Adam and Eve rat-running
A proposal has been put forward to add bollarded access in this cut-through from Adam and Eve Street through to Burleigh Street, to avoid rat-running in the area.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Martin Lucas-Smith // 1 thread
A proposal has been put forward to add bollarded access in this cut-through from Adam and Eve Street through to Burleigh Street, to avoid rat-running in the area.
Martin Lucas-Smith // 1 thread
The Newtown area (basically between the Botanic Gardens and Lensfield Road on the inner ring road) is a mass of one-way streets, rat-running vehicles, children being dropped off to the schools rather than cycling, and so on.
We should take the opportunity to work with locals to improve the area.
Created by Bracken VanRyssen // 0 threads
The humpback bridge over the stream at this point is highly unsuitable for a well trafficked bicycle route, the design with extremely steep access from both directions as well as areas of mud make the bridge quite a pain to cross. This is especially problematic for bicycles with small wheels or heavy loads, that may struggle with entry and exit of the bridge. An ideal solution would be a longer bridge with gentler slopes to minimise damage to bicycle wheels and smooth out the transition. No doubt this bridge also causes problems for less-able people and represents a significant barrier which is enough of a reason in itself to undertake improvements.
Created by Iain Lane // 2 threads
Press article in the post today: http://www.nottinghampost.com/Major-route-city-centre-overhauled-priority-buses/story-26177322-detail/story.html
Can't find plans just yet.
Martin Lucas-Smith // 1 thread
15/0398/FUL | Erection of student accommodation with 321 student rooms (following demolition of existing buildings), together with ancilliary accommodation comprising common/study rooms, porters lodge, laundry room, plant room, bin and bike enclosures, landscaping and associated infrastructure including a sub-station. | 8, 10 And 10A Cheddars Lane And 351-355 Newmarket Road Cambridge Cambridgeshire CB5 8LD
Usual issues to check out:
- Cycle parking (number, type and positioning)
- Access, in particular need for improvements to Newmarket Road
Created by Colin Wing // 7 threads
This is part of a proposed cycle superhighway from the Finchley Road into Central London.
It will become more attractive after the modification of the Swiss Cottage gyratory system in Camden.
See the discussion threads for details on the sections in Westminster, Camden and Swiss Cottage
Created by Bracken VanRyssen // 0 threads
The cycle path alongside the University of Birmingham campus seems to be a magnet for broken glass, especially in the area opposite the petrol station and Oakfield Road. Avoiding all the broken glass is quite a trial especially for those with less robust tires. Regular sweeping would go a long way towards improving the quality of the route.
The path that runs across the width of Cassiobury Park from Stratford Way to Cassiobury Park Avenue has not been resurfaced since I've been in Watford (13 years). Very poor condition especially in the vicinity of the j/w what seems to be known (on Google Maps) as Central Avenue.
The problem is more than its surface - the path is far too narrow, esp in view of the high use it gets from cyclists and pedestrians.
Created by Kevin Ablitt // 1 thread
It is a constant problem that car drivers think it is acceptable to park in this particular spot.
The single yellow needs upgrading to double yellow lines ( is this enforced anyway ) OR we need hard infrastruture design which prevents such selfish behaviour.
Created by Ian Seeley // 0 threads
There is a tree stump about 3 feet high on the cycle track. It's particularly difficult to see at night when travelling east bound and should be completely removed and the cycle track resurfaced.
The surface of the cycle path, which is also National Cycle Route 1 through Bourne Park is of an extremely poor quality. This really needs to have a smooth tarmac surface, and potentially widened.
I would expect kids to be learning to ride a bike along here, however that's not currently possible as its' touch going for an adult to cycle here never mind a child who is just learning to cycle. If this path is upgraded it would be even better if the surfacing was extended to create a circle around the park which is reasonably smooth, so that people can learn to cycle by cycling around this park.
Created by Donald Noble // 1 thread
A trench has been dug across the cycle path close to the substation, and has not been properly reinstated, leaving a 0.5m wide 5cm deep rut right across the tarmac path,
This should have been reinstated properly at the time, but would be good if it could be fixed soon
Created by Bracken VanRyssen // 1 thread
The pavement and marked cycle path is in pretty bad shape due to root damage and weathering and could really do with some resurfacing. As well as this the numerous side roads and the narrow pavement sections beyond the bus stop create numerous conflict points.
Created by Bracken VanRyssen // 0 threads
Cycle infrastructure is disjointed and confusing, there is no clear and consistent level of infrastructure along the Stratford route. What little infrastructure there is, is mostly made up of narrow shared-use pavements. Unless you approach Shirley High Street from the west (through the park), safe access to the shopping district by bicycle is limited.
Created by Monica Frisch // 2 threads
The site used by Ridgeons (builders' merchants) on Cromwell Road in Cambridge has been identified by Cambridge City Council as a potential location for new housing in the future. As a part of this, Ridgeons and their team of consultants, along with Cambridge City Council, are working to develop a document called the Ridgeons Cromwell Road Development and Planning Brief (Supplementary Planning Document, SPD). This will provide guidance on access, land use, building types, open space and character for all future planning applications on the site.
Created by Stephan Matthiesen // 0 threads
The hill from the Braidburn Inn across Liberton Road up Kirk Brae is very difficult (steep and much traffic).
Cyclists should be allowed to use the pavement from opposite the Braidburn Inn (at the end of the cycle lane), then cross Liberton Rd at the pedestrian lights (to be converted into toucan) and then continue on the pavement up Kirk Brae, at least to the Fire Station.
Dropped kerbs are needed:
- at the end of the cycle lane in Mayfield Road
- at the end of Mayfield Rd, before the lights
- at the bottom of Kirk Brae
- at Double Hedges Row
Many cyclists already use the pavement in this way, but lack of dropped kerbs makes it difficult (and of course it would be better if it's made legal).
Created by Simon Nuttall // 2 threads
The Speedwatch scheme allows the public to get actively involved in monitoring the speed of vehicles travelling through their neighbourhood. It is used in areas where speeding has been identified as a priority at quarterly neighbourhood panel meetings. The scheme is run by the force alongside the Cambridgeshire and Peterborough Road Safety Partnership. It is about educating motorists in the law in relation to speeding and monitoring any trends in speeding in neighbourhoods.
Volunteers are trained to use speed indicator devices which displays vehicle speed. The registered owner of any vehicle seen exceeding the speed limit is sent an advisory letter from their local neighbourhood policing team, explaining that speeding is unacceptable to the local community.
Created by Stephan Matthiesen // 2 threads
Have a new shared path on the Est side of Inch Park, connecting Glenallan Drive, Old Dalkeith Road and Cameron Toll.
This would be a very useful connection that allows cyclists (and pedestrians) to avoid parts of busy Old Dalkeith Road.
There is no real reason why a proper path can't be built there; dog walkers walk along the suggested route all the time (on the grass).
Created by Stephan Matthiesen // 2 threads
There is a strange muddy puddle where the path from Burdiehouse Burn meets the footpath along Burdiehouse Rd., and the right-angle corner is very narrow anyway.
The paths should be connected in a more gentle curve - there is a desire line on top of the wall in the left half of the image.
This is an important point as the footpath does not continue along Burdiehouse Rd northwards, so all cyclists and pedestrians have to walk through the puddle.
From email:
Nottingham City Council (Amesbury Circus Area, Aspley, Nottingham) (Prohibitions of Waiting and Entrance Clearway) Traffic Regulation Order 2015 (TMP 7109)
Please find attached a consultation letter and associated Drawings, Numbers TM/TMP7109 which relates to the above areas, Amesbury Circus Area, Aspley , Nottingham - Traffic Regulation Order (TMP 7109). If you have any concerns in relation to the TRO proposals can you please let me have your comments by 31st March 2015.
Created by Stephan Matthiesen // 3 threads
Create a cycle path on the pavement or make it shared use, from after the bus stop in Liberton Road around the corner to the junction Gordon Terrace/Esslemont Rd.
This would allow cyclists who want to turn left from Liberton Rd towards KB to bypass the traffic lights, then continue onto Gordon terrace or rejoin the other traffic in Esslemont Rd.
Currently it's dangerous because:
(1) this route is uphills and cyclists are going slow, but cars turning left can't see ahead if there are cyclists.
(2) cyclists have to wait at the light and then are in front of cars, so drivers get quite annoyed having to trundle along until safe overtaking is possible in Esslemont Rd, many attempt dangerous overtakes earlier. If cyclists can bypass the red lights they have a chance to go up the difficult bit during quieter phases
(3) cyclists who are not in the ASL (but also those in the ASL) are in danger of being left-hooked (see also http://edinburgh.cyclescape.org/issues/1532-segregate-the-feeder-lane)
Created by Rosie Downes // 11 threads
TfL are consulting on plans for the East-West cycle superhighway in Hyde Park and St James's Park. The proposals can be seen at https://consultations.tfl.gov.uk/cycling/eastwest?cid=cycle-east-west
The LCC office has set up this thread to facilitate discussion in advance of submitting its response to the consultation. The consultation closes on 29th March.
To ensure that your comments will be taken into account when composing LCC’s response please make sure that your registered identity on Cyclescape includes your full name and whether you are a member of LCC and any local LCC group. (You can add these details by clicking on your name at the top of the page and then the Edit Profile tab.)
Ongoing work on the development of the North West Cambridge site results in cycle paths being blocked at random intervals, and inappropriate pedestrian-oriented alternative provision makes the situation more, not less, dangerous for cyclists, forcing us into a narrow roadway with fast-moving traffic. With the increase in heavy traffic, road surface is also deteriorating rapidly - increasing numbers of large potholes, which can easily lead to pinch flats and other mechanical failures on dangerous, narrow sections where lack of cycle path of pedestrian walkway means here is no escape route.
Created by Stephan Matthiesen // 1 thread
Dropped kerb needed at the end of this footpath.
Created by TonyBeaumont // 1 thread
Out side the royal orthopaedic hospital up top 30 cars are parked in the cycle lane every day. Cyclists are forced out into the traffic lane of the A38 over a distance of about 1/4 mile.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.