NCN55 Sir Matt Busby Way
A section of the road now has a TRO restricting all motor vehicles without a VIP parking pass. Cycling is permitted on this section, but there are no signs to confirm this. The road still part of NCN55.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
A section of the road now has a TRO restricting all motor vehicles without a VIP parking pass. Cycling is permitted on this section, but there are no signs to confirm this. The road still part of NCN55.
Created by David Earl // 5 threads
There is a great shortage of cycle parking in Cambridge City Centre. The cycle parks have been very successful, but the promised 500+ spaces at Grand Arcade actually only delivered around 250.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Martin Lucas-Smith // 1 thread
Discussion of cycle training issues in Cambridgeshire.
Created by David Earl // 1 thread
Dear CCC,
In light of the recent news of a cyclist being injured by a motorist whilst on the off road cycle path on Barton Road (http://www.cambridge-news.co.uk/Cambridge/Driver-who-knocked-over-cyclist-keeps-his-licence-16012012.htm) I was wondering if the CCC is campaigning for a reduction in the speed limit along Barton Road? I think (but am not categorically sure) that Barton Road remains the last main road into Cambridge with a 60mph limit.
Barton Road suffers from two problems with speed: heading out of town motorists accelerate from 30 to 60 after the speed camera; and heading into town motorists are coming off the motorway and are used to such speeds and continue to drive way over the 60 limit.
According to the http://www.crashmap.co.uk/ Barton Road has seen several fatalities and many accidents recently.
Sincerely
Barnabas Baggs
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Moss // 3 threads
Planning application submitted for housing near the primary school and a mixed use housing plus retail development at Unwin Square, east of the Permier Inn. Concerns about provision for cycle parking contained in the plans submitted.
Created by Robin Heydon // 1 thread
Proposed package: Streamlining bus services through Cambridge city centre
A package of measures including some of the following is proposed:
• Cambridge Core Scheme extension – potential remove all traffic but buses and cycles from St Andrews Street north of Emmanuel Street through the day.
• Address taxi overcrowding in St Andrews Street.
• Remove / relocate some on-street parking in Jesus Lane.
• Bus priority measures along Chesterton Road
• Improved bus stop infrastructure in Hobson Street and Jesus Lane.
• Removal of some parking on Histon Road and Station Road.
• On Street ticketing at busy or constrained boarding points to reduce bus standing time and pedestrian congestion.
• Enhanced enforcement of infringements on key bus routes and stops.
• Rerouting of some buses away from Bridge Street / Magdalene Street.
• Park and ride capacity enhancements
• Rural interchange enhancements on longer routes benefiting from the city centre improvements.
ATM proposed next to Hills Road cycle lane
Martin Lucas-Smith // 3 threads
The LSTF is the funding from government for sustainable transport for the region. This issue covers discussion of the bid.
Martin Lucas-Smith // 2 threads
Planning application by Sainsbury's on Mill Road - various issues.
Created by Simon Nuttall // 1 thread
I'll hang a thread off this general issue where we can share news - at least while we transition to using this new system.
Created by Heather Coleman // 1 thread
The planning application has the promise of new, extra cycle parking, which should be good news. However, details are scant to say the least and as new jobs will presumably be created, I fear it will do nothing to alleviate the chronic shortage of cycle parking on site, especially at this location at the rear of the Concourse, and a place of choice to park if you have cycled from Trumpington.
Warrington Cycle Campaign have produced a leaflet aimed at improving the mutaul understanding of cyclists and bus drivers points of view.
It is called "Bus Drivers & Cyclists in Harmony"
We hope to promote better relations between the two groups via a similar leaflet. The key goal is safety but enhanced respect by both parties would be of benefit.
We have serious concerns over the standards of driving of certain classes of vehicles in Cambridge.
We have an opportunity to push for both bus companies and and local authorities to train their drivers to a higher standard
Under the 'Certificate of Profession Competence' drivers of certain classes of vehicle are required to undertake 'continuing training'
There has been an article in Local Transport Today about training in London. see:
http://www.transportxtra.com/magazines/local_transport_today/news/?id=29476&StartRow=1
"A COURSE designed to cut the number of lorry accidents in urban areas, particularly those involving cyclists and pedestrians, has gained industry accreditation.
The ‘safe urban driving’ (SUD) course developed by Transport for London and London boroughs has been accredited by the Joint Approvals Unit for Periodic Training, the body set up by the sector skills councils for freight and passenger transport to manage the driver Certificate of Professional Competence (CPC). "
"EU directive 2003/59 requires lorry and van (over 3.5 tonne) drivers to obtain a CPC by completing 35 hours of training every five years. The requirement came into force in 2009, so the first deadline is September 2014. "
"The second half of the course sees the lorry drivers get on bicycles and go on-road to understand how cyclists position themselves on the road, and how to drive in the presence of cyclists. This module was developed by Cycle Training UK for the London Borough of Lambeth. "
I've already pointed out this scheme to the cycling officers
It may be that we can get the LA's to approach Stagecoach on this issue and it could form part of any 'Quality Contract'
Created by Jim Chisholm // 1 thread
The County is proposing a 'controlled parking zone' to cover a wide area around Addenbrooke's. The exact limits are to be discussed, and issues will arise in area of new housing where the roads are yet to be adopted.
An initial meetimg for stakeholders is to be held at Hills Road VI form college on Thursday February 2nd from 18:30 to 20:30
The map shows the area being studied
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Created by Simon Nuttall // 19 threads
The Reach Fair ride takes place on the early Bank Holiday Monday (May Day) in May.
The web page for it is:
http://www.camcycle.org.uk/events/rides/
The planning overview is summarised:
http://www.camcycle.org.uk/events/rides/timeline.html
I've created this issue to help plan this event.
Created by velocipedus@gmail.com // 1 thread
Rather than providing adequate cycle parking for their pupils this Sixth Form college is discouraging cycling and increasing the likelihood of cycle theft. The bikes that were previously attached to these railings are now left on the opposite side of the road where they are not so securely parked. See http://cambridge.cyclestreets.net/location/27865/ #27865 or #27866
Although some cycle parking does seem to have been provided: http://cambridge.cyclestreets.net/location/28093/ #28093, #28092 it is clearly not enough
Various issues in Cambridge regarding bus driving and cyclist interactions. Work needs to be done to deal with this.
(This is actually a city-wide issue, but I've marked this as the bus station for now.)
Aims of a bike harvest:
- Reduce bike ‘litter’
- Improve the number of available bike parking spaces
- Recycle bikes and provide affordable bikes (with lights) for new students
- Employ disadvantaged people
Martin Lucas-Smith // 17 threads
Many issues here about cycle parking - not only the station itself but the CB1 area
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Colin Wing // 2 threads
This is the proposed route of Quietway 16 in Westminster
Nominal deadline set to clear this from the Consultation Map.
Created by londoncycler // 1 thread
On the south (Southwark) side of the bridge just before the central section there is a very prominent ridge approximately one metre away from the kerb and running parallel to the bridge for some 30 metres. It is located exactly in the path of cyclists crossing the bridge who can be knocked off as they cross the ridge in either direction. In the dark and in the wet the ridge is very hard to see and cyclists may not see the ridge. The fault has been reported repeatedly in the course of more than 2 years to the local highway authority but no action has been taken. Can the highway authority explain why the ridge has not been removed?
Created by wookey // 2 threads
Out of the A1307 Linton Greenway consultation has come a plan for the section between Addenbrooke's roundabout and the Babraham P&R, which the county/GCP are keen to move forward. There was an initial invite-only consultation event on Thur 31st Jan for local residents/residents associations to comment.
Created by Tammy Hervey // 0 threads
There is a bike rack outside Leopold Square. But it was full when I arrived there at 3pm on Thursday 6 Sept 2012. So I locked my bike to the railings outside the Aagrah Restaurant on Leopold Square. When I came back to it (after a lovely afternoon tea in the Leopold Hotel) someone had locked another bike to it. After frantic asking around everyone I could see in the square (embarrassing!), I found that the manager of Aagrah had done it. He was most unpleasant about it, saying (I believe correctly) that it is private property and that I could not park a bike there. There was no notice anywhere requesting bike users not to do so.
I gather that the issue has been taken up with the management - so if whomever did this on my behalf would like to comment, I'd be grateful.
Martin Lucas-Smith // 3 threads
Downing College are cracking down further on people cycling through the area. Gate now moved and is locked.
Created by Harry Fletcher-Wood // 0 threads
Hackney Council removed southbound buses from the Narrow Way recently. Having made these changes permanent, they are now proposing to redesign and improve the streets.
They propose 'removing the existing conventional road layout and replace it with a new, accessible pedestrian friendly street.
'Simplifying the street by removing the current clutter and providing new seating and cycle parking.
'Creating a new public spaces that are flexible and adaptable, and will allow for events and other activities to be hosted.'
The proposals shown here do not address difficulties people cycling have accessing the Narrow Way from the south.
Please let us know your thoughts - all contributions will help us formulate Hackney Cycling Campaign's formal response to the council on the issue.
Created by Jon_B // 0 threads
There are currently (29/06/15) temporary 3 way traffic lights in place at the junction where Rope Walk meets St Helen's Street.
This is normally a really painful junction for people cycling from Rope Walks onto St Helens Street at busy times with long waits for a gap in traffic and bad sight lines, particularly where west-bound traffic backs up leaving a gap at the yellow box junction so that people cycling have to venture out halfway across the road to see if there is any traffic coming east-bound.
The lights make this considerably easier and would be worth considering as a permanent signal.
Created by Jim Chisholm // 1 thread
Proposals are coming forward for the redevelopment of part of the Cambridge University Pres Site as a single location for Cambridge Assessment. Some public engagement will apparently start in November
Created by Stephan Matthiesen // 0 threads
Kirk Brae and Lasswade Rd at least up to Margiotta should be included in 20mph. It's very narrow, residential, and with many shops in Lasswade Rd.
It's also steep uphills and fast overtaking makes it very dangerous for cycling.
Created by MB // 1 thread
There is a useful but unmarked path from Queen's Road to Richmond Park and through to Sheen. It is used by pedestrians and cyclists & I have never seen it on any map! From Lower Grove Road, it takes you to the park via Bog Gate, or Sheen via Sheen Common.
If it were better marked on maps, better maintained & wider in places, it could form a useful section of Richmond's (paved, segregated, Dutch style?) cycling network.
Tom McKeown // 1 thread
Drivers ignoring the marked priority at Magdalene pinch point is a regular occurrence when faced with city bound riders. At times this can be very dangerous. Especially when large numbers of riders are forced into a very small gap between the vehicle and the bollards. I should imagine the situation is especially unpleasant travelling with small children. Also difficult to resolve with a wider cargo cycle, trailer or trike.
Created by Anna Williams – Head of Campaigns & Engagement // 2 threads
A place to gather threads about cycling issues in Peterborough and any consultations on active travel schemes in the area.
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by Kevin Ablitt // 1 thread
As you can see in the photo there is a shared use path on river side of West End Rd just east of Bobby Robson bridge. But then where ? How far does it go ? It is certainly no good if you want to cross Princes Street- you cant unless you go up to the Burrel Road end of the bridge. And anyway once you get over Princes Street along Commercial Road and Grafton Way it is a narrow footpath which is not shared use.
It would be good to connect Bobby Robson Bridge and the Waterfront.
Directly and not by switching over to the other path and then over two toucans. Perhaps even a wide cycle crossing of the 4 lanes of Stoke St ? That would be brilliant.
Anon // 1 thread
Wandsworth Council has opened a consultation on two-way cycling on Furmage Street and part of Twilley Street between Garratt Lane and Kimber Road in Wandsworth. This would allow cyclists to avaoid having to make the tricky and dangerous right turn at the end of Kimber Road. Wandsworth Cycling Campaign has been asking for this for several years. The scheme is now being built under an Experimental Traffic order and includes physical measures using islands and armadillos to protect cyclists and direct and slow the motorists who rat-run through these small streets. Please use this facility if it's on your route and feed back your comments to the consultation. At the end of the experiential period in October the comments will decide whether the scheme should be made permanent or not. Use the consultation to let them know if you appreciate it. Let the Council and cyclewandsworth@gmail.com know of any problems or improvements you'd like.
The link to the consultation which includes a plan of the changes is:
https://haveyoursay.citizenspace.com/wandsworthecs/twilley-19/consult_view
This stretch of NCN2 has not had the too-narrow footway widened to allow for safe shared use. Oddly the part just to the east, where the existing road was narrower, has been widened.
We need some of the wasted five lanes of motor vehicles to be re-allocated to allow the footway to be widened to be wide enough for shared use. They could even make use of the now-redundant cycle lane on the road heading west.
There has been stepped access from the riverside to Victoria Bridge for years, possibly since the bridge's construction.
Victoria Bridge is currently closed pending refurbishment/reconstruction due to its dilapidated and dangerous condition; there may be S106 money available from the developers of the adjacent Western Riverside housing development. It's crucial to write to local councillors expressing the community's desire to have the bridge access not merely restored, but enhanced, for the benefit of cyclists, pedestrians and less-able users of the bridge and riverside.
Created by Peter Loader // 1 thread
This proposed Berry Lane Estate to Shepherd Primary School, Mill End cycle route follows:
* Chiltern Drive.
* Part of Shepherds Lane.
* Part of the south east path through King George V Playing Fields, Mill End.
* The pathway leading to the new pedestrian entrance to Shepherd Primary School, near its cycle parking area.
Created by Charlie Halliday // 1 thread
Proposal to help pedestrians crossing A325 also includes a proposed Shared Use Path.
Concerns:
1. Shared Use Path would feed cyclists into moving traffic, better if they join at the junction.
2. Proposed traffic islands and changes to kerb line create pinch points for cyclists.
3. Signalled crossing on north branch of junction would serve pedestrians better.
4. Conflicts between pedestrians and cyclists on existing and proposed SUPs
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Shaun McDonald // 0 threads
The cycle lanes through Trimley stop for each traffic island rather than continuing thus causing a dangerous pinch point for cyclists on the National Cycle Route 51.
What general measures (publicity, fairs, web activity, leaflets, brochures, campaign manifestos) can we undertake to promote cycling in Cambridge in the most general sense?
This issue is a discussion area for proposals and discussion on creating general-purpose material and the approach that can be taken to promote cycling, and the difficult question of how this is balanced against difficulties that cyclists face in practice.
This issue is not for discussion of specific problematic infrastructure or helmet issues, or anything like that.
Created by Chris Peck // 1 thread
Upgrading the narrow footpath into a wider route usable by cyclists has been a long term priority for the Godalming Cycle Campaign. This route is a key link for pedestrians and cyclists between Farncombe/Binscombe and Godalming.
This year the Waverley Local Committee has dedicated funds to construct the path, which will run over land currently owned by Jewsons.
Created by Harry Fletcher-Wood // 1 thread
The Woodberry Down Development Team (Hackney Council, Berkeley Homes and supported by Transport for London) are consulting on "changes to Seven Sisters Road, from Green Lanes to the west and Amhurst Park to the east, as part of the on‑going regeneration of the area".
They have offered six 'ideas':
1) Reduce road to two lanes in either direction (one general traffic lane, one bus lane)
2) Reduce road to two lanes (one general traffic, one bus) in either direction, but widen to three lanes at junctions
3) Increase the number of pedestrian crossings
4a) Add a 'pedestrian island slip' between the two carriageways
4b) Add a wide 'pedestrian island slip' with planting and trees
5) Segregated cycle lanes
6) Widen bus lanes
Different combinations are possible. For example, 1 (change traffic lanes) would be necessary for 4 (pedestrian island slip) and 5 (segregated cycle lanes). 1 (change traffic lanes), 4a (pedestrian island slip) and 5 (segregated cycle lanes) would work together, whereas 2 (change traffic lanes but keep three lanes at junction) would make pavement widening and segregated cycle lanes impossible.
Please respond by Sunday 15th February so that Natalie and Harry can draft a response representing Hackney Cycling Campaign's position.
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.