Media Strategy
Under this issue are assembled various initiatives relating to our work with the media, representation in the media, access to media etc
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by velocipedus@gmail.com // 9 threads
Under this issue are assembled various initiatives relating to our work with the media, representation in the media, access to media etc
Created by cobweb // 1 thread
59 en suite rooms, gym, 4 one bed flats proposed by Lucy Cavendish.
Created by Gregory Williams // 1 thread
Both ends of the new cycle path between George Roche Road and Stuppington Lane in Canterbury do not have properly dropped kerbs. This makes joining / leaving the cycle path dangerous. Properly dropped kerbs should be installed.
Additionally the visibility to the SW at the junction with Stuppington Lane is poor due to a hedge immediately adjacent to the junction. The sightline needs to be improved here, since road users approaching from the SW will not be able to see cyclists and pedestrians about to emerge from the path. Likewise cyclists and pedestrians turning into the path will not be able to see anybody else on the path that's approaching the junction.
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Matt Turner // 1 thread
Castle Street cycle lane is a contraflow cycle lane on a one way street in Sheffield. It has been here since March 1997 and allows cyclists enter the city centre from the network of cycle paths on the East, avoiding some big arterial routes with no cycling provision.
For the past 15 years this cycle lane has been plagued by Hackney Carriage drivers parking illegally on this cycle lane, blocking cyclists access and forcing them into oncoming traffic. This has been the case for over a decade.
There is a taxi rank on the pavement side of the cycle lane, taxis often fill up this rank and overflow, parking in the cycle lane, blocking the way for cyclists.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 1 thread
Motorised vehicles currently use the rat run through Milner Street to avoid the fraffic lights at Grove Lane/ St Helens St.
This is part of NCN 41 , any extra traffic passing through here detracts from the cycling experience and is negative for residents.
Cyclist comments are needed now !
Created by Kevin Ablitt // 1 thread
Total re-design of this important junction.
Very complicated junction with 4 routes entering/leaving .
Covers very large area.
Proposal is for one large oval to replace existing double roundabout.
The junction has an existing reported and unreported high level of vehicle/cyclist crash.
An ideal opportunity for Ipswich to have a radical design which protects the more vulnerable road users ?
Please post your opinion here.
Created by Kevin Ablitt // 0 threads
The straight through route at this roundabout seems to encourage people to assume priority and go against roundabout rules. This makes the r'bout particularly difficult for cyclists to negotiate safely.
This crash was luckily a minor one- http://www.eadt.co.uk/news/update_road_clear_after_collision_between_car_and_cyclist_in_ipswich_1_1738795
Created by WillC // 1 thread
Cycle lane marking is badly worn which means other road users cannot tell if it's really there or not - which is bad news for cyclists, and dangerous. needs urgent re-painting. Lodged with highways@leeds.gov.uk twice in last 2 years but no action taken.
Created by Shaun McDonald // 0 threads
When heading south along this track you miss a sign telling you to turn left, which means that you head straight on and potentially get confused and turn left to go back on yourself instead of going straight on and thus get lost.
Created by Shaun McDonald // 2 threads
When cycling west bound from Rope Walk into Eagle Street through the cycle filter (where cyclists are unaffected by the traffic signals except giving way to the traffic from the left), the width between the bollard and the kerb and the sudden left movement required make the travel through the junction more difficult especially when using bikes with trailers, cargo bikes. Ordinary bike users also find it difficult to use and will avoid it instead.
Created by LeedsCyclists // 0 threads
Consultation on proposals for Harrogate Road. Option 2 is better for cycling as it includes a Northbound cycle lane.
The consultation closes on 10 December so please vote now!
https://consult.leeds.gov.uk/leeds/KMS/elab.aspx?noip=1&CampaignId=460
Created by Gregory Williams // 0 threads
There are no cycle route signs at the junction of North Holmes Road with Havelock Street in Canterbury despite two advisory on-road cycle routes meeting at this point. Cycle route signs should be installed to allow people to more easily follow and discover Canterbury's cycle network.
Created by Gregory Williams // 1 thread
The cycle link between Brymore Road and Forrester Close, Canterbury has two sets of cycle barriers. These make it difficult to cycle and impossible to take a tandem cycle along the route. They also cause difficulties to people pushing prams and those in wheelchairs and using mobility scooters. The cycle barriers should be removed.
Created by Gregory Williams // 1 thread
Planning application CA//10/00295 to provide three warehousing units at Marshwood Close, Canterbury has been essentially complete for a number of months now. However the cycle parking provision detailed in the plans has not been installed. This cycle parking provision needs to be installed to offer people working and visiting these units a location to securely park their bikes.
Created by Gregory Williams // 0 threads
The cycle parking at the bus station end of Canterbury Lane is full and has several bicycles parked against the railings. This means that people don't have places to park their bicycles and either choose not to cycle or park their bikes where they may cause a hazard or appear unsightly to others.
The cycle parking at the side of Wilkinsons, nearing the Zoar Chapel, does have spare capacity, but is poorly used because it has a low level of passive surveillance. Some of these stands could potentially be moved towards the bus station end of Canterbury Lane to satisfy the demand there.
Created by Gregory Williams // 1 thread
The cycle parking near the loading area at Rose Lane, Canterbury is often full or near full. This means that people don't have places to park their bicycles and either choose not to cycle or park their bikes where they may cause a hazard or appear unsightly to others.
Created by Gregory Williams // 1 thread
The cycle parking at Tesco's Whitstable store is of poor quality and badly placed to be hidden behind a trolley park. This means that it is not particularly well used or discoverable and adversely affects cycle security.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the Clocktower Square area of Canterbury city centre. The photo shows that the existing cycle parking is completely full.
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by LeedsCyclists // 1 thread
Central Leeds is badly lacking cycle parking. Many locations have no cycle parking at all, or only a few token stands, which are often full. At the recent Cycle Consultation Forum, the Council asked for suggestions of locations that need cycle parking: send your suggestions to Mark Robinson at Leeds City Council.
Created by Shaun McDonald // 1 thread
Overview
Barclays Cycle Superhighways are cycle routes running between outer and central London. They provide new cycle lanes and other dedicated infrastructure so that cyclists can enjoy swift, direct, safer journeys around the city. We have developed plans for a new route and would like to hear your views.
What are we consulting on?
We’re proposing to introduce a new cycle route between New Cross Gate and Victoria. Barclays Cycle Superhighway Route 5 (CS5) would run via Peckham, Camberwell, Kennington and Vauxhall.
Proposed road layout changes
The new route would bring substantial changes to the road layout to improve safety for cyclists, including:
More space for cyclists and buses, through reallocation of road space
New mandatory cycle lanes, all at least 1.5 metres wide
Improvements for cyclists at 52 junctions, including new Advanced Stop Lines, cycle feeder lanes, and speed reduction measures
An innovative cycle ‘early-start’ facility at Vauxhall Bridge Road/Millbank to help cyclists get ahead of traffic
Banning some turns for cars and lorries to reduce conflict with cyclists
Extended 20mph speed limit in New Cross
Other benefits
Over 3,000 new cycle parking spaces along the route
Cycle safety checks
Free cycle training
Industry-recognised safety training for drivers of large goods vehicles
Proposed route
Click here to download a larger map of Barclays Cycle Superhighway Route 5.
How do I view the proposals and have my say?
Detailed proposals
Find out more about the proposals for each section of the new route by clicking the links below.
► Section 1 – Vauxhall Bridge Road north (Neathouse Place to Charlwood Street)
► Section 2 –Vauxhall Bridge Road south (Charlwood Street to Millbank)
► Section 3 – Vauxhall Bridge Road / Millbank junction
► Section 4 – Vauxhall Bridge
► Section 5 – Vauxhall Gyratory
► Section 6 – Kennington Oval / Harleyford Street
► Section 7 – Oval Junction
► Section 8 – Camberwell New Road
► Section 9 – Camberwell Green (consultation in January 2013)
► Section 10 – Peckham Road west (Benhill Road to Southampton Way)
► Section 11 – Peckham Road east (Lyndhurst Way to Peckham Bus Station)
► Section 12 – Peckham High Street / Queen's Road west (Peckham Bus Station to Carlton Grove )
► Section 13 – Queen's Road (Carlton Grove to Pomeroy Street)
► Section 14 – Queen's Road east (Pomeroy Street to Pepys Road)
► Section 15 - New Cross (and other local cycling improvements in Lewisham)
To request a paper copy of our proposals, please email barclayscyclesuperhighways@tfl.gov.uk
Public Exhibitions
You can also view the plans at our public exhibitions. Dates and locations are given below.
Saturday 8 December 11:00-15:00, Peckham Library, SE15 5JR (view map)
Tuesday 11 December 15:00-19:00, Oval House Theatre café, SE11 5SW (view map)
Wednesday 12 December 15:00-19:00, Parnell House, SW1V 1LW (view map)
Created by Rohan Wilson // 1 thread
Cambridge Science Park though in the northern edge of the city, is administratively in South Cambs.
I propose to attach a thread relating to a new planning application for the Bard Pharma site, northeast corner.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 0 threads
The railway bridge over Ockford Ridge results in a narrowing, just as the road bends. The footway here is left narrow, sightlines are poor and the surface is in a poor state.
this old fashioned barrier on a major cycleway needs a rethink
Created by North Devon Cycling Forum // 0 threads
This sign in "Newport Life and Cycle" area has been wrong aligned for several months; encourages vandalism and feeling of neglect in area
Created by Simon Still // 2 threads
For pedestrians
Relocate the crossing at the junction. At the moment pedestrians on the eastern side of Streatham High Road cannot see oncoming traffic around the bend and vehicles cannot see people crossing. By relocating the crossing that is currently north of the junction on Streatham High Road to where demand is higher and making it a straight-across signal-controlled crossing we can make it safer for all road users. This relocated crossing would replace the existing unsignalised crossing on the southern arm of the junction where there is significantly lower demand
Create a raised imprint block-paved effect crossing on Gleneldon Road indicating to drivers that pedestrians are likely to be crossing making it easier and safer for people approaching the relocated crossing.
For cyclists
Cycling would be permitted in the proposed bus lane on Tooting Bec Gardens (see below).
For bus passengers
Introduce a bus lane on Tooting Bec Gardens approaching the junction by removing some parking. 15 high-frequency bus routes pass through the junction. Delays resulting from the new crossing would be mitigated by a new 170 metre bus lane on Tooting Bec Gardens approaching the junction. There are often gaps in the parking so the proposal minimises the overall loss of parking spaces and makes more efficient use of the space (see the drawing for the location)
Ban the right-turn into and out of Shrubbery Road on Streatham High Road. Northbound buses are currently delayed by vehicles turning right into Shrubbery Road, approximately 150 metres north of the junction, because of a short right-turn pocket in the road. We therefore propose to ban the right-turn from Streatham High Road into Shrubbery Road for all traffic. There would also be a longer right-turn pocket to allow vehicles to queue without blocking traffic when turning into Sunnyhill Road. Vehicles turning right out of Shrubbery Road can also delay southbound traffic including buses so it is proposed that is banned too. Before we make the banned turns permanent we would monitor congestion and bus delays to confirm if it is necessary to mitigate the impact of the relocated crossing and making it controlled and will publish our findings
We would need to extend the right-turn ban from Mitcham Lane into Streatham High Road southbound to include buses. This wont have an impact on bus passengers as this turn is only used by buses 'not in service'. By fully banning the turn we reduce the traffic impact of the relocated crossing and making it controlled.
Created by Eric Booth // 2 threads
Tighter corners to favour pedestrians and manage speed.
https://www.citizenspace.com/bristol/city-development/coronationroad/consult_view
Suggested points:
1. This is a 'gateway' to the 20mph area and the opportunity to mark this and make it work should not be missed. It's not enough to just narrow and reshape the carriageway. It should feel different.
2. Central islands and build-outs introduce pinch points that make cycling feel less safe. There should be a cycle lane through the pinch point in line with guidance.
http://www.cycling-embassy.org.uk/sites/cycling-embassy.org.uk/files/documents/cyclingengland/2011/01/a03_traffic_calming.pdf
3. A better option to emphasise pedestrian priority would be a zebra crossing
Created by Jean Dollimore // 1 thread
Camden proposes the following measures:
Sam // 1 thread
The site for the new building between in the triangle between the cycle path the busway, and non-busway road has a solid hoarding around it. To help visibility, the solid hoardings have been removed for 3 panels on the cycle path side, and only 2 on the road side, so traffic has greater visibility of cyclists that cyclists have of motor vehicles - so vehicles assume there is nothing coming and slow down less than they should.
To increase visibility on the corner, the third solid panel should be replaced with the mesh fencing, as has already been done for the first two on the other side.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Created by Simon Munk // 1 thread
Since the horrific attacks that took place on Westminster Bridge, and most recently London Bridge, the Metropolitan Police have installed temporary barriers on many central London bridges.
LCC is fully supportive of the need to take urgent steps to provide extra protection for Londoners and visitors to our city. But we also believe it's right that we look at these measures, that have had to go in very rapidly, to see both what lessons need to be learned for future Highways schemes in the capital, and to see what, if any, tweaks can be undertaken to ensure these barriers can provide the extra security needed as well as allow people, especially London's large number of cycling commuters, to continue to cycle safely with minimal disruption - ideally even with enhanced safety and/or provision.
Now we want your ideas of any tweaks, modifications or other measures that can be brought forward on the bridges affected so far, and given the measures in so far, to provide vital measures to protect against terrorist attacks, but also to enhance safety and provision for those walking and cycling, and to mitigate the negative effects of the measures so far.
Created by Jack Thurston // 0 threads
We want widen and redesignate this footpath as a safe, dual use, route, especially to enable children to ride to school safely. This would allow cyclists to avoid a stretch of the Brecon Road and Pen-y-Pound, which are both fast and hostile roads.
Created by timlennon // 1 thread
No entrance to the school is accessible by bicycle for children, unless they cycle on the pavement. Even when they do, there are busy roads to be crossed with poor sightlines, or simply conflict with pedestrians.
Created by Clare Rogers // 17 threads
Enfield Council through Cycle Enfield are seeking views from the public on a number of ideas for the area shown in the map. In their words:
"We have a number of ideas that will not only help more people to walk and cycle but will also enhance community spaces, making Haselbury Neighbourhood a better place to live. Help shape our designs before we carry out a consultation later in the year. You have until Sunday 1 July to share your views."
***Note that there are separate threads below for each of the 13 drawings***
THESE DESIGNS ARE NOW REVISED FOR THE STATUTORY CONSULTATION
Created by Gregory Williams // 1 thread
The road between Kingston and Barham is rural and has fast-moving traffic despite the majority of it having a 30 mph speed limit. There are no accompanying footpaths beside the road and the road is relatively narrow. A cycle and pedestrian link is required, particularly to allow schoolchildren from Kingston to safely reach the primary school in Barham.
Created by Andrew Woodward // 0 threads
Serious safety concerns on this stretch cyclepath crosses side-roads. See the main thread at
http://richmondlcc.cyclescape.org/issues/590-a316-cycle-lane-priority-over-side-roads
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Stephen Lawrence // 1 thread
Some people are especially sensitive to lights, including flashing lights, and lights which point directly into their eyes. Both these two situations can result in migraines for the unfortunate observer.I am glad to read that German law mandates downward-focussed lights. We should do the same.
Flashing lights used to be illegal (i.e. when incandescant lights were the norm) but the law was changed to specifically allow them. However, for the reason above, and also because judging the speed (and to some extent the position) of a bicycle is impossible when the light is flashing could actually make flashing lights less safe. Batteries have improved and LEDs are more efficient, and the battery life even on 'steady' mode is way more than in the 'days of yore' hat some of us knew.
Created by Dexter Johnstone // 1 thread
There have been a number of accidents here where the tram lines curve across Sheffield Road to the Birley Moor tram stop. The rails cannot be crossed at right angles.
There is loads of open space around here where off road cycle paths could be installed.
Created by Simon here // 2 threads
Complete separation of cyclists and cars can't always be achieved. To make sharing of the road safer I would like to propose using rumble strips instead of flat paint to separate the bike lane from the rest of the road. It would act as a physical reminder for car-drivers that they are encroaching the bike lane. This happens particularly near pinch points like road bends or crossroads. So even just a selective application of rumble strips could have a very positive effect, I believe. What's the view of the cycling community? Has it been tested?
Created by Paul James // 0 threads
The carpark entrance cuts across the cycleway and has shallow corner radii encouraging fast entrance and exit speeds which are a danger to cyclists using the cycleway.
The cycleway should be curved away from the roadway at the junction and a marked crossing put in place a cars length from the roadway allowing space for entering and exiting cars to giveway to cyclists moving along the cycleway.
Created by Simon Still // 3 threads
Brixton Liveable Neighbourhood
Healthier and safer streets for Brixton. Join the conversation to develop ideas for your neighbourhood.
Engagement for
Railton Neighbourhood
Loughborough Neighbourhood
Ferndale Neighbourhood
Created by JonC // 2 threads
Blake Hall Road is an important and pleasant north-south route for cyclists and is often used by groups avoiding the busy roads in North Weald and in Ongar. However, crossing the A414 can be very difficult due to fast moving traffic from both directions.
The A1 route requires improvement for safer cycling to provide continuity from the A1000 cycle route in Barnet.
Southbound:
The A1 red route has an unprotected bike lane for the first half of the ascent, although traffic is single file until just before the lights and tends to leave room on the left for most of the climb. However, between the lights at Muswell Hill Road and Shepherds Hill the road has two congested traffic lanes leaving no space for cyclists (see photo). South of this it’s single lane with parking, then a bus lane and then cycle tracks appear at Archway gyratory. The issues south of Muswell Hill Road also affect Haringey cyclists using that road from Muswell Hill.
Northbound:
The A1 route has segregated bike or bus lanes up to Shepherds Hill lights, where it becomes two congested traffic lanes between there and the Muswell Hill Road lights, leaving no space for cyclists. Emergency social distancing provision has led to the left lane being fully cordoned off to provide extra pedestrian space for the shops, which squeezes cyclists into the remaining traffic lane. North of Muswell Hill Road is a fast, single lane descent with parking on the left for the first half. The Bakers Lane gyratory can be navigated to the A1000 without changing lanes, although other traffic is crossing lanes making this hazardous for cycling.
Haringey cyclists heading for Muswell Hill have the added problem of a difficult right turn off the A1 into Muswell Hill Road.
Created by Matthew Phillips // 1 thread
The bottom stretch of Potters Bank is quite steep, and therefore cyclists tend to be going quite slowly up this section of road. In this situation it is nice to have plenty of space so that you can pedal at your own pace without feeling hassled by traffic trying to overtake. Unfortunately on this section of road, there are several car parking spaces on the up-hill side of the road. When they are occupied, passing them on a bike is a slow and uncomfortable business. It would be far better for cyclists if these spaces could be removed and an up-hill cycle lane provided.
The parking spaces are not adjacent to any properties so there is no particular need for people to park there rather than in neighbouring streets: they are probably mainly used when the spaces in Quarryheads Lane are full.
Created by Ms Andrea Vinicombe // 1 thread
Residents of Kemptown are unable to join the Madeira Drive cyclepath approaching it from the north unless they cycle along Marine Parade to the Pier or to the Duke's Mound sliproad. This means they have two options:
1) cycle on Marine Parade which is a busy A road.
2) cycle on the promenade which is unofficially shared with pedestrians.
Neither of these options are safe.
Created by ambrosen // 1 thread
For additional commuter access to the Newton Park campus of Bath Spa uni, does anyone have any ideas about upgrading the footpath over the field from route 4, under the railway to the new path on the A4, linking up with the university.
I realise that for westbound commuters, this duplicates the route which took some effort to get made on the A4, and that it needs a new right of way to be made/purchased/recovered from the historic record, but it looks like a good link.