Beeston Centre E-W alternative route - Northern corridor
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
There will be a walking meeting to look at the route on the 24th April at 11.00 Organised by Hugh McClintock of Pedals.
Created by timlennon // 0 threads
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. Measures such as 20mph and traffic calming are needed here, along with re-alignment of parking..
Created by timlennon // 0 threads
Barnes should be a pleasant place to visit. make the whole area 20mph, and provide safe routes for cycling through the town centre away from traffic conflict. Remodel road and pavement layout to provide a family-friendly space.
Created by Simon Nuttall // 3 threads
In 2012 a long list of candidate one way streets for conversion to two-way cycling was drafted. http://www.cyclestreets.net/photomap/tags/twoway2012/
Two years later the County are now proposing a short list of 11 streets for conversion.
Created by Jon_B // 1 thread
The contra-flow cycle lane leading West on Dogs Head St was (once again) obstructed by illegally parked vehicles this morning.
I have reported the specific incident, but this seems to be to be a more general problem of lack of enforcement and commercial vehicles believing that it is acceptable for them to use these lanes for short (or not so short) stops.
In this case there were a large lorry and a van parked one behind each other forcing cyclists to pull out around them into potential oncoming traffic (including buses as can be clearly seen in the photo).
If these lanes are to form part of the planning scheme then they need to either by physically segregated so as to prevent vehicles parking on them or at the very least there needs to be a zero tolerance approach to enforcement.
If commercial vehicles do need to use them for emergency purposes (I think they may have been investigating the traffic lights which were out of order) then they should be obliged to put in place some kind of stop / go scheme to avoid conflict between cyclists and oncoming vehicles.
Created by Jean Dollimore // 1 thread
TfL officers told us last November that they have a project to improving conditions for cyclists on Camden Road. This would include "investigating the feasibility of a northbound mandatory cycle lane; a wide bus and cycle lane southbound and the removal of two- lane flares at junctions". They assumed a 12m road width, suggesting 6m for a pair of general traffic lanes together with a 2m cycle lane and 4 m bus +cycle lane.
They are now inviting CCC to a meeting to discuss cycling on the TLRN in Camden, and also take the opportunity to walk along Camden Rd to further discuss the corridor scheme they’re progressing. On further enquiry they said:
"We would prefer to take the opportunity to engage with CCC as an independent stakeholder, separate from LB Camden, in order to fully understand the campaign’s ambitions for the TLRN."
So....
1. Let's clarify what we would want on Camden Road (without taking on TfL's assumption that there must be a bus lane. And being realistic as to what might fit in at a junction. The above photo shows a potential left hook situation.
2. Can I have volunteers to join me on this walk/talk.
Jean
Created by Jamie // 1 thread
At the moment it is possible to cycle from Cambridge Road, near Madingley, to Girton, on a bridleway that crosses over the A428 and then passes under the M11 at the Girton Interchange. You can then cross three roads (A1307) and reach a pavement on the North-East side of the Interchange. Using the pavement you can then reach Washpit Lane and cycle up towards Girton. (The pavement is marked as a shared-use route on the OSM Cycle map, although I am not sure that it really is.)
Apart from having to be careful when crossing the A1307 junction it is a rather pleasant route to ride.
The Girton Interchange is being "improved" to reduce the bottleneck for cars. Does anyone know what plans there are to ensure that the current route through remains open and whether there are plans to improve the bridleway route through? Or will this be another example of roads being developed to the detriment of footpaths/bridleways.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Created by timlennon // 1 thread
Cycle parking at Teddington station can only be accessed by bridge from the Bushy Park side. The absence of a gutter on the bridge makes access very difficult, because the bike needs to be lifted all the way.
Created by Pixlink // 0 threads
The priority issue identified by many community stakeholders and in the Town Plan is to ensure the network of cycle paths in the town are joined up in a useful way. The restriction on two-way cycling in the Thoroughfare is a barrier having a complete network in the town. All the cycle local cycle routes feed into the town's main street, the Thoroughfare yet this "pedestrianised" road has a one-way restriction to traffic and cyclists heading northbound. Pedestrians and people in electric buggies are of course able to travel at will in any direction. Those living in residential areas in the south of the town have to cycle on main roads to the schools and industry and residential areas in the north and vice-versa.
Previous work by Sustrans and the Town Plan has identified the impracticality of only allowing one-way travel for cyclists along the Thoroughfare when this is a National Cycle Route and it conflicts with national health and transport strategy to increase cycling. Though permitting two-way cycling on a one-way street is thought politically sensitive, there is no evidence of increased danger to pedestrians and there are many examples of this practise elsewhere.
Created by Grahame Cooper // 0 threads
The cycle lane passes through the door-opening zone of parked cars in several places. This is especially dangerous on a road with a 40mph speed limit.
Created by Shaun McDonald // 0 threads
The London Road Shell garage is a pain to pass as you have to cross the path of vehicles turning in and out, and can be quite dangerous.
It would be far better to have the petrol station closer to the road, and the cycle path going behind the petrol station. This is the Dutch standard as shown in this example:
https://twitter.com/aseasyasriding/status/444203865353621504
Created by Chris Whitehouse // 0 threads
This refers to the shared cyclepath/footway across St Albans Road West at the junction with Cavendish Way.
There is a flower bed on the east side of this crossing which projects into the line of the crossing. There is also a cyclepath/footway sign on a short post in the flower bed.
At night it is very easy to take a line which sends you into the flowerbed, particularly if crossing quickly to avoid traffic exiting from St Albans Road West. It's not hard in daytime too if there is pedestrian traffic.
Please fill in and resurface a short section of flowerbed and resite the sign.
Created by Chris Whitehouse // 0 threads
This refers to the southernmost end of the short loop of Mill Green Lane to west of the A1000.
Heading north on a bike past this side road requires simultaneously looking
- 180deg back to check for vehicles turning in
- to left to check for vehicles exiting
- ahead to check for bikes heading south
Heading south on a bike past this junction requires
- looking 120deg right for vehicles exiting
- looking ahead at road for vehicles turning in
- looking ahead at cycle path for bikes heading north
- moving as far as possible to the left, ie almost into the main road because visibility of the cycle path is obstructed.
A cheap and effective solution would be to block this junction with a safety rail or similar on the line of the edge of the A1000. Motor traffic can use the north end Mill Green Lane, where there is no conflict with cycle traffic on the cycle path because cycle traffic crosses to the east side of A1000.
Created by George Britton // 1 thread
Aldershot Urban Extension - Green Light from RBC
Created by Grahame Cooper // 0 threads
One-way carriageway with two lanes, one of which merges onto St Peter's Way. Narrow cycle lane (<1m) with sunken drains and detritus. If you use the cycle lane, you often get passed very close by cars. If you ride outside of the cycle lane, you sometimes get aggression from following drivers. Taking primary position in the inside lane would feel extremely dangerous as the traffic moves very fast despite the 30mph speed limit.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Despite the number of bridges that link Newcastle and Gateshead, there is not a single route across the Tyne that throws bike users in to conflict with either high volumes of motor vehicles at high speeds or that uses shared paths that create potential conflict with pedestrians.
Due to the amount of people who already cycle between Newcastle and Gateshead and the potential for this to grow, there should be at least one high level crossing that gives bike users there own space when crossing the Tyne.
Created by Kate // 1 thread
There are three schools in this ward (St. Stephens Primary, Orleans Primary, Richmond Upon Thames College) and more just on the edge of the ward boundaries (Chase Bridge, St Mary’s, Ivybridge, Worple Primary, Orleans Secondary) and there is a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast moving traffic. The roads surrounding these schools should all have 20mph zones including larger roads such as St Margarets Road, which is a heavily used link between areas. There should be car-free access around the schools, and protected routes to arrive there. In due course there should be a default 20 mile an hour limit on all residential roads in the borough.
Created by Ross // 1 thread
https://mapsengine.google.com/map/edit?gl=uk&mid=z-ea3VIs1n24.kfBnDgw-g7fg
Sheen Lane provides access to a number of schools, yet is a busy route with no space allocated for cycling. It should be safe for children to make their way to the numerous local schools by bicycle, and it would open up access to Richmond Park for visitors who wanted to cycle from Mortlake Station. The junction with the South Circular is especially unpleasant for both cycling and walking, and deeply unwelcoming.
How to do this: Raised zebra crossing at Vicarage Road, Palmerston Road and E Sheen Library, 20 mph signs to continue park speed limit to Mortlake station, removal of centre lane white lines, toucan crossing at A205 to allow cyclists to cross, with care, at same time as pedestrians, advanced stop boxes at level crossing and A205 junction, wider pavement on East side between York Way and Wayside - should be wide enough for a pushchair, improved signage and right turn access to North/South Worple Way - these are underused ward quiet routes leading to several primary schools and nurseries.
Sheen Lane is a key route in the ward, cycle volume could increase dramatically with some minor road improvements. Calming and reducing traffic on Sheen Lane would encourage recreational and school commuting cyclists to use this route more frequently. Sheen Lane as a pleasant cycle route would provide quiet cycle link routes to many schools; Tower house, Thomson House, Sheen Mount, Barnes, Ibstock, Mary Magdalens and also link together tens of miles of Thames Path and Richmond Park traffic free routes that could be enjoyed by cyclists from 8 - 80. It would attract more recreational cyclists to get off at Mortlake station and spend money and time on our high street.
Created by Matthew Phillips // 1 thread
Another student housing conversion with inadequate provision for bicycles and possibly excessive provision for cars.
Application states 8 cycle spaces, 8 car spaces and 1 disabled parking space. Total 33 student bedrooms. To go with BREEAM this would suggest 17 cycle spaces would be preferable for residents, plus visitor spaces. The cycle spaces pictured are old-fashioned -- I doubt they would actually provide that kind of rack -- but partially covered. It is unclear whether these would be in a secure area or not. They are round the back of the building.
Camden Council's proposals include the following:
- Raise junction Bartholomew Road Kentish Town Road
- Cycle gap in Kelly Street closure at Castlehaven Road
- Raise junction Anglers Lane/Willies Road/PrinceofWalesRoad
- Two way cycling in Wolsey Mews
- Raise the LeightonRoad/Torriano Avenue junction and introduce cycle gap at the central refuge island
Created by Hester Wells // 4 threads
As part of the Cycle City Ambition Grants there are proprosals to install wide, segregated or hybrid cycle lanes, with priority over sideroads, on Hills Road.
Created by Jack Thurston // 1 thread
Cycling is not permitted in 'Red Square', the red-paved pedestrian area of the centre of Abergavenny.
Even so, cycle route 42 runs through it...
An interesting blog post on cycling in pedestrianised areas:
http://aseasyasridingabike.wordpress.com/2014/03/03/cycling-in-pedestrianised-areas/
One solution is to make the entire area 'shared use'. Another would be to restrict the prohibition on cycling to the busies times of day, eg. Mon-Sat 10am-4pm, and allowing unrestricted cycling at all other times.
Created by PeterMac // 1 thread
Redesign of Grey Street to remove the danger of cars reversing (blind) out parking bays into middle of the road.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.