poor visibility of traffic
blind bends and high hedges make this junction dangerous as you cannot see traffic
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Andrea // 0 threads
blind bends and high hedges make this junction dangerous as you cannot see traffic
Created by Andrea // 0 threads
This junction needs to improved for cyclists. It is currently dangerous. Please discuss this and give ideas on how to improve it best
Created by Andrea // 0 threads
Woodbridge Road needs a dedicated cycleway, with contraflow when going down towards town. Currently you haven't got the opportunity to use Woodbridge Road as a quick route into town from e.g. Ipswich Hospital as you cannot go all the way.
Created by Andrea // 0 threads
a viable connection for NCN 1 through the Common is needed. Currently we have to go a very awkward route, mixing with traffic
Created by Andrea // 0 threads
We need a cycle route connection alongside this part of Woodbridge Road by Rushmere Common.
Created by Shaun McDonald // 2 threads
Comments at Cycle Ipswich meeting:
* Westbound cycling is confusing as you currently technically need to ride on the pavement.
* Are vehicles really needed along here?
Letter for TfL, copied to RCC, by local resident:
I am a resident of the Dover House Estate area and regularly use the crossroads of the Upper Richmond Road (A206) with Roehampton Lane and Rocks Lane (A306) as pedestrian, cyclist and/or car driver. There are three major issues with this junction which need to be addressed.
The first is the pedestrian crossings, which are poorly timed/synchronised and inadequate. There is a significant volume of pedestrian traffic to and from the station and bus stops and the university, yet to cross the road safely using the crossings can easily add 5 mins to the journey. This is mainly as there are push button crossings on only two of the four arms of the junction, a third having provision to cross which requires too much calculated risk (and insufficient island space considering the probability of standing in the middle for some time), and the fourth having no sensible provision at all. There is a high proportion of children using the crossing - with buggies, scooters, bikes, and on the south west corner insufficient pavement space for the volume of pedestrian traffic at peak times. The timing/synchronisation of the green men requires pedestrians to stand in the middle islands for an overly long period of time - during which time they cannot help but notice the very high level of exhaust fumes. Given that the only traffic flowing south along the A306 and allowed to turn right on to the A205 is buses and cycles, the extended wait for the green man in the middle of the A205 to head south seems unnecessary. Heading north there is a similarly unnecessary wait for the green man, as motorised traffic heading east along the A205 is also at a red light while that heading north on the A306 is on green.
The second major problem is the filter lane for motorists turning right off the A205 into the A306 to head north. This only operates at peak times, leaving motorists with a choice between being stuck in the middle waiting for a second round of lights or skipping through an amber or red light (frequently even though they were first in the queue). There is simply too much traffic heading east to not have the filter light operating for a greater part of the day. Even when the filter light is in operation it is for such an insufficiently short period that unless you are among the first three cars you are almost certainly going to wait for at least two rounds of lights - at peak times I have waited for the fifth round of lights. This in turn causes a tail back and high levels of air pollution.
The third major problem is the lack of cycle ways. There is a large number of cyclists on both these major roads but for something like a 500m radius around this junction there is no cycle way despite it bring both possible and dangerous without. The temporary narrowing of Barnes Station bridge only exacerbates the situation and since being put there some years ago seems to have been forgotten. This area is a real hole in the cycle way network and a blackspot considering the attractive options in every direction coming into/out of it.
The junction is an accident just waiting to happen on many levels. I would be grateful if you could me a detailed response to each of the points I raise with where at all possible a timetable for when they can each be expected to be resolved.
Created by Joe Adam // 4 threads
Arbury Road is proposed to be upgraded under the City Deal scheme.
In 2014 there was a consultation running on improving the Arbury Road near St Laurence Primary School.
Created by fishter // 2 threads
At the bottom of the hill there is a "chicane" for motor vehicles to negotiate. Northbound traffic must give priority to southbound traffic.
The chicane is formed by an island on the northbound side of the road. This island has a bypass to the left to allow cyclists to proceed despite oncoming traffic.
After a recent resurfacing of the road the markings for the cycle lane were omitted (see picture). This means that cyclists should now give priority to southbound traffic as the markings indicate they should not use the bypass.
Created by Jim Chisholm // 4 threads
There is now an Area Action Plan for the Northern Fringe East
This is a huge area, and if the Anglia Water Works site is also redeveloped it brings big oportunities and associated risks
The Campaign needs to be involved
Created by MJR // 1 thread
There's an OK cycleway alongside the Bawsey Drain from the Loke Road Junction but the link from the edge of the town centre 20mph zone isn't very good. The section between North Street and Loke Road involves negotiating your way across the multiple lanes of John Kennedy Road which is the northern approach to the town, or illegally using the narrow footway as many people do.
This section is crying out for one of the three or four lanes to be given back to cycling and walking and the 20mph zone to be extended to the north end of North Street.
I see Addenbrooke's have found a solution to all the bikes locked to the railings around by the front entrance.
Not, as you might hope, by providing more cycle parking, but by removing the railings.
I wandered around yesterday. There were 91 bikes parked outside of cycle rack spaces & 6 spaces free.
should be interesting for anyone who usually cant park in a cycle space over the next few days
:(
Richard
A fast road - dual carriageway in both directioms and with 6 lanes at one end. Speed limit of 30mph rarely respected - except in rushhour when speeds can be down to zero mph at times.
Cyclists can not cycle safely along either side of the road. Cars, lorries, busses etc are travelling too fast, with drivers jostling to change lanes, overtake busses or 'beat the lights'. The cyclists I see are on the pavement & I don't blame them - frankly the layout is not fit for cyclists. Fortunately the pavement is wide, there are few pedestrians and there is ample room for considerate cyclists to travel this way. More cyclists would use this roue if it was safer & if it joined up properly with Danebury Avenue & the other cycle routes in the area.
With the wide pavements & carriageway there is room for segregated cycle, pedestrian and motor vehicle routes. There may even be room for 'floating' bus stops. A zebra or Toucan crossing on the road would also reduce average speeds.
There are three strips of cobbles across NCN11 here, or maybe they're setts. It seems bad to have these on a cycle route because they are unpleasant for cycling and especially bad to put them so near a junction because rider attention should be on the junction and other road users, rather than man-made problems with the road surface.
Created by Cllr Ian Manning // 1 thread
This pinch point has always been an issue for anyone cycling North along Green End Road. The pavement suddenly becomes wider at the roundabout, forcing cyclists into conflict with cars.
Created by John Chamberlain // 3 threads
Camden are consulting on their plans to extend the Royal College Street cycle tracks to the south, down Pancras Road towards Kings Cross. Unfortunately, the plans for the junctions at St Pancras and contra-flow up Midland Road are not ready yet, so it will remain difficult to get to and from the south and east until these are finalised, but this is another link in the planned North-South route through the borough as part of the London Cycle Grid.
Details of the proposals can be found on Camden’s website at:
https://consultations.wearecamden.org/culture-environment/pancrasroad
For cyclists, the main proposals are as follows:
- Protected cycle lanes from Royal College Street to just south of Chenies Place.
- Removal of two bus-stops to make the cycle lanes continuous
- North-bound bus-stop converted to 'island' style.
- Southbound bus-stop uses Royal College Street style due to lack of road width.
- Additional protection for cyclists crossing Crowndale Road from Royal College Street.
You can reply to the consultation via Camden's website. Please also add your comments to the threads on this issue, or by email to john AT camdencyclists.org.uk . We have already had suggestions for improvements to the lane behind the bus-stop at Chenies Place. We will be saying that cyclists heading north to Royal College Street should use Goldington Crescent to avoid one set of traffic lights and the need to cross lanes. What else?
Our response needs to be in by 14th November so we'll take comments on board until the 7th.
Created by Al Storer // 1 thread
A lot of attention is given, especially by the council, to the radial routes. This is OK. But what about this key (partial) orbital?
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Martin Lucas-Smith // 1 thread
Bikes leaving the cul-de-sac, heading East, have to cross traffic twice. There is poor visibility and vehicles rat-run through the area.
With the North West Cambridge development coming forward, this problem will get worse in time.
The side roads that access the avenue are a danger to the users of the shared path. This is especially prevalent on the northbound side in the mornings. Cars seem to have two modes:
1) stationary avenue traffic - approach at speed and hit the anchors in time not to hit the queue
2) no queue on avenue - approach at speed hoping not to have to stop. Then go for it or again hit the anchors.
In both stopping cases this blocks the crossing for the cycle/pedestrian
Ideally there would be an advance giveaway line/colored tarmac to identify the possibility of crossing bikes/pedestrians
Created by David Earl // 0 threads
We (Cambridge Cycling Campaign) have received an invitation to this event: Commuting and Health – Research and Policy Forum
Wednesday 21 January 2015, 10.00am – 2.00pm
http://www.cedar.iph.cam.ac.uk/commuting-health-forum/
Free, but registration required.
"The way we travel can affect our health and the health of people around us. In the Commuting and Health in Cambridge study funded by the National Institute for Health Research (NIHR), researchers have been following the travel and physical activity patterns of commuters since 2009, seeking to understand more about why people use different modes of transport and how this is related to physical activity, health and wellbeing. A key aim of the study has been to assess the impact of new transport infrastructure in the form of the Cambridgeshire Guided Busway, which opened in 2011 and provides dedicated traffic-free facilities for buses, cyclists and pedestrians."
Created by Shaun McDonald // 1 thread
There are 3 main problems with this cycle route which would be easy to rectify:
* This cycle track is only signed from the retail park side, with no signage from the residential end of this link.
* The surface is pretty poor along here, especially if you have some shopping in panniers.
* There is also a problem with a gate part of the way along, which could pose a problem for people with a trailer or cargo bikes.
Photos:
http://www.mapillary.com/map/im/BMxiiFHdjmrrL0iqIx8WTw
http://www.mapillary.com/map/im/8Y-kQQoHYp0Y_Zjn4dziJw
Created by Shaun McDonald // 1 thread
Overview
Working together with interested parties - including cycling, pedestrian and motorised road user organisations – we have reviewed the design of a number of key junctions identified as having road safety or other significant issues for cyclists and / or pedestrians.
This junction was identified as having a particular cycle safety problem. We have therefore developed proposals to improve safety at the junction, in particular for cyclists.
The responses to this consultation will help inform our decsion making as to whether we go ahead with the scheme as proposed or make changes to the scheme.
Why We Are Consulting
Our review of this junction has shown that there is a road safety issue for cyclists, in particular those travelling northbound along the A21.
Our proposals for this junction are designed to improve sight lines to make it easier for cyclists, motorists and pedestrians to see each other and hence improve junction safety. In addition the opportunity will be taken to improve the informal pedestrian crossings to make these more visible and easier to use.
Our proposed improvements include:
Amended A21 and Oakley Road junction layout to bring the junction closer to a right angle – this will improve sight lines
The cycle lane on A21 north bound (towards Bromley) will be widened to increase the separation of cyclists from other road users.
Revised informal pedestrian crossings will be provided across Oakley Road and across A21 Hastings Road. A central island will allow roads to be crossed in stages. Informal crossing points offer pedestrians a safe point to cross, with tactile pavement for those with visual impairments.
The right turn from Hastings Road to Church Road, which is not currently physically possible, will be specifically prohibited. The revised junction layout would make this a possible manoeuvre but it would conflict with right turning traffic into Oakley Road from the north and would not be a safe movement.
We are not changing any other aspects of the junction. Traffic will still only be able to turn left (north) towards Bromley from Oakley Road, while Church Road will remain one way eastbound, with changes to the kerb layout to deter illegal movements.
The map below illustrates our proposals.
You can have your say on our proposals by following the link at the bottom of the page.
Created by BrianInBeeston // 0 threads
Proposed route of NCN 15 from Trent bridge to Clifton, following the south bank of the river Trent. The idea under discussion is for the route to be temporarily signed by Sustrans volunteer rangers in the first instance. there are also plans to sign an NCN 15 to NCN6 link route via Wilford Toll, Birdcage walk, Lenton Lane, Abbey St. NCN15 from Clifton westwards to East Midlands parkway station can be signed once the A453 works are complete.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.