Route across Peckforton Hill (NCN45) at risk
NCN45 across Peckforton Hill at risk of being closed
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
NCN45 across Peckforton Hill at risk of being closed
Created by tomguha // 1 thread
Cycle lane on Tooting High Street often blocked by cars
Created by Jim Chisholm // 1 thread
The traffic lights in Gt Shelford (Freestones Corner) are being replaced.
They've already done the DDA compliant paving and the cabling for the new lights is I believe done.
There may be an opportunity for ASBs and approach lanes on at least one of the A1301 approaches. Often motor vehicles turn left across those on cycles with only some 50% of left turning traffic correctly indicating
Created by Tim P // 1 thread
Portsdown Hill Road & James Callaghan drive are a set of roads along the top of Portsdown Hill that is currently used by a lot of cyclists for commuting, touring and leisure facilties due to the forts, views and open areas around it.
As such, it's a well known tourist spot to stop for a burger or take a picnic and fly a kite.
However, being on top of an exposed hill results in significant side winds which results in cyclists being blown about by gusts, and therefore all cyclists need to take primary position on this road to give them space. As a 40mph road, many drivers have significant issues with cyclists taking primary, and therefore perform many punishment/close passes.
The affect of this on cycling in the area is many
1) More people would cycle from the surrounding areas ( Waterlooville, Havant, Fareham/Lee on Solent ) to work at QA Hospital or the businesses on the hill if there were better cycle infrastructure.
2) More people would cycle from the surrounding area & to enjoy the space & views if it felt safer to get there.
Created by Tim P // 1 thread
The current A3 route through Purbrook is very dangerous both northbound and Southbound.
From both directions, there are shared Bus/Cycle lanes, which approaching from the south stop at the roundabout, and from the north stop at the traffic lights before it.
When traveling Northbound, the uphill section past the shops results in a slower moving cyclist, generally holding up Traffic, which causes lots of aggressive, close overtakes, which in a narrow road when "sharing" with HGV's and buses, is not a pleasant experience. Many cyclists therefore jump onto the pavement if feeling unsafe, or do not cycle this section.
When travelling southbound, most of the time the traffic is slow due to queuing for the roundabout, but the narrow, on route cycle route squeezes cyclists between parked cars and slowly moving traffic, directly in the door zone.
Given the remainder of the A3 Portsmouth/London Road corridor is of signficicant benefit to those that commute from Denmead/Waterlooville/Clanfield area towards Portsmouth, this is a real bug bear.
Created by Roxanne (CEO) // 1 thread
Demolition of an existing sports pavilion, erection of a new sports pavilion, alterations to an existing car park and a vehicular access, a cycle shelter, new flood-lit artificial surfaced sports pitches and associated soft and hard landscaping.
St Marys School Playing Field Long Road Cambridge CB2 8PX
From the Design & Access Statement:
9.4 Cycle Parking
The Cambridge City County Local Plan 2006 Appendix D obligates schools to provide 50% of cycle spaces for children aged 5 to 12 and 75% for children over 12 years old. Under the same Local Plan, the college is obligated to provide cycle spaces for all students plus 1 for every 2 members of the staff.
The proposed pavilion will provide a changing space for maximum 4 teams of 20 players plus 2 staff each, therefore we declare to provide cycle stands for a minimum of 84 bikes.
Current site layout allows for 62 cycle spaces under roof canopy and 64 uncovered stands, therefore exceeds the minimum requirement defined in the Local Plan.
Created by Roxanne (CEO) // 1 thread
Erection of dwelling following demolition of existing triple garage block. New vehicular access from highway to serve existing dwelling.
4 Cavendish Avenue Cambridge Cambridgeshire CB1 7US
House includes a combined bin and cycle store for three cycles. The space indicated on the drawing does not appear big enough for both bins and cycles. I question whether providing for three cycles is enough considering there is room for at least two cars.
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by Roxanne (CEO) // 1 thread
Redevelopment of St John's Innovation Centre.
Not sure how this application was missed. But we should be aware of what is going on here. There are a few conditions pending consideration which may provide an opening to make comment if we determine the need.
There is a lot of sheltered cycle parking of both two-tier and Sheffield stand variety in several locations around the site.
Created by Roxanne (CEO) // 1 thread
Erection of 25 dwellings including 40% affordable along with access, car and cycle parking and associated landscaping
Land at Belsar Farm, Willingham
http://plan.scambs.gov.uk/swiftlg/apas/run/WPHAPPDETAIL.DisplayUrl?theApnID=S/3145/16/FL
South Cambridgeshire
Application reference : S/3145/16/FL
Created by Monica Frisch // 8 threads
Cycle routes and cycle paths need maintenance. This issue is somewhere to raise matters relating to standards of path maintenance, problems of poor maintenance, and examples of good maintenance.
Created by Ian Dent // 0 threads
There is developer interest in building houses on the existing arable land. Lime Lane (west end) is currently completely unsuitable for cycling. East End with off road cycle route is good. The developer should be encouraged to extend the existing cycle route parallel to Lime Lane to the junction with A608 and then, using a suitable crossing, to NCN.
Created by Cycling Dumfries // 1 thread
It's possible to get to the new shared-use path near the High School from the Caledonian Cycleway/ St Mary's Industrial Estate / Edinburgh Road using cut throughs and back streets but it's not at all clear. A couple of signs on the corner of the Moffat Road / Carnegie St, Greystone Crescent, and the Edinburgh Road and St Mary's Road path entrances, plus a fingerpost at the junction of the three paths at the foot of the Caledonian Cycleway would be really helpful to make the most of this developing off-road network
Created by Cycling Dumfries // 1 thread
Torthorwald is only a couple of miles from Dumfries but very few people are willing to cycle on the Lockerbie Road/ A709. An off-road path running parallel to the road down to Heathhall forest would connect up with the Caledonian Cycleway and provide an accessible route into town.
Created by Colin Wing // 1 thread
Proposal for the introduction of two-way traffic operations on Brook street (between Bond Street and Grosvenor Square) and Davies Street (between Brook Street and Berkeley Square)).
Created by goodlegs // 1 thread
More than once I have been waiting at Warburton Road as it meets Mare Street for a break in traffic so that I can cross to Tudor Road (which is filtered for motor traffic so a nice way to reach Victoria Park) when a car behind me has been very agressive. On one occasion I was "nudged" by the driver literally driving into my back wheel.
I think the aggression stems from:
a) drivers using this route precisely because they are in a hurry / rat running to avoid the traffic lights on Mare Street, so not being willing to be held up
b) drivers not understanding "why doesn't he go?" when it would have been possible for me to turn left (as the driver wants to). I need enough clear space on both sides of the road to go straight across.
Created by MJR // 1 thread
This area is proposed for development. It is of strategic interest because access will almost certainly cross National Route 1 and it would be good to have very good cycling connectivity to avoid adding unnecessary cars to the roads in this area.
Created by jpennycook // 2 threads
Outline application for up to 150 new homes and to include access
Land At Redlands Reading Road Sherfield-on-Loddon Hampshire RG27 9EA
Basingstoke
Application reference : 16/02457/OUT
Created by George Reeves // 0 threads
This is pointless and dangerous ASL it encourages cyclists to squeeze between large vehicles(anything transit van and above) There is the added danger of the railing a relic from when a secondary school stood on this corner.
Created by M Stanley // 1 thread
Message from Cycling UK:
It has been brought to Cycling UK’s attention that an exciting new bicycle project is under consultation in your local area of Leeds, which would benefit from supportive comments from local cyclists.
You can submit your comments up until the 16th December.
The project is the conversion of a Local Authority owned golf course (Middleton Park Golf Course ) into Leeds Urban Bike Park. The vision is that the Bike Park will eventually comprise a number of progressive trails for all levels of cyclist, plus BMX and play tracks, together with a community building providing a café, bike hire and maintenance facilities and other community use spaces.
It is proposed that the facility will be operated and managed by Cycle Pathways, a Community Interest Company Limited by guarantee.
Cycling UK would like to thank you in advance for taking time to submit your comments on this wonderful project proposal in Leeds.
Respond to the planning application:
Full details and documents:
Created by Roxanne (CEO) // 1 thread
Erection of extensions to Norfolk Building for common room, 16 student rooms, college offices and research space, cafe and kitchens; erection of 6 family accommodation units; landscaping and cycle parking following demolition of maisonettes.
St Edmunds College Mount Pleasant Cambridge CB3 0BN
"The College currently has 304 cycle parking spaces that includes 146 Sheffield hoops providing 292 spaces and 12 single V stands. The current proposal is to add a further 22 Sheffield hoops under a cycle shelter providing a total of 348 cycle spaces."
Created by Roxanne (CEO) // 1 thread
The proposal comprises the conversion of the existing end terrace known as No.48 New Square and will comprise of 3No. self-contained flats, the demolition of the existing garage and the erection of 1No. self-contained studio-flat and the removal of 4No. Parking bays accessed via Willow Walk and the erection of 1No. self-contained flat. All with associated landscaping and access arrangements.
48 New Square Cambridge Cambridgeshire CB1 1EZ
" Cycle Parking
Cycle parking has been designed in accordance with the Council’s current standards - Cycle Parking in Residential Developments (2010). The new flats are to be provided with a communal covered and secure cycle store within the building fronting Willow Walk. Access will be solely via New Square through the communal garden.
The store will be fitted with steel Sheffield cycle stands spaced in accordance with Diagram 3 of the above guide. Access gates are to be a minimum of 1m in width where required, and fitted with mortise locks."
Created by Roxanne (CEO) // 1 thread
Change of use of HMO and takeaway to a three storey rear extension, and roof extension to form 3no new flats. New rear annexe to create a further 2no flats.
61 Norfolk Street Cambridge Cambridgeshire CB1 2LD
Application reference : 16/1916/FUL
Very little description of cycle parking. The drawings look like "wheel-benders". Only 9 spaces.
"The area will consist of a grass area and the planting of a central tree. Footpaths provide access the rear building and to the proposed cycle stand."
"Access to the ground floor flat to 61 Norfolk Street is via an existing entrance door. Access to the rear courtyard, bin store and cycle stand is via a newly formed security gate and passage at ground floor level."
Created by Roxanne (CEO) // 1 thread
Erection of 3.No four bed houses, internal access road, car and cycle parking, hard and soft landscaping.
Land Rear Of 268 Queen Ediths Way Cambridge CB1 8NL
Application reference : 16/1919/FUL
"CYCLE PARKING
Cycle parking has been designed in accordance with the Council’s current standards - Cycle Parking Guide for New Residential Developments (2010). The new dwellings are to be provided with cycle storage within the integral carport. This is of sufficient size to accommodate a total of at least 4 cycles."
Created by Sam Wakeling // 0 threads
Through traffic drives along South Road and goes down Parsonage Crescent as a short-cut to access Walkley Bank Road rather than going down to the turn opposite The Florist.
On an evening peak this is done by about 1/3 of all the outbound traffic on South Road (220 out of 670 motor vehicles per hour). In the evening peak cycle traffic is almost exclusively outbound, with 87% using this route from South Road and down Parsonage Crescent.
Stopping motor access to the top of Parsonage Crescent would remove traffic from this narrow residential street and also create a safe and convenient way for people cycling to access South Road up from the Rivelin direction without needing to cycle up Walkley Road, crossing the difficult turn at The Florist, which has heavy traffic and no protected space.
As with all routing of motor traffic away from a route of maximum convenience it should show some level of traffic evaporation from the area. The current pedestrian crossing on this arm could be removed as no motor traffic would have to be crossed.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.