Cycle parking needed for Zealand Road shops
Cycle parking is needed to serve the parade of shops on Zealand Road. This will encourage people to cycle to the shops and provide a secure means for locking bicycles.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Gregory Williams // 0 threads
Cycle parking is needed to serve the parade of shops on Zealand Road. This will encourage people to cycle to the shops and provide a secure means for locking bicycles.
Created by Shaun McDonald // 1 thread
When you are exiting the station forecourt from Ipswich station, it doesn't detect cyclists, thus never turns green for cyclists if there are no cars trying to exit at the same time.
Created by Andrew Woodward // 0 threads
Railway footbridge should have a ramp/trough added to make it easier for cyclists to cross the railway. This would then create a quiet north/south route to Marshgate school as an alternative to Manor Road.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Andrew Woodward // 0 threads
Pinch-point at zebra crossing where cyclists are forced to share space with traffic that is often speeding. Cars try to squeeze past cyclists or brake suddenly.
Created by Shaun McDonald // 0 threads
On passing on Saturday I noticed that Lewisham have moved the block point of Verner Road to the junction, however this seems to have added and obstruction for cyclists. It could be that once the work is complete it will no longer be an issue as from the other side there is a dropped kerb.
Note in the photo the signage of the cycle route on the lamppost on the left.
Created by Jim Chisholm // 1 thread
A set of TROs at various locations have just been announce for consaltation
Created by Klaas Brümann // 1 thread
Consultation on implementing no waiting areas on Woodhead Drive.
Created by Shaun McDonald // 1 thread
Bricklayers Arms Roundabout – Subway Closure
Overview
Transport for London (TfL) is proposing to make changes to the roundabout to improve personal safety for people crossing the junction.
In June 2012 a pedestrian survey of the footway and subway system was carried out. The survey showed that between 50-70 crossing movements are made through each of the subway bores between 7am-7pm, with the majority of people preferring to use the crossings at ground level. A key factor in this is the design of the central island and subway network, which attracts crime and anti-social behaviour
The main scope of the work being proposed is to block up the subways and improve the crossings at street level. Further detail is outlined below and on the attached plan:
Decommissioning and infilling of the subway bores, ramps and stairs;
Re-paving of the perimeter footways.
Providing a new street level crossing facility to increase accessibility to the northeast corner (Tower Bridge Road) of the roundabout.
Removal of the concrete wall which surrounds the roundabout.
Improved street lighting.
Retention of mature trees and new tree planting.
The subway closure works are programmed to commence from mid-February.
If you have any questions or comments about these proposals please contact us by 8 February 2013.
https://consultations.tfl.gov.uk/streets/bricklayersarms/consult_view
Martin Lucas-Smith // 1 thread
A cyclist was convicted in this location whose pavement provision is poor, inconsistent and badly maintained.
Background at:
http://www.rtaylor.co.uk/anti-social-cycling-north-cambridge.html#comment-75411
Created by David Wilcox // 0 threads
The Foresters Arms in Westbury on Trym in Bristol is being converted to a Tesco Express.
The Council want to change the waiting restrictions by a whole one metre!
http://www.bristol.gov.uk/page/transport-and-streets/traffic-regulation-orders-tros#jump-link-3
"It is proposed that the current prohibition of waiting at any time (indicated by double yellow lines) on the south west side of Westbury Hill, which currently terminates in line with the common boundary line of numbers 73 and 75 Westbury Hill, should be extended by one metre in a south easterly direction. Delivery vehicles are permitted to wait on yellow lines while goods are being loaded or unloaded and the proposal is intended to provide vehicles being used to make deliveries to the new supermarket with sufficient space to pull in close to the kerb, to minimise interference with the movement of other traffic."
Since this will have a minimal effect on the ease of delivery to the Tesco's - remember most Articulated Lorries are 13- 16 Metres in length
http://www.intelligentanswers.co.uk/index.php?topic=2851.0
Why bother changing anything?
Looking at the google street view pic attached, parking an Artic on this road will cause major disruption and be a safety issue for the pedestrian crossing on the mini roundabout.
I wonder what the cost of raising a TRO for one metre change in parking restrictions is?
Created by WillC // 0 threads
A65 in Rawdon is wide with few side roads. It needs cycle lanes. Southbound in morning staggered queuing traffic makes if hard to wiggle down to the ring road roundabout. There is ample width and no reason not to add cycle lanes. Ther are however 3 pinch points associated with middle pestrian refuges that are dangerous. There are cut-outs into pavement area to apparenlty widen the road here but the cut-outs are very poorly surfaced and unusable. Vehicles passing cyclists at the pinch-points regularly cause danger (personally experienced several times a week, one very nearly fatally).
Created by David Wilcox // 1 thread
The junction of Wade Street and Lamb Street used to have a dedicated segregated cycle lane to enable cyclists to turn right (against the traffic on the one way Lamb Street) via a pedestrian Pelican crossing to get to the Park opposite. This park has connections to the Bristol 2 Bath Railway Path and Temple Meads.
Speaking to the Council Officer at the cycle forum on 17/01/2013, It seems that this road layout is changing. Cyclists will be able to join the widened pavement much earlier on Wade Street to cross at the Pelican Crossing. This will cut down on collisions with cyclists having to cross the traffic at the junction.
The work was not subject to a normal Council Consultation as much of the work is being done by Wessex Water who are laying some pipes in the area. Changing this junction would of cost in the of £150k and the council are only being charged £5k for the work.
No final details are available for the junction layout, so we need to keep an eye on this junction
Created by velocipedus@gmail.com // 2 threads
Partnerships and Alliances holds threads related to specific groups and constituencies
Martin Lucas-Smith // 2 threads
[Moved from another unrelated issue]
Michael Cahn writes:
"During the meeting with Public Health earlier this month, there was interest from officials when we raised the idea of a bike program in their Fenland focus area. I have now received a list of postcodes (PE13, PE15, PE16, PE7) and intend to see if we happen to have any members there, who could become the natural seed pod for a bicycle intervention program in their area, or advise on specific opportunities there."
Martin Lucas-Smith // 1 thread
[This issue moved from another unrelated thread]
We have heard there is interest in set up a cycling group in Bury. The initial focus of the person making contact is a better connection between Horringer and BSE.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by David Wilcox // 1 thread
Proposal
To provide a shared use facility on St Phillips Road that links the Toucan Crossing on Midland Road with the Bristol Bath Railway Path. The route will then continue on a traffic calmed Horton Street
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. With this volume of traffic using the path, it is unsatisfactory that users are channelled into St Philips Road into a busy industrial estate. Since the bus priority measures on West Street and Old Market on the A420 corridor, there has been an increase in private motor vehicles using St Philips Road as a rat-run causing conflict with the volume of cycle traffic. The end journey for users of the Railway Path acts as a barrier to new cyclists.
An improved link form the railway path to Temple Meads would help achieve the Local Enterprise Site aims for sustainable transport and will help to provide for the 17,000 employees at the site.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 3 threads
Proposal
To investigate options to provide a safe, continuous route from St James Barton Roundabout to the top of Park Street.
Rationale
Marlborough Street/Upper Maudlin Street/Perry Road/Park Row (known as the Scope Route) is the most desirable route for cyclists from the east of the city to the University, the Triangle, Clifton etc but is heavily trafficked with little cycle provision.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 0 threads
Proposal
Improve the public realm of Old Market
Rationale
Old Market functions as the primary eastern entrance and maintains one of the most important historical collections of historic buildings in the city. Its unique character, central location and distinct identity make it an ideal place for regeneration. To encourage investment and regeneration, a scheme is proposed which seeks a reworking of the buses to provide stops at the edge of the street along with wider footpaths, cycle facilities and de-cluttering of signage and lining and a higher quality public realm.
Part of the 2013 Bristol City Council LSTF proposals.
Proposal
To investigate the purchase of land adjacent to the Bristol Bath Railway Path (BBRP) to provide a link to the Dings Railway Path which connects to Temple Meads station.
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The current link to Bristol Temple Meads is via St Phillips Road and Horton Street, both of which can be heavily trafficked with vehicles travelling at speed. A continuation of an off road route into Temple Meads would be very popular and help achieve the Local Enterprise Site aims for sustainable transport.
Part of the 2013 Bristol City Council LSTF proposals.
Proposal
To investigate the purchase of land of the Car Park of the VOSA building adjacent to the Bristol Bath Railway Path (BBRP).
Rationale
The BBRP is one of Britain’s busiest off-road pedestrian and cycle paths with over 5000 people using it daily. The path narrows at its approach (inbound) to the Lawrence Hill underpass, resulting in an uncomfortable experience for path users. Purchase of the VOSA car park would allow the path to be widened through this section.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 0 threads
Proposal
To widen the path that links Trinity Street/West Street with the Bristol Bath Railway Path.
Rationale
The Railway Path is one of the City's busiest parks, with an estimated 5,000 sustainable transport journeys made along the St. Philips end of the path each day either by foot or by bike. Many of these journeys access the railway path via a narrow path from Trinity street. The path is 1m wide, which is unsuitable for the volume of cyclists and pedestrians that use it.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
Provide a continuous, uninterrupted route with pedestrian and cyclist priority over side junctions, adjacent to Easton Way on both the East and West side. Utilise existing roads, footpaths and the verge, including the bunds.
Investigate options to improve legibility at the Lawrence Hill Roundabout and provide links to West Street/Old Market.
Rationale
Easton Way is a barrier for both pedestrians and cyclists. These proposals would seek to reverse some of the community severance that results from a road of this nature. The route will provide for variety of journeys such as; Stapleton Road to the new Library development at junction 3; and from Lawrence Hill to Old Market and the City Centre. It will also link existing routes such as the Concorde Way, Frome Greenway and BBRP to the Spine Road, providing a good North/South route.
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
Created by David Wilcox // 1 thread
Proposal
To provide a fully segregated two-way cycle facility on west side of Redcliffe Hill that links Bedminster Parade/York and Commercial Road/Clarence Road with Redcliffe Bridge and the Brunel Mile.
This provides a direct route from destinations and major trip generators in the south to the City Centre and begins to deliver a North/South route. This proposal would ties in with proposed improvements on Commercial Road/Clarence Road that will link into the forthcoming Local Enterprise Zone.
Rationale
Research has identified three key perceptions that deter people from taking up cycling: lack of personal safety; inconvenience; poor image. Experience from countries in northern Europe shows conclusively that in order for cycling to become a mass activity attracting all ages and abilities these perceptions have to be tackled and potential cyclists must believe they will feel safe, valued and normal. Facilities are needed that form a coherent network, separate cyclists from fast, high volume traffic and offer them a high degree of priority and convenience both on main routes and local roads. The purpose of Bristol's 'Design Cycling' work programme is to create a network and that is convenient, safe and provides speedy access all over the city. A network which a 12 year old would feel comfortable using.
Part of the 2013 Bristol City Council LSTF proposals.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Henry Lancashire // 1 thread
Info from survey:
"The London Borough of Brent and Sustrans are working together to explore ways in which the Kilburn High Road and surrounding area shown could be improved. Together we want to better meet the needs of the community to make it a more desireable place to walk, cycle and enjoy being in.
...
London Borough of Brent and London Borough of Camden will submit a joint application to Transport for London's Liveable Neighbourhood programme in November 2018, which will incorporate suggestions made by the community."
Brent Cyclists are forming our own response, to be sent by end of October 2018.
Created by jpennycook // 0 threads
The diversion route for Cufaude Lane, installed by Croudace, has a big fence and concrete blocks at the northern end, preventing access to Cufaude Lane.
Created by Andrew Woodward // 1 thread
Create a shared use path (or even better a dedicated cycle track) from the junction of Woodlands Road / Vine Road to Barnes Railway station - this would join LCN37 and providing a quiet route to Barnes Railway station for many residents of Sheen / Mortlake, avoiding the busy A205. This route is currently a footpath.
Pedestrians and cyclists at the toucan crossing where the busway meets Station Road, Histon have to wait a long time for the lights to change even if there is zero bus or road traffic.
This seems inconsistent with Highway Code rule H1 about the hierarchy of road users. Pedestrians should have priority over non-existent buses!
Created by Robin Heydon // 3 threads
There is a need for a link between the A14 Histon interchange with Ring Fort Path in Orchard Park.
Created by Sam Saunders // 1 thread
Cyclists travelling south west along Woodland Road and intending to turn left into Park Row are offered a continuous (advisory) cycle lane that is less then 1.2 metres wide and paved with cobbles for half of its width. It should be removed or else widened and considerable resurfaced.
Created by Phil Lee // 0 threads
What to do about disgraceful decisions like this:
http://www.cambridge-news.co.uk/Driver-ran-Cambridge-cyclist-mistakenly-thinking/story-24555273-detail/story.html ?
Clearly, the magistrate erred seriously in matters of both fact and law - all the prosecution had to prove was that the way he drives falls below what would be expected of a competent and careful driver.
Equally clearly, it did - nobody who could possibly be described as "competent and careful" would run over something the size of a cyclist without even being aware of it. He even admitted that he was talking on the phone at the time.
It staggers the mind to think what on earth the magistrates were thinking - or what with. Maybe they slept through the case, so didn't hear the prosecution, but were woken up for the defence (how there can be any defence for that is beyond me). Maybe they are dangerous drivers themselves, so sympathise with others of the same ilk instead of adequately discharging the responsibilities they are charged with? Mark Tyler also deserves complete contempt for not pleading guilty, and so preventing this gross miscarriage of justice. He should have been thanking his lucky stars that the police and CPS are so incompetent as not to pursue Dangerous driving, which it equally clearly was.
How can we get rid of incompetent idiots like Phil King (the lead magistrate in this case) who asserted that "there were “significant gaps” in the evidence". It is obvious to me that this dangerous idiot is perverting the course of justice by remaining in his position.
Presumably his colleagues on the bench conspired with him in this perversion - they could (and should) have over-ruled him unless they were parties to the conspiracy, surely?
The evidence was all there - there was a cyclist in front of him - whether the cyclist was upright or on the ground is irrelevant. Mark Tyler drove over him. Neither of those facts were in dispute. That is not the action of a competent and careful driver, and it should be beyond question that a person being in front of the vehicle is something which the driver should be expected to be aware of, which means the test in s3ZA of the Road Traffic Act is satisfied, and the accused is guilty.
The evidence also meets the test in s2A (Meaning of dangerous driving) so there is no excuse whatsoever for clearing him of even the lesser offence of careless driving. With driving like that, it is clear, beyond reasonable doubt, that he should not be in possession of a driving license, and the magistrates failed in their duty to relieve him of it.
As long as dangerous criminals like Phil King are allowed on the bench, the roads will never be safe for anyone.
As a footnote, from the report is appears that this dangerous character commutes from Whitchurch, Hampshire to Clifton Way, Cambridge. What length does that make his effective working day?
It's about 120 miles each way, so at least 4 hours driving (considerably more if in the "rush hour") on top of a full workday. It's utterly moronic to make a commute like that - when I worked anywhere near that far away, I commuted weekly. But this happened on a Wednesday.
Created by Roxanne (CEO) // 1 thread
Huawei plans to develop R & D superhub at the 550-acre Spicer's Site in Sawston.
Martin Lucas-Smith // 1 thread
Queen's Road is currently one-way for cycling - it would be good to remove this barrier.
Created by Shaun McDonald // 1 thread
Overview
Transport for London (TfL) is working with interested parties - including cycling and road safety organisations - to review and improve cycling provision at major junctions across London. Please see www.tfl.gov.uk/betterjunctions for more information.
Why We Are Consulting
As part of this work we have developed proposals to improve safety at the Waterloo (IMAX) roundabout at the junctions of Waterloo Road, Stamford Street, York Road and Concert Hall Approach.
What we’re proposing and why
Waterloo roundabout is a key junction for cyclists travelling between central and south London. Counts show that more than 5,500 cyclists use Waterloo roundabout each weekday, representing nearly a quarter of all traffic here.
Our review of the current road layout identified that early improvements can be made to allow cyclists better access to Advanced Stop Lines (ASLs) on the roundabout, reducing the need for them to position themselves amongst fast-moving traffic. We’re proposing the following improvements:
New cycle feeder lanes leading into new longer ASLs will reduce the risk of collisions by helping cyclists to get ahead of other traffic. The new feeder lanes will mean that some sections of the roundabout will have three lanes for all traffic instead of four
Extending footways and traffic islands to reduce traffic speeds and provide more space for pedestrians.
Traffic modelling suggests that these changes would cause some increase in queuing on the roundabout and approaches at busy times, particularly on the approach from Stamford Street.
Proposed 20mph speed limit to follow in 2013
We are also proposing a 20mph speed limit at the roundabout. This would be introduced early in 2013. We will provide more information once these proposals have been developed further.
Please click here to see the map for further information on the proposals.
We are continuing to explore further improvements for cyclists and pedestrians as part of planned longer-term regeneration of the Waterloo area.
We intend to begin work at the roundabout on 21 November 2012. We will write to residents and businesses nearer the time to advise on the timing and impact of construction work.
Have your say
Please give us your views by completing the online consultation form by 14 November 2012.
https://consultations.tfl.gov.uk/betterjunctions/waterloo-roundabout
Created by Charlie Halliday // 1 thread
Proposal by Hampshire County Council to increase the capacity of the roundabout.
Concerns that the carriageway would be even less appealing for cyclists and the shared used paths not an adequate alternative.
Decision to be made on 5 November 2013
Created by carlystevens1989 // 1 thread
There are a number of varying sized pot holes along the Cumberland Road leading up the traffic lights near the Mud Dock Deli, the side of the road with no cycle markings. They are mainly on the edge of the road, the largest being around 12 inches in diameter and are also in succession of each other. I would estimate around 10-15 pot holes in total.
Cars are often less than forthcoming when you have to move into the middle of the road to avoid them and therefore cyclists often cycle on the path in order to avoid them - although this path is wide enough to accommodate a cyclist it is not a shared path.
It would also be useful if this side of the road had cycle markings like the other side.
Created by Jon Warbrick // 1 thread
The County Council have a consultation running on "improvements along Cherry Hinton Road, Cambridge, to make it safer and more attractive for walking and cycling" between Hills road and Perne Road.
The consultation runs until Tuesday 18 June. There are two consultation events at Rock Road Library, 69 Rock Road, Cambridge on Tuesday 21 May and Tuesday 21 May.
Created by Andy Allan // 1 thread
There used to be around 6 covered sheffield stands outside Tulse Hill station, tucked away around the corner from the Station Rise. But they've disappeared recently.
Are they coming back? Are there going to be replacements?
Created by Shaun McDonald // 1 thread
Comment from Cycle Ipswich meeting 10-2014:
"Need dedicated cycle tracks for cycle traffic from new NW Ipswich development".
Anon // 1 thread
Our Healthy Streets: Dulwich
Recent projects and engagement with residents in the Dulwich area have shown a common theme that there is too much traffic in the area, and this is having an adverse effect on local life.
We want to work with residents to address these concerns about traffic volume and its impact on the community.
Phase 1 of 429 April to 7 June
In this first phase we want to hear from you about the issues in this area. We are completely open to your ideas, later phases will look in more detail at possible solutions.
Get involved
Created by Thomas Lancaster // 0 threads
Coming off the Scholars Greenway out of Farnham Park, cyclists currently have to detour along Park Row and the heavily trafficked Castle Street and The Borough to get to The Woolmead, East Street development and South Street to the Station. Bear Lane is wide enough to accept a contraflow to The Woolmead. The Woolmead is currently one way but designated for 2-way traffic as part of the East Street (Brightwells) development.
Created by Dawes Jaguar // 0 threads
There is scope here for creating a short cycle path to complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Andrew Woodward // 0 threads
This is the approach to Kew Gardens station and is an area with many shops and cafe’s. Enabling this street to become 2-way for cycling will make access to the station and shops more convenient for cyclists and should therefore bring economic benefits to the area. Streetview: http://goo.gl/maps/P4spf
Created by Kevin Ablitt // 1 thread
Having grown up in this area I know it well. Bolton Lane and Christchurch Street could benefit from 20 mph, Cobbold Street and Withipoll Street would be more pedestrian and cyclist friendly if they had filtered permeability. Cobbold Street is extremely busy at school times as parents drop off or collect, make it closed half way to motors and this would cut out through traffic . Likely to be very contentious.
Created by Heather Coleman // 1 thread
As described in the winter 2019 Camcycle magazine there is a group working on getting some improvements to the Trumpington busway. The magazine concentrates on the northern end of the busway but we are also seeking upgrades to the Addenbrookes spur junction and the crossing at Hobson Avenue/Lime Avenue as well as adding pedestrian footpath from the Hills Road Bridge all the way to Drury Avenue.
The group would like to start getting this out to users of the path for input, discussion and help with campaigning. Many Biomedical Campus commuters presumably use this path frequently, even daily. It would be great to get some input.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.