12/0724/FUL Rosemary Branch redevelopment
This is a proposal to demolish the existing (but now closed) Rosemary Branch pub and replace it with eight houses and two flats.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
This is a proposal to demolish the existing (but now closed) Rosemary Branch pub and replace it with eight houses and two flats.
Created by Rohan Wilson // 1 thread
Planning application here. Access issues need checking.
Created by Gregory Williams // 1 thread
A cycle link is needed to Barton Court Grammar School in order to give the school students and staff a viable means of reaching school.
Created by Gregory Williams // 1 thread
Cyclists need to walk for a short distance to follow NCR2 next to the Prince of Wales Roundabout if they wish to avoid using the A20 on the roundabout.
Created by Gregory Williams // 1 thread
The A2 is a hostile environment for cycling. Cyclists should be directed away from using the A2 towards existing safe alternatives (e.g. RCR16) and the current A2 cycle signs should be removed.
Martin Lucas-Smith // 13 threads
Formal policies on health, with mention of cycling, need to be improved as a way of providing an additional tool to be used in transport and planning.
Martin Lucas-Smith // 33 threads
Collisions, 'accidents' and even occasional deaths involving cyclists remain an issue in Cambridge.
This Cyclescape issue is so we can collect the reports and debate approaches to tackling this issue through the media and through policy objectives.
There are a range of issues regarding cyclists breaking the law in Cambridge. This issue is intended as a container for strategic discussion of how this can be resolved.
There are of course many problems with drivers breaking the law, and discussions need to be in that context also, but this is issue is primarily for addressing the cycling side.
Created by Simon Nuttall // 5 threads
Cycle parking has long been a problem in the Romsey and Petersfield areas, mainly because of lack of proper provision.
Martin Lucas-Smith // 1 thread
The proposal is for demolition of the existing non residential language
school and replacement with new with on site accommodation for students. Cycle parking needs to be checked.
Martin Lucas-Smith // 1 thread
The Regent Street crossing has been upgraded. How are people finding it?
Martin Lucas-Smith // 1 thread
80-cycle prefab shed using sheffield stands, replaces 7 car spaces. Need to check the application and welcome it if this is as positive as it sounds.
Created by Heather Coleman // 2 threads
This is a planning application variation for 42 Fen Road, Milton. Application no (south cambs) is S/0756/12/VC
Permission had been given, but I noted as I passed the other day, that there was an application for a variation. Looking at this, one item seems to be to vary the "cycle storage".
From the description in Addendum to Design, Access & Herigage Statement in plans and docs:
I quote
"The bin / cycle store has been relocated and enlarged to allow for a tool shed. It was felt that
the proximity of the previous store to the proposed dwelling had an adverse impact on the
street scene and cluttered up the entrance area. By setting it back within the garden space it
was felt this would positively enhance the character of the area. Additionally, as a temporary
structure it is felt this would not have any more of an impact on the surrounding trees than
the current position of the bin store."
Or if you look at the map, the cycle "storage" (should that be parking?) now appears to be round the back end of the garden, and as a hedge is shown surrounding the car parked at the front of the property, I am at a loss as to how it would be at all convenient to ever get a bike out of this shed, rather than just getting into the car.
Of note is the fact that this proposed house is about 15 yards off NCN 11. In one direction*; this gives a virtually traffic-free route almost into Cambridge city centre or to Waterbeach railway station. In the other direction, NCN 11 heads through Milton Country Park, leading almost directly to the local Tesco superstore as well as to the Coston bridge, Science Park, Guided Busway. Thus, it could be possible to live an almost entirely car-free existence at this location.
*Fen Road is erroneously described as a cul-de-sac in the application. It is to motor vehicles, but is in fact a through route to the city centre for cycles and pedestrians.
From the 2004 South Cambs local plan
"To promote the use of more sustainable modes of transport, such as public transport,
walking and cycling by making such modes more accessible, safer and more attractive
to use.," and "To promote sustainable travel by ensuring new development takes place in highly
accessible locations."
" To limit the amount of car parking provided in new developments, where appropriate,
to reduce over-reliance on the car." "adopting on-site and/or off-site design features that promote
access by non-car modes as far as practicable (including
walking and cycling) and facilitate and encourage their use"
Of course there appears to be nothing about accessibility of cycle parking cf car parking, unlike the City Council local plan.
Is it worth putting in an objection? The publicity end date is 5th June.
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by velocipedus@gmail.com // 2 threads
Access to and return journey from the Crematorium is a real challenge for the cyclist. Indeed, chances are you may end up in it if you try to ride your bike there.
Here we have a essential public service which is accessible by car only. Is this acceptable ?
These issues arise also if a convoy of bicycles was to accompany a coffin.
What is to be done?
http://www.cambridge.gov.uk/ccm/content/contact-us/council-buildings/crematorium.en
Created by David Earl // 1 thread
Application to build a bridge over the brook to provide rear foot/cycle access to the school.
Martin Lucas-Smith // 1 thread
Speeding can be a problem on Granchester Road.
Created by Rohan Wilson // 1 thread
Existing building to be rearranged internally for surgery and medical admin. There is locked-away cycle parking for staff (quantity not spec), but none proposed for patients/ visitors. See thread for Sustrans' objection.
Created by Rohan Wilson // 10 threads
Turnstone, a consortium, is hoping to build a new town, to be named Denny St Francis, adjacent to Waterbeach (the barracks site, plus). Like any large development, cycling conditions need to be good.
Converting one-way streets to two-way cycling has long been a Cambridge Cycling Campaign priority.
Progress has been made, with Hope Street being made into a two-way street with a no motor vehicles exemption at one end.
Now that Except Cycles signs under No Entry signs are permitted there is scope for extending this to Romsey Streets.
Created by Klaas Brümann // 1 thread
South Cam is working on a cycling project between Haslingfield and Grantchester, proposed by the Haslingfield Parish.
Martin Lucas-Smith // 1 thread
The Cambridge East development is in the 2006 Cambridge Local Plan and would have a big effect on cycling and traffic more generally in the area.
Martin Lucas-Smith // 1 thread
The City Council will be designating Sheep's Green & Coe Fen as a local nature reserve in 2012, in recognition of the site’s value for both wildlife and recreation.
As part of the process, a management plan has been prepared to establish a long-term vision for the site and to guide ongoing maintenance and habitat-restoration works.
They are seeking public comments on the draft plan, prior to formal adoption and designation of the site.
It is important that the proposals are scrutinised to check whether this will have any effects in the longer term on cycling and path improvements.
Martin Lucas-Smith // 1 thread
Now that the East Road gas works have finished, the road has been patched up, but in a very bumpy way. Although the tarmac is smooth, it is not at the same height as the original road so riding along is continually bumpy.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."