Waterfront cycle access confusing
Comments at Cycle Ipswich meeting:
* Westbound cycling is confusing as you currently technically need to ride on the pavement.
* Are vehicles really needed along here?
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Shaun McDonald // 2 threads
Comments at Cycle Ipswich meeting:
* Westbound cycling is confusing as you currently technically need to ride on the pavement.
* Are vehicles really needed along here?
Letter for TfL, copied to RCC, by local resident:
I am a resident of the Dover House Estate area and regularly use the crossroads of the Upper Richmond Road (A206) with Roehampton Lane and Rocks Lane (A306) as pedestrian, cyclist and/or car driver. There are three major issues with this junction which need to be addressed.
The first is the pedestrian crossings, which are poorly timed/synchronised and inadequate. There is a significant volume of pedestrian traffic to and from the station and bus stops and the university, yet to cross the road safely using the crossings can easily add 5 mins to the journey. This is mainly as there are push button crossings on only two of the four arms of the junction, a third having provision to cross which requires too much calculated risk (and insufficient island space considering the probability of standing in the middle for some time), and the fourth having no sensible provision at all. There is a high proportion of children using the crossing - with buggies, scooters, bikes, and on the south west corner insufficient pavement space for the volume of pedestrian traffic at peak times. The timing/synchronisation of the green men requires pedestrians to stand in the middle islands for an overly long period of time - during which time they cannot help but notice the very high level of exhaust fumes. Given that the only traffic flowing south along the A306 and allowed to turn right on to the A205 is buses and cycles, the extended wait for the green man in the middle of the A205 to head south seems unnecessary. Heading north there is a similarly unnecessary wait for the green man, as motorised traffic heading east along the A205 is also at a red light while that heading north on the A306 is on green.
The second major problem is the filter lane for motorists turning right off the A205 into the A306 to head north. This only operates at peak times, leaving motorists with a choice between being stuck in the middle waiting for a second round of lights or skipping through an amber or red light (frequently even though they were first in the queue). There is simply too much traffic heading east to not have the filter light operating for a greater part of the day. Even when the filter light is in operation it is for such an insufficiently short period that unless you are among the first three cars you are almost certainly going to wait for at least two rounds of lights - at peak times I have waited for the fifth round of lights. This in turn causes a tail back and high levels of air pollution.
The third major problem is the lack of cycle ways. There is a large number of cyclists on both these major roads but for something like a 500m radius around this junction there is no cycle way despite it bring both possible and dangerous without. The temporary narrowing of Barnes Station bridge only exacerbates the situation and since being put there some years ago seems to have been forgotten. This area is a real hole in the cycle way network and a blackspot considering the attractive options in every direction coming into/out of it.
The junction is an accident just waiting to happen on many levels. I would be grateful if you could me a detailed response to each of the points I raise with where at all possible a timetable for when they can each be expected to be resolved.
Created by Joe Adam // 4 threads
Arbury Road is proposed to be upgraded under the City Deal scheme.
In 2014 there was a consultation running on improving the Arbury Road near St Laurence Primary School.
Created by fishter // 2 threads
At the bottom of the hill there is a "chicane" for motor vehicles to negotiate. Northbound traffic must give priority to southbound traffic.
The chicane is formed by an island on the northbound side of the road. This island has a bypass to the left to allow cyclists to proceed despite oncoming traffic.
After a recent resurfacing of the road the markings for the cycle lane were omitted (see picture). This means that cyclists should now give priority to southbound traffic as the markings indicate they should not use the bypass.
Created by Jim Chisholm // 4 threads
There is now an Area Action Plan for the Northern Fringe East
This is a huge area, and if the Anglia Water Works site is also redeveloped it brings big oportunities and associated risks
The Campaign needs to be involved
Created by MJR // 1 thread
There's an OK cycleway alongside the Bawsey Drain from the Loke Road Junction but the link from the edge of the town centre 20mph zone isn't very good. The section between North Street and Loke Road involves negotiating your way across the multiple lanes of John Kennedy Road which is the northern approach to the town, or illegally using the narrow footway as many people do.
This section is crying out for one of the three or four lanes to be given back to cycling and walking and the 20mph zone to be extended to the north end of North Street.
I see Addenbrooke's have found a solution to all the bikes locked to the railings around by the front entrance.
Not, as you might hope, by providing more cycle parking, but by removing the railings.
I wandered around yesterday. There were 91 bikes parked outside of cycle rack spaces & 6 spaces free.
should be interesting for anyone who usually cant park in a cycle space over the next few days
:(
Richard
A fast road - dual carriageway in both directioms and with 6 lanes at one end. Speed limit of 30mph rarely respected - except in rushhour when speeds can be down to zero mph at times.
Cyclists can not cycle safely along either side of the road. Cars, lorries, busses etc are travelling too fast, with drivers jostling to change lanes, overtake busses or 'beat the lights'. The cyclists I see are on the pavement & I don't blame them - frankly the layout is not fit for cyclists. Fortunately the pavement is wide, there are few pedestrians and there is ample room for considerate cyclists to travel this way. More cyclists would use this roue if it was safer & if it joined up properly with Danebury Avenue & the other cycle routes in the area.
With the wide pavements & carriageway there is room for segregated cycle, pedestrian and motor vehicle routes. There may even be room for 'floating' bus stops. A zebra or Toucan crossing on the road would also reduce average speeds.
There are three strips of cobbles across NCN11 here, or maybe they're setts. It seems bad to have these on a cycle route because they are unpleasant for cycling and especially bad to put them so near a junction because rider attention should be on the junction and other road users, rather than man-made problems with the road surface.
Created by Cllr Ian Manning // 1 thread
This pinch point has always been an issue for anyone cycling North along Green End Road. The pavement suddenly becomes wider at the roundabout, forcing cyclists into conflict with cars.
Created by John Chamberlain // 3 threads
Camden are consulting on their plans to extend the Royal College Street cycle tracks to the south, down Pancras Road towards Kings Cross. Unfortunately, the plans for the junctions at St Pancras and contra-flow up Midland Road are not ready yet, so it will remain difficult to get to and from the south and east until these are finalised, but this is another link in the planned North-South route through the borough as part of the London Cycle Grid.
Details of the proposals can be found on Camden’s website at:
https://consultations.wearecamden.org/culture-environment/pancrasroad
For cyclists, the main proposals are as follows:
- Protected cycle lanes from Royal College Street to just south of Chenies Place.
- Removal of two bus-stops to make the cycle lanes continuous
- North-bound bus-stop converted to 'island' style.
- Southbound bus-stop uses Royal College Street style due to lack of road width.
- Additional protection for cyclists crossing Crowndale Road from Royal College Street.
You can reply to the consultation via Camden's website. Please also add your comments to the threads on this issue, or by email to john AT camdencyclists.org.uk . We have already had suggestions for improvements to the lane behind the bus-stop at Chenies Place. We will be saying that cyclists heading north to Royal College Street should use Goldington Crescent to avoid one set of traffic lights and the need to cross lanes. What else?
Our response needs to be in by 14th November so we'll take comments on board until the 7th.
Created by Al Storer // 1 thread
A lot of attention is given, especially by the council, to the radial routes. This is OK. But what about this key (partial) orbital?
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Martin Lucas-Smith // 1 thread
Bikes leaving the cul-de-sac, heading East, have to cross traffic twice. There is poor visibility and vehicles rat-run through the area.
With the North West Cambridge development coming forward, this problem will get worse in time.
The side roads that access the avenue are a danger to the users of the shared path. This is especially prevalent on the northbound side in the mornings. Cars seem to have two modes:
1) stationary avenue traffic - approach at speed and hit the anchors in time not to hit the queue
2) no queue on avenue - approach at speed hoping not to have to stop. Then go for it or again hit the anchors.
In both stopping cases this blocks the crossing for the cycle/pedestrian
Ideally there would be an advance giveaway line/colored tarmac to identify the possibility of crossing bikes/pedestrians
Created by David Earl // 0 threads
We (Cambridge Cycling Campaign) have received an invitation to this event: Commuting and Health – Research and Policy Forum
Wednesday 21 January 2015, 10.00am – 2.00pm
http://www.cedar.iph.cam.ac.uk/commuting-health-forum/
Free, but registration required.
"The way we travel can affect our health and the health of people around us. In the Commuting and Health in Cambridge study funded by the National Institute for Health Research (NIHR), researchers have been following the travel and physical activity patterns of commuters since 2009, seeking to understand more about why people use different modes of transport and how this is related to physical activity, health and wellbeing. A key aim of the study has been to assess the impact of new transport infrastructure in the form of the Cambridgeshire Guided Busway, which opened in 2011 and provides dedicated traffic-free facilities for buses, cyclists and pedestrians."
Created by Shaun McDonald // 1 thread
There are 3 main problems with this cycle route which would be easy to rectify:
* This cycle track is only signed from the retail park side, with no signage from the residential end of this link.
* The surface is pretty poor along here, especially if you have some shopping in panniers.
* There is also a problem with a gate part of the way along, which could pose a problem for people with a trailer or cargo bikes.
Photos:
http://www.mapillary.com/map/im/BMxiiFHdjmrrL0iqIx8WTw
http://www.mapillary.com/map/im/8Y-kQQoHYp0Y_Zjn4dziJw
Created by Shaun McDonald // 1 thread
Overview
Working together with interested parties - including cycling, pedestrian and motorised road user organisations – we have reviewed the design of a number of key junctions identified as having road safety or other significant issues for cyclists and / or pedestrians.
This junction was identified as having a particular cycle safety problem. We have therefore developed proposals to improve safety at the junction, in particular for cyclists.
The responses to this consultation will help inform our decsion making as to whether we go ahead with the scheme as proposed or make changes to the scheme.
Why We Are Consulting
Our review of this junction has shown that there is a road safety issue for cyclists, in particular those travelling northbound along the A21.
Our proposals for this junction are designed to improve sight lines to make it easier for cyclists, motorists and pedestrians to see each other and hence improve junction safety. In addition the opportunity will be taken to improve the informal pedestrian crossings to make these more visible and easier to use.
Our proposed improvements include:
Amended A21 and Oakley Road junction layout to bring the junction closer to a right angle – this will improve sight lines
The cycle lane on A21 north bound (towards Bromley) will be widened to increase the separation of cyclists from other road users.
Revised informal pedestrian crossings will be provided across Oakley Road and across A21 Hastings Road. A central island will allow roads to be crossed in stages. Informal crossing points offer pedestrians a safe point to cross, with tactile pavement for those with visual impairments.
The right turn from Hastings Road to Church Road, which is not currently physically possible, will be specifically prohibited. The revised junction layout would make this a possible manoeuvre but it would conflict with right turning traffic into Oakley Road from the north and would not be a safe movement.
We are not changing any other aspects of the junction. Traffic will still only be able to turn left (north) towards Bromley from Oakley Road, while Church Road will remain one way eastbound, with changes to the kerb layout to deter illegal movements.
The map below illustrates our proposals.
You can have your say on our proposals by following the link at the bottom of the page.
Created by BrianInBeeston // 0 threads
Proposed route of NCN 15 from Trent bridge to Clifton, following the south bank of the river Trent. The idea under discussion is for the route to be temporarily signed by Sustrans volunteer rangers in the first instance. there are also plans to sign an NCN 15 to NCN6 link route via Wilford Toll, Birdcage walk, Lenton Lane, Abbey St. NCN15 from Clifton westwards to East Midlands parkway station can be signed once the A453 works are complete.
Martin Lucas-Smith // 31 threads
It is important that we engage with the candidates at each election, scrutinise their views, and press for their commitments to cycling.
Created by David Earl // 1 thread
'Except cycles' plates missing on No Left/Right turn signs at Mackenzie Road and Stockwell Street, and shared-use signs missing on Perne Road between Natal Road and Brookfields
Created by David Earl // 2 threads
The new franchise for the Kings Cross rail line started recently. We have been sent a letter of introduction.
Created by MJR // 1 thread
Basil Drive, Coriander Road and Bay Walk are residential streets that probably should be a 20mph zone, at least to avoid sat-nav routing cars that way in preference to Rosemary Way.
Created by Hester Wells // 1 thread
"Following a request for a vehicular access outside of 27 Tenison Avenue it is
proposed to revoke a 5 metre length of Residents Parking Bay and replace it with
double yellow lines.
If you wish to object to any of these proposals you should send the grounds for
objection in writing to policyandregulation@cambridgeshire.gov.uk to reach us by no
later than 19th September 2014 quoting reference PR0147."
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821
Created by Ben Brierton // 1 thread
The new road layout here means that eastbound cyclists travelling straight-on find themselves in the left-turn lane, stopped by a Red light, and blocking traffic turning left into the Park and Ride who have a Green left turn filter.
The road markings seem to expect cyclists in this lane to go straight ahead, even though it's the left turn lane, because it is guided into the onward eastbound cycle lane. Just feels wrong and leaves cyclists vulnerable to the left turning traffic.
There should be a 'redmac' cycle lane between the left turn lane and the right hand lane. The road markings should guide cyclists from this lane into the eastbound cycle lane instead of from the left turn lane.