Ham. This could easily be replaced by bollards.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Created by Andrew Woodward // 1 thread
This short stretch of cycletrack links Leybourne Park to Cumberland Rd - its very narrow and has street furniture in the path, making pretty much unusable.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Andrew Woodward // 1 thread
Travelling south from North Road to Manor Road; you have to negotiate Manor Circus - the only crossing is a zebra crossing; followed by narrow pavement; which forces a dismount. Could the southern pavement be widened by extending it out over the former gasworks site?
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Jack Thurston // 0 threads
Cycle route 42 along Castle Street requires cyclists to make an absurd off-road detour around the castle grounds and through an industrial estate to rejoin the routes east of the town centre at Holywell Road.
This could be avoided if cycling were allowed in a south-west to north-east direction on Lower Castle Street. Ideally this narrow street should be a walking/cycling only street, or a cycling contraflow could be introduced, though the narrowness of the street makes this a second-best solution.
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Charlie Halliday // 1 thread
Notices have recently been put up by the Blackwater Valley Countryside Partnership on the section of the Blackwater Valley Path which passes through Hollybush Lakes near North Camp station.
Although there is a legal agreement to use this stretch as a footpath, there has never been one to permit cycling there and the owner is quite within his rights.
This is not a historic route, there is no sign of it on my 1956 OS map.
The Blackwater Valley Countryside Partnership is trying to resolve this but the cycling route may have to be diverted.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Over the past couple of years of regularly cycling between Waterbeach and Cambridge on NCN11 I have noticed that the path between Waterbeach and Baits Bite Lock is in really bad repair and is getting gradually worse. I have been in touch with the council to ask them to repair it, and they told me that as far as they are concerned the path is only a footpath, and they have no obligation to maintain it to a standard suitable for bikes. Sustrans tells me they have no responsibility for maintaining that section of the route, and that the council should be responsible for it.
It seems absurd to allow the path to fall into total disrepair, but at the moment it doesn't seem like anyone recognises any obligation for its upkeep.
I am happy to go out occasionally with some secateurs and chop off the more annoying bits of greenery, but the path needs resurfacing and that feels a bit beyond me!
Does anyone have any experience with this sort of problem? Have they come across it on other sections of the NCN?
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Create an off-road route along the railway line out to the east, which could ultimately form a route out to Collin.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Matthew Phillips // 1 thread
If you follow NCN 7/14/70 through Durham from west to east, then after crossing Pennyferry bridge and proceeding south towards Fleshergate you find a no entry sign which adds "Cyclists dismount". There ought to be a contraflow cycle lane on this one way street. Round the corner just further on there is a contraflow lane!
Update, 3rd May 2016.
The road layout has been changed in conjunction with the new office blocks at Freeman's Reach. The road was previously wide enough to be two-way, apart from the problem of the bays for coaches to offload tourists. Now the pavement has been extended to enclose the bays, and the main carriageway is much narrower. What had been ordinary footway further along is now a ramp up to the office doors, with the footway now taking the place of part of the previous carriageway. There is a shared-use sign on the pavement, if you are travelling north, but "cyclists give way to pedestrians" has been added, as though they are aware that the space is not really wide enough. On the reverse of the sign is a "cyclists dismount" sign again, so there is still no means of turning south round the corner to join the short contraflow lane.
By the end of Pennyferry Bridge there is now a little shared use sign indicating that it is permissible to cycle on the new walkway round the river side of the office blocks. Mixing bikes and pedestrians along this route will probably be unpopular.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Starting a thread about this application here so we can continue on from the previous planning list discussion.