Crossing Cove Road
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Sarah Wood // 0 threads
At certain times of day it is difficult to cross the road and connect the cycle and pedestrian routes between Southwood and the Cove Brook Greenway
The Greater Anglia franchise is due for renewal in October 2016 and the process has already started. It is quite unsusal to have a station serving such a large number of passengers with access on only one side o the tracks. This situation leads to many more and longer car journeys along Mill Road, Cherry Hinton Road and Hills Road.
There is an existing access via (non-residential) Clifton Road to the east side of the station and there is vacant land. We need to argue the case for an eastern entrance to the station, along with cycle parking and pedestrian access. There is a mainly empty car park on the other side of the tracks. We should also try to include a link from the Carter bridge to the new cycle park.
Interested parties
3 shortlisted franchises
local MPs
Minister responsible (Clare Perry MP)
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by Jon G // 1 thread
The Embankment, Twickenham is a two-way street. Many driver sseem to think it is one-way Westbound. Even the Cyclescape map wrongly marks it as one-way! It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding Eastward along it.
Created by Jon G // 1 thread
Bell Lane is two-way. Most drivers using it go Northward and many seem to think it is one-way that way. It needs signage clarifying it is two-way, to avoid motorists being obstructive or abusive to cyclists lawfully riding South along it.
Created by Jon G // 1 thread
Cricket Lane is a dead end and therefore two-way. Since an exit from a car park was built leading into it, many drivers seem to think it is a one-way street from the car park. In fact it is used by cyclists going in both directions between High St and Bushy Park.
It needs signs clarifying that it is two-way, as drivers are being obstructive or abusive to cyclists legitimately using it.
Created by David K // 1 thread
At present this is a footpath but it could be widened onto the land owned by Network Rail in order to allow a shared use path.
Created by Richard Taylor // 1 thread
Proposal for three new pedestrian and cycle access points to Cambridge Business Park. The proposals are being made in light of the plans for an new station nearby.
Representations from companies with premises on the business park - Redgate and Autonomy - have expressed concerns about security and the potential for people to try and park on the business park and then get on a train.
The proposals are for the new accesses to be gated to restrict general public access.
The proposals include a connection to the potential cycleway along the line of the disused railway.
Cambridge Business Park Cowley Road Cambridge Cambridgeshire CB4 0WZ
Cambridge
Application reference: 15/0919/FUL
Created by Violinist John // 1 thread
Noticed this a couple of weeks ago. As you will see the sign is incomplete and misleading given that the place to see all the details is the end of Ferry Lane waiting to join High Street. High Street at this point is both Route 51 and Route 11.
Major points:
Left turn to go to Impington on Route 51 - I think not.
Abbey and Fen Ditton to the left when you could just go back across Green Dragon bridge.
No directions to Histon, Milton, Waterbeach probably others.
Also the lack of any idea where route 11 goes to the right.
This appears to be one of a number of new signs that have recently appeared. If anyone has seen any more let's get the info out there and try to get them fixed.
Created by Iain Lane // 1 thread
Some new lamp posts have been installed on the pedestrian side of this split ped/cycle path. This reduces the effective width of the path and creates conflict.
Created by Katja Leyendecker // 0 threads
Council is planning changes on parts of Heaton Road
http://www.newcastle.gov.uk/parking-roads-and-transport/cycling/strategic-cycle-routes/improvements-heaton-road
Discuss your thoughts and ideas here!
Created by Roxanne (CEO) // 3 threads
Relocation of the existing liquid nitrogen (LN2) tank, Denios unit and cycle parking facilities.
Department Of Chemistry Lensfield Road Cambridge Cambridgeshire CB2 1EW
Cambridge
Application reference: 15/0988/FUL
NOTE:
Introduction of two tiered cycle parking to maintain the same number of parking spaces.
Richard G // 1 thread
A new research institute is planned for the Addenbrookes campus, plans are due to be submitted within a few weeks
There has been a exhibition of the overall plan & I have concerns about the cycle parking provision
Just wanted to report a collision on 1/6/15 at about 1700 between myself and a car in Cambridge.
Travelling South on Trumpington Road, turning into Fens Causeway I was hit by a car travelling North at the roundabout. There are three lanes of traffic heading north, the outmost car gave way correctly but the car in the second lane for whatever reason chose to accelerate onto the roundabout and hit me square on. I heard the noise of a revving engine, turned and watched the car drive straight into me. I felt the bonnet of the car as it hit and heard the sound of the impact, have a vague recollection about spinning through the air then hitting the tarmac. Although I was wearing a helmet it didn't help as I landed on my right buttock, back and leg.
Fortunately there were several witnesses including medically trained people who left their cars to help; the driver of the car involved remained in his car.
The police took about 25 minutes to arrive and the ambulance about 10 minutes after that.
I have nothing but praise for everyone who stopped and helped, the police, the paramedics and the A&E staff at Addenbrookes. The driver of the car knows what I think of him as I was quite vocal when he tried to get involved. He apparently told the police that I had 'cut the corner' of the roundabout. I'm not sure what he meant by this, nor was the police officer.
I count myself very lucky. Although I've been off work since the collision, I have no broken bones - just serious bruising, a lot of pain in my back and hip which I'm assuming will go away eventually. The ironic thing is that I'd been cycling from Melbourn to Hills Road since the previous week up and down the A10, and had decided to try a different route over Chapel Hill as I thought it might be safer.
I'm curious though, does this junction not have a history of collisions? I can recall seeing at least one there myself in the past. What is the recommended route for cyclists travelling this route?
I took the advice of the Campaign website and contacted Cycleaid for legal advice. I'll report back the outcome as things progress if anyone is interested.
BTW not sure how to draw a route on the map AND mark the collision point, so I've just done the latter.
By-election for the Romsey Division in June 2015
Martin Lucas-Smith // 1 thread
The University has published initial plans for a Masterplan for the West Cambridge site, which will see further extension towards the M11.
https://www.admin.cam.ac.uk/reporter/2014-15/weekly/6387/section6.shtml#heading2-11
Created by Robin Heydon // 1 thread
Extension to foodstore
ALDI Unit 1 157 Histon Road Cambridge Cambridgeshire CB4 3JD
Cambridge
Application reference: 15/0914/FUL
Created by Shaun McDonald // 1 thread
There is a footpath linking London Road to Columbine Gardens and Lupin Road, which has a series of barriers. Removing the barriers, ensuring there are dropped kerbs are on Columbine Gardens and Cowslip Close. Signs need to be added to sign post the route to the town centre, London Road, and appropriate other places.
This would mean that there would be direct link from Chantry on to London Road and into town along a potentially safer route than Gippeswk Avenue/Birkfield Drive.
Created by Rosie Downes // 1 thread
First consultation on the main scheme: 26 May to 31 July 2015
Second consultation on amendments to the scheme: 22 February to 20 March 2016
Created by Shaun McDonald // 1 thread
The A92 here has some very fast traffic. Considering this is the flagship National Cycle Route 1, and there is already a cycle path of part of the way between these 2 junctions. It would be much better if this cycle path was continued to the next junction, with some crossing aid in the form of traffic lights, bridge or tunnel. This would open this part of the route to a wider range of participants, as it would be significantly safer.
Created by Al Storer // 2 threads
The County Council have launched an initial consultation on improvements to Queen Edith's Way and Cherry Hinton Road (Hills Road to Mowbray Road). Very positively, what they're asking about is separated cycling facilities and bus stop bypasses. The devil will be in the detail as always, but the principle is good
http://www.cambridgeshire.gov.uk/site/custom_scripts/cons_details.aspx?ref=367
Created by Ross // 1 thread
Richmond Hiil and Ormond Road provide direct routes into Richmond town centre. However they are one way and force cyclists to take detours to get into town. Making these roads 2 way for cycling with contraflow cycle lanes would improve movement for cycles and remove some conflict which exists where cyclists ride on the pavement.
Created by Ross // 1 thread
Cycling around Richmond town centre is tortuous on a bicycle due to the one way system. To encourage even greater cycling journeys to Richmond town centre business the one way system should be redesigned to allow 2 way cycling for bicycles on Eton Street, Paradise Road and George Street. Ideally this should be achieved with segregated cycle contraflows
Created by Ross // 1 thread
Make Priests Bridge in Barnes - 2 way for cycling. Facilitate easier and shorter cycle journeys and link more effectively into LCN 37 and 4. Encourage cycle traffic of the busy A205.
Created by Rohan Wilson // 1 thread
Sustrans invites comments by 30 June on its draft chapters of a "Cycle-friendly Design Manual".
This document, once published, could influence local authorities to provide better, safer cycle routes, and so persuade people who are not yet cycling their every day journeys to do so.
Your comments please to designandconstruction@sustrans.org.uk by 30 June.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Heather Coleman // 1 thread
I've noticed a few of these around Cambridge where there's a "no through road" sign but it's a through road for cyclists and pedestrians. As there's a post already, if the council had a ready-made stock of plates saying "except cycles", "except pedestrians", a single operative could affix the plate below the sign to made it correct. It is highly deceptive and not serving those using non-motorised transport if they go the long way round not realising they can get through a quicker route.
Created by Gregory Williams // 0 threads
Much of the route of the former Elham Valley Railway has not been constructed on. This would make an ideal long-distance cycle path.
Created by Donald Noble // 0 threads
It would be useful to have signage at this location to show the route onto the cycle path. Coming north along Lochend Road from the A8/Airport it is not clear that you need to head into the treatment works access road to see the path leading onto the main cycle path.
Created by M Stanley // 1 thread
Leeds City Council are proposing major changes to the gyratory. The stated aim is to increase motor vehicle capacity at the junction which will in turn allow the removal of general motor traffic from areas of the city centre such as city square.
Created by Jon G // 1 thread
The road outside the Barmy Arms pub, Twickenham Embankment, used to be closed to motor traffic by a single line of posts with cycle logos painted on the road between two of these, clearly showing there is a cycle route there.
Recently this has been replaced with two lines of posts about 3m apart and there are no cycle route markers. This is leading pedestrians to reasonably assume that the area between the posts is for pedestrians only and to stand there in groups with drinks from the pub, creating conflicts with cyclists trying to ride through the area. The existence of the cycle route should once again be indicated by signs or painted cycle symbols.
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Anon // 1 thread
Wandsworth Council in TMO 1644 propose removing the contra-flow segregated cycle track at the eastern end of Putney Embankment to allow a hoarding to be built around the Thames Tideway tunnel construction site. The track will be re-opened when the work is complete, but this could take at least a year. It is proposed that eastbound cyclists join the Upper Richmond road by the Dukes Head pub and then continue on this road. Wandsworth Cycling Campaign objected to this on the grounds that the Upper Richmond Road is extremely heavily trafficked and the proposed diversion involved cycling past a row pf parking bays . This would be very difficult and hazardous for the mix of cyclists using the Thames Path of which this forms part. We asked that the parking bays be temporarily removed and replaced by a 1.5 to 2 m cycle lane separated from the motor traffic by wands or similar. For west-bound cyclists using the narrow lane left on Putney Embankment past the work site, we asked for the installation of 'Do not overtake cyclists' signs.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Gipsy Hill // 2 threads
Introduction:
Quietway7 links a cycle route from Elephant & Castle (E&C) with Crystal Palace, and was routed by TfL to be via Dulwich Village, West Norwood (Thurlow Park Road), Gipsy Hill and then Crystal Palace (via Farquhar Road).
The route from E&C southbound is in Southwark (to Dulwich) then is in Lambeth (Turney Road, Rosendale Road/Thurlow Park Road, Hamilton Road, to Gipsy Hill), then goes back into Southwark (from Gipsy Hill to Crystal Palace). Southwark had their part of the quietway consultation approved.
Lambeth delayed their decision to June 2017, and was then subsequently “called in” as there was widespread concerns from both the local community and cycling groups for parts of the route. Cycling groups unanimously objected to the proposed design along Gipsy Hill by: Southwark Cyclists, Lambeth Cyclists and Wheels for Wellbeing. 70% of respondents objected to the the design on Gipsy Hill. Gipsy Hill is a busy Local Distributor Road and bus route. Gipsy Hill has “insufficient road width” for a segregated track. The original proposed design meant motor vehicles “will encroach on the advisory cycle lane” to allow oncoming motor vehicles to pass.
Gipsy Hill Options:
There are alterative options to avoid Gipsy Hill. Southwark Cyclists have supported the design option to follow LCN23 downhill all the way along Dulwich Wood Avenue and then using the other side of Long Meadow (so not using Gipsy Hill), with a new track behind the bus stop.
See navy dashed line on sketch attached (mauve was the proposed Q7 design, red is LCN23)
This design is quieter and safer than using Gipsy Hill, and avoids the proposed dangerous junction Gipsy Hill/ Dulwich Wood Avenue, near the rail station. This integrated design also allows greatest cycle access to local amenities, schools, shops, and parks in Dulwich, West Dulwich and West Norwood. There is interest and outline support from Southwark to explore this option.
Next Steps:
Lambeth are now actively progressing engagement and revised designs for their part of the route, with a new consultation process due in September. There is potential for an improved option at Gipsy Hill, but this is likely to need new additional funding from TfL.
Suggested, to let local Gipsy Hill Ward Cllrs (Lambeth) and College Ward Cllrs (Southwark) and local cycling groups know your views.
Background:
Lambeth proposal that was called-in, see reports:
- Quietway 7 - Elephand Castle to Crystal Palace - Decision Report – 12 June 2017
- Appendix B - Quietway 7 - details designs (Gipsy Hill pages: 23, 46-49)
http://www.cpneighbours.org/gipsyhillquietway/
Thurlow Park Ward Cllr updates:
http://thurlowparklabour.org/post/162548844962/quietways-engagement-next-steps
TfL Quietway 7 Programme (Elephant & Castle to Crystal Palace) - Proposed changes in Lambeth - West Dulwich area
https://consultations.tfl.gov.uk/cycling/lambeth-q7-wd/
LCN23 Map:
https://www.openstreetmap.org/relation/2707#map=17/51.42643/-0.08336
What are Quietway?
London Cycling Design Standards, Chapter 1 (page 15):
Quietways “..are aimed at new cyclists who want a safe, unthreatening experience.” The key principles for Quietways include:
o Routes should be on the quietest available roads consistent with directness;
o Routes should be as straight and direct as possible;
o where they have to join busier roads, or pass through busy, complicated junctions, segregation must be provided;
http://content.tfl.gov.uk/lcds-chapter1-designrequirements.pdf
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3