Quietway 7 QW7 Elephant & Castle to Crystal Palace
Full route of Quietway 7 Elephant & Castle to Crystal Palace
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Simon Munk // 5 threads
Full route of Quietway 7 Elephant & Castle to Crystal Palace
Created by Simon Munk // 1 thread
TfL Overview
Why are we proposing this?
The A12 Eastern Avenue is a major strategic road on the Transport for London Road Network linking the A406 North Circular Road to the M25 and the east coast via Essex.
Barley Lane is a large junction on the A12 in the local area of Little Heath, close to Redbridge College and King George Hospital in the London Borough of Redbridge.
Currently, the only formal pedestrian crossing point at the junction is a footbridge over the A12 Eastern Avenue, to the west. This crossing is not step-free.
There is a long-standing issue with traffic congestion at the junction, frequently highlighted by local residents and also staff and visitors to the nearby King George Hospital.
We are proposing new signalised pedestrian and cyclist crossing facilities and road layout improvements at the A12 Eastern Avenue junction with B177 Barley Lane and Hainault Road.
Our proposals intend to help traffic flow more smoothly, reduce delays experienced by right turning traffic at the junction, and make it safer for pedestrians and cyclists to cross the road.
What we are proposing?
Key features
Improved traffic flow
We want to reduce congestion and delays to traffic using the junction, in particular on the A12 Eastern Avenue eastbound and B177 Barley Lane northbound. We propose:
- Changes to the road layout to lengthen the right-turn lane on the A12 eastbound approach. This would improve traffic flow, offering additional road space and increased capacity for vehicles. We would create space by cutting into the central reservation. This would require the removal of one tree, which would also improve the line of sight for traffic as it approaches the junction
- New traffic signals (see pedestrian crossing improvements below) with optimised signal timings so that the whole junction can operate more efficiently
- An additional green light stage in the traffic light sequence for vehicles turning right from Barley Lane, heading northbound
- New white line-markings to provide clearer direction to vehicles.
Pedestrian crossing improvements
We want to make it easier for pedestrians and cyclists to cross the road at the junction in a safer and more direct way. We propose:
- New signalised pedestrian crossings on each section of the junction, replacing all existing unsignalised crossing points. This would require the removal of pedestrian guardrail on the north western arm of the junction
- The introduction of new shared pedestrian/cycle ‘Toucan’ crossings on the southern arm of the junction. The new crossings would link with the existing shared-use path
- More pavement space on pedestrian islands
- Footway resurfacing to improve the current poor pavement. Tactile paving would be installed at all crossing points
Further information
If this proposal goes ahead we would reduce the speed limit on the A12 Eastern Avenue through the junction from 50mph to 40mph for safety reasons. The reduced 40mph speed limit would span approximately 200 metres east and west of the centre of the junction, creating a safer environment for pedestrians and traffic.
We also plan to have a general tidy up at the junction. This could include the replacement of some vehicle barriers and pedestrian guard-railing, relocation of street lighting and signage, and new planting on the central reserve.
The existing pedestrian footbridge to the west of the junction would remain unchanged under this proposal.
These proposals are part of our Road Modernisation Plan, which consists of hundreds of projects to make London's road network safer and more reliable.
Subject to the outcome of this consultation, we hope to start works during summer 2017.
Created by Simon Munk // 1 thread
TfL Overview
We are proposing to make improvements to pedestrian and cycling facilities around the junctions of Addison Road and Warwick Road with Kensington High Street.
The location has been the site of an above average number of collisions in recent years, many of which involved vulnerable road users. Both junctions are used by high volumes of commuter traffic in west London, as well as by pedestrian visitors to local amenities such as Kensington Olympia Conference Centre. In response to the high collision rate we have worked with the Royal Borough of Kensington and Chelsea to develop a set of proposals that would provide safer crossing facilities at both junctions as well as improvements for cyclists.
The proposals form part of our programme to enhance safety for vulnerable road users on the Transport for London Road Network.
What are we proposing?
We are proposing new features at both of these junctions, including new signal-controlled pedestrian crossings and new advanced stop lines (ASLs) for cyclists.
The following is a list of each of the proposed features. The order corresponds to the numbers shown on the map.
1 Controlled, staggered pedestrian crossing at the junction of Warwick Road with Kensington High Street, to provide pedestrians with a dedicated time to cross the road in two stages using the central island
2 Move bus stop on eastbound Kensington High Street away from the junction exit to allow cyclists better access across the junction
3 Changes to bay on eastbound Kensington High Street to accommodate the moved bus stop and improve traffic flow. The bay would be moved slightly east and reduced from 15.3 metres to 10 metres in length to accommodate the moved bus stop. Operating times would be restricted to 10am-4pm Monday to Sunday. Max loading time would remain at 20mins
4 New 5m cycle advanced stop lines (ASLs) on Kensington High Street eastbound and Addison Road southbound to provide cyclists with a waiting area ahead of the general traffic queue
5 New signal-controlled ‘staggered’ pedestrian crossing at the junction of Addison Road with Kensington High Street to provide pedestrians with a dedicated time to cross the road in two stages using the central island
6 Provide short section of bus lane and re-align road markings on westbound Kensington High Street to provide two full lanes past the bus stop. Hours of operation for bus lane would be Monday-Sunday 7am-7pm
7 Resurface a section of carriageway on Kensington High Street to prevent water from collecting on the footway and carriageway
8 New 5m ASL on the westbound approach to the junction to provide cyclists with a waiting area ahead of the general traffic queue
9 New 5m ASL with central lead in lane on Warwick Road to help cyclists to travel ahead without conflict with left turning traffic
10 Remove traffic island on Warwick Road to enable a safer movement for cyclists and other road users
11 Re-align existing island on western arm of the junction to provide better access for left turning vehicles from Warwick Road
12 Widen current 1m cycle lane to 1.5m on the eastbound approach to provide more space for cyclists
13 Re-level footway on eastern arm of Holland Road to reduce the steep gradient
Created by Simon Munk // 1 thread
TfL Overview
We are proposing to make improvements to pedestrian and cycling facilities around the junction of A4 Cromwell Road and Gloucester Road.
The junction has been the site of an above average number of collisions in recent years, many of which involved pedestrians. Cromwell Road is both an important arterial road for vehicles entering or leaving west London, and also the location of several popular tourist attractions, attracting thousands of pedestrian visitors each day. In response to the high collision rate, we have worked with the Royal Borough of Kensington and Chelsea to develop two options that would provide safer crossing facilities at the junction as well as improvements for cyclists. Both options are included in this consultation.
The proposals form part of our programme to enhance safety for vulnerable road users on the Transport for London Road Network.
What are we proposing?
We have identified two options for this junction.
The main difference between the two options is the type of pedestrian crossing on the eastern arm of Cromwell Road, closest to the Natural History Museum and the Victoria & Albert Museum.
Option 1 would include a new signal-controlled ‘staggered’ two-stage crossing of the road, in which pedestrians would move to a traffic island in the centre of the road and then wait for a green light before passing to the opposite side. This approach would allow us to retain the current left turn for all traffic from the northern arm of Gloucester Road onto the eastbound Cromwell Road.
These are the design features that are specific to option 1:
‘Staggered’ (two stage) signal-controlled crossing on the eastern arm of Cromwell Road, to provide pedestrians with a dedicated time to cross the road in two stages using a central island
Dedicated left turn lane on the western arm of Cromwell Road as the exit is reduced to two lanes, due to the widened central island needed to accommodate the staggered crossing
Option 2 would provide a ‘straight across’ signal-controlled crossing of Cromwell Road in which the green light for pedestrians would enable them to cross in one movement, rather than waiting on a central island for a second green light. This would in most instances be a faster crossing for pedestrians compared to option 1, but would require the left turn from Gloucester Road to be banned for all vehicles in order to minimise additional waiting time for other road users. Our traffic count surveys show a peak hour average of 65 vehicles completing the left turn from Gloucester Road to Cromwell Road. These vehicles would need to use alternative routes.
These are the design features that are specific to option 2:
Straight across controlled crossing on the eastern arm of Cromwell Road, to provide pedestrians with a dedicated time to cross the road
Banned left turn from Gloucester Road to enable the proposed straight across crossing to operate on Cromwell Road without unduly increasing waiting times for other road users
Re-align yellow box markings in the centre of the junction, to ensure the eastern side of the box is aligned with the layout of the proposed crossing on Cromwell Road
Both options share many of the same features, such as pedestrian countdown features on the crossing of Cromwell Road, new advanced stop lines (ASLs) for cyclists and a new pedestrian refuge island on the northern arm.
These are the features that would be included in both options:
Part width 5 metre deep cycle advance stop line (ASL) on the eastern arm of Cromwell Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility and avoid conflict with left turning vehicles
Widening of existing crossing area on the southern arm and left-turn slip road of Gloucester Road, to provide more space for pedestrians crossing the road
Re-alignment of existing crossing on the western arm of Cromwell Road to better reflect the way pedestrians choose to cross
Part width 5 metre deep cycle ASL on the western arm of Cromwell Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility and avoid conflict with left turning vehicles
Kerb re-alignment on the western corner of the northern arm of Gloucester Road, to provide space for the new central island
Pedestrian refuge island on the northern arm of Gloucester Road, to give pedestrians a protected place to wait when crossing
Loading bay on northern arm of Gloucester Road moved slightly north, to provide space for the new central island and ensure vehicles can turn left from Cromwell Road. There would be no overall reduction in parking space
Reduction of southbound lanes from two to one on the northern arm of Gloucester Road to provide space for a central pedestrian refuge island
5 metre deep cycle ASL on the northern arm of Gloucester Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility. With option 1, this has the additional benefit of reducing conflict between cyclists and left turning vehicles.
Created by Simon Munk // 1 thread
These junctions are part of the Central London Grid - a set of connected routes for cyclists across central London comprising a network of Quietways and Cycle Superhighway routes.
As part of the Central London Grid, a route is proposed to run between Brompton Cemetery and Exhibition Road, along Bramham Gardens, Earls Court Square and Kempsford Gardens. We are therefore proposing changes to the junctions to make it safer and easier for cyclists, pedestrians and vehicles to cross.
What are we proposing?
Junction 1 - Earls Court Road / Bramham Gardens / Earls Court Square
The proposed changes include:
- Removal of existing island on Bramham Gardens and extension of footway to reduce pedestrian crossing distance
- Widening of the pedestrian crossings on Bramham Gardens and Earls Court Square
- Removal of existing island on Earls Court Square and provision of new smaller island with dedicated cycle stop line
Junction 2 - Warwick Road / Earls Court Square / Kempsford Gardens
Warwick Road
- New signalised junction to allow cyclists, pedestrians and vehicles to safely cross Warwick Road. The traffic signals will be co-ordinated with other signalised junctions in the area and the changes are not expected to have a significant impact on journeys times for road users through the area, although vehicles exiting Earls Court Square will have to wait for a green signal as opposed to waiting for a gap in traffic as at present
- New signalised pedestrian crossing across Warwick Road on the southern arm of the junction. This new crossing will ensure that pedestrians can continue to cross Warwick Road safely and without significant delay
- Existing signalised pedestrian crossing removed (replaced by crossing on the southern arm of the junction). The existing double red lines will be painted across the removed zig-zag markings at the crossing
- Existing parking bay relocated 40m to the south-east on Warwick Road due to the new signalised junction. The existing restrictions would apply to the relocated parking bay.
Earls Court Square
- Vehicles permitted to travel straight over Warwick Road, westbound from Earls Court Square to Kempsford Gardens. This movement is currently banned
- Dedicated signals installed to inform cyclists of when to safely proceed from Earls Court Square
- Additional cycle stands provided to replace those removed from Kempsford Gardens
- Footway re-aligned to maintain existing parking for motorcycles, car share and local residents
Kempsford Gardens
- Existing contra-flow cycle lane widened for cyclists travelling eastbound on Kempsford Gardens
- Dedicated signals installed to inform cyclists of when to safely proceed from Kempsford Gardens
- Existing speed hump to remain to help control speed of vehicles travelling westbound on Kempsford Gardens
Created by Roxanne (CEO) // 3 threads
Erection of a building for Biotech and Biomedical research and development and production together with associated supporting Headquarters and Logistics function along with associated infrastructure to include; access, services, drainage, electric and gas infrastructure, external ancillary structures, car and cycle parking and hard and soft landscaping.
Address:
Land South Of Dame Mary Archer Way Cambridge Biomedical Campus Cambridge Cambridgeshire
Council:
Cambridge
Application reference:
16/0165/FUL
Date application was made:
2016-02-02
Official application:
https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=map&keyVal=O1R7L6DXJZE00
Created by jon_events // 1 thread
On-going petition to make Queenstown Road safe for all.
http://www.wandsworthlibdems.org.uk/let_s_make_queenstown_road_safe_for_all
Handed into the council and City Hall June 2015.
Created by jon_events // 1 thread
On-going petition to trial a home zone in the area indicated.
Specific ask is:
We, the undersigned, call on Wandsworth Council to pilot a home zone area on the east side of Mitcham Lane, from Fallsbrook Road to Blegborough Road, for a suitable period of time using temporary measures to see if the benefits from creating a permanent home zone outweigh any potential traffic disruption that may be caused.
The Mini-Holland approach taken to filtering traffic in Waltham Forest gives an example of how other parts of London are creating safer streets.
Created by jon_events // 1 thread
High levels of non-residential motor traffic use these streets as alternatives to the surrounding A roads. The proposed trial asked by the petition should help stop this happening whilst maintaining bus route access and emergency vehicle access to St George's.
http://www.wandsworthlibdems.org.uk/safer_streets_smallwood_fountain_rd_area
Created by jon_events // 1 thread
On-going petition to make Tooting High Street safe for all:
http://www.wandsworthlibdems.org.uk/let_s_make_tooting_high_street_safe_for_all
Handed into City Hall early 2014.
Created by jon_events // 1 thread
On-going petition to make Tooting Bec Road safe for all:
http://www.wandsworthlibdems.org.uk/let_s_make_tooting_bec_road_safe_for_all
Created by jon_events // 1 thread
On-going petition to make Mitcham Lane safe for all add your support here:
http://www.wandsworthlibdems.org.uk/let_s_make_mitcham_lane_safe_for_all
Petition ask:
We, the undersigned, call on TfL and Wandsworth Council to make changes to Mitcham Lane so that cycling can be an option for everyone, not just the fit and the brave.
Originally submitted to the council in the Autumn 2013.
Created by MartinGT // 2 threads
Add a cycle path on the broadway road. This should be off the road as its currently unsafe and a race track. The grass verge is wide enough for there to be a cycle path added adjacent the current pavement.
This would encourage more people to cycle between Horsforth & Farsley and people from Rawdon & Rodley to cycle to Horsforth then onto the Canal into Leeds etc.
Created by Simon Munk // 1 thread
Royal Borough of Greenwich are working with its partners Transport for London (TfL) and Sustrans to develop proposals for new ‘Quietway’ routes, to enhance facilities for people cycling or walking, whilst minimising impacts on other road users. This set of schemes would implement improvements along the cross-Peninsula section of the ‘Thames Path Quietway’ in Peninsula Ward. Further proposals for sections of this route in other Wards will be brought forward for consultation in due course.
What is being proposed?
For this set of proposals, we are consulting on the following schemes in the Peninsula ward:
(a) Old Woolwich Road, junction with Lassell Street (scheme ref: QTP3b)
A more people-friendly junction has been designed to benefit pedestrians and cyclists. This includes kerb build-outs to tighten the junction, particularly on the north side of Old
Woolwich Road at its junction with Lassell Street, to improve the crossing point for
pedestrians and slow vehicle speeds. One car parking space will be lost as a result.
(b) Gibson Street, junction with Banning Street (scheme ref: QTP3c)
New kerb build-outs are proposed at the junction of Gibson Street with Banning Street,
which will move the ‘give way’ markings forward and so improve sight lines for cyclists
turning right out of Gibson Street. In addition a ‘cycle hangar’ secure cycle parking facility is proposed for the wide footway space on the south-western side of this junction (corner of Enderby Street and Banning Street). No car parking spaces will be lost as a result of the proposals.
(c) Southern Park (adjacent to Ecology Park; scheme ref: QTP8)
An existing, well-lit, hard standing path borders the southern and eastern perimeter of the Southern Park (adjacent to the Ecology Park), linking West Parkside with the riverside path at Greenwich Yacht Club. No changes are proposed to this path itself; however it is proposed to clearly sign this section only as ‘shared use’ for cyclists and pedestrians. At the existing Toucan crossing at the junction with West Parkside/ Southern Way, extra space will be created by removal of a small section of wooden fencing, and relocation of a small tree.
(d) Riverside, junction with Lombard Wall (scheme ref: QTP9a)
Priority will be given to the Thames Path route, providing extra safety and security for
pedestrians and cyclists. A raised table at the junction of Lombard Wall as it meets Riverside will slow any vehicular traffic. The western side footway will be improved for pedestrians. No car parking spaces will be lost from the proposals.
(e) Riverside, junction with Anchor and Hope Lane (scheme ref: QTP9b)
Priority will be given to the Thames Path route, providing extra safety and security for
pedestrians and cyclists. The cycleway will be realigned to better connect with Riverside,
and the junction will be resurfaced in green to provide increased awareness of cyclists. No car parking spaces will be lost from the proposals.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway Cycle Route Link in Bayswater
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.
Created by Simon Munk // 1 thread
The council is consulting with the public about making changes to traffic movements in and around Cable Street.
The proposed changes are designed to alleviate the number of vehicles cutting through Cable Street to avoid congestion on The Highway.
There are a number of vehicles using Brodlove Lane and Cable Street as a ‘rat run’ to travel from The Highway to Butcher Row.
The changes to be considered by the public include one-way parts of Cable Street.
It is also proposed that a number of measures be introduced to make the area safer for pedestrians and cyclists.
A new bus lane will be created on a short section of Cable Street between Sutton Street and Watney Street. This will be supported by the closure of the north end of King David Lane to all motor vehicles.
The changes will see a significant reduction in the amount and speeds of traffic using Cable Street and surrounding roads.
In preliminary consultation with businesses and residents, the council was told cyclists are uncomfortable using the narrow two-way cycle lane.
The council proposes the cycle lane be widened for cyclists travelling against the traffic, with cyclists travelling the other way joining the main flow of reduced traffic.
The area between Shadwell Overground and DLR stations and Sutton Street will be completely redesigned to ensure priority for pedestrians.
The proposals will also see the introduction of pocket parks and improved community spaces to make the area look and feel more attractive.
Mayor of Tower Hamlets, John Biggs, said: “We have developed these proposals after being made aware of initial concerns from residents, businesses and people who travel through the area. These detailed and well developed plans will improve the area for all road users. We welcome any comments to ensure that we have taken everything into consideration.”
Cllr Ayas Miah, cabinet member for environment, added: “For far too long the safety of people using Cable Street has not been given enough priority. These proposed changes will stop vehicles from cutting through the area for the benefit of pedestrians and cyclists. The aesthetic changes proposed will enable all local people to be proud of the area that they live or work in.”
Full details of the proposals are being sent to 5,000 addresses along Cable Street and in the surrounding area.
Created by Simon Munk // 1 thread
The London Borough of Hounslow is proposing cycling and pedestrian improvements on Bedfont Road, an important link between the A30 Great South West Road and Chertsey Road that is served by the H26 bus route.
This scheme's primary aim is to widen areas of footway in order to provide a 3m wide shared pedestrian and cycle route along the length of Bedfont Road, improving access to homes, businesses, and leisure facilities such as Bedfont Lakes. The proposals also include improved pedestrian crossing facilities and bus accessibility, which would particularly benefit vulnerable road users.
Created by Mixhael // 1 thread
Camden are consulting with residents of, and neighbouring residents to, The Three Fields Estate on Arlington Road.
Part of their proposal is to remove the awkward dog-leg on Miller Street. Hurray.
I know Miller Street is a popular east-west desire line and (sort of) connects up with Pratt Street.
The proposal doesn't mention cycles. Boo. I'd hate to see it being pedestrians only. Although it's difficult to tell what is meant by the pink colouring on the proposed plan, it does look like their will be vehicular access in this area. Let's hope the existing filtered permeability will be maintained.
More details here http://camden.gov.uk/ccm/cms-service/stream/asset/?asset_id=3418488&
There will be a consultation meeting at Fairfield Play Centre 18:30 to 20:30, Thursday 25th February 2016. I'll pop along and see if I can find out more.
Created by Valleys Cycling // 1 thread
Major roadwork are being carried out at Upper Boat including signalising junctions and installing footway (phase 2). Unfortunately the opportunity in both Phase 1 and 2 has been missed to install a cycle crossing to link the current cycle path from the South to Hawthorn via the Upper Boat PH cul-de-sac. This would have enabled safe cycle trips, avoiding the busy roundabout and given students access to the new college in Nantgarw.
Created by Harry Fletcher-Wood // 1 thread
Hackney Council are consulting on a series of proposed improvements to this area. The key features of this proposal are:
- Raised pedestrian crossings (one new)
- Widened pavements
- Raised table entry treatments
- Four new cycle contraflows on existing one-way streets.
The council is also considering area-wide modal filtering, and canvassing views, subject to further consultation later.
Created by John Ackers // 1 thread
Lever Street - Two-way cycling, providing a westbound cycle lane
Junction Bath Street/Lever Street - Kerbside build-out to protect cyclists turning into contraflow cycle lane. Loss of one car parking space and the provision of parking facilities for six bicycles.
Bath Street through to Bunhill Row - Refreshing existing road markings to better define the cycle route
Bunhill Row - Clearly marked contra-flow cycle lane which will help cycle safety by making it clearer that cyclists are using this route
Bunhill Row junction Chiswell Street - Protection for cyclists with footway build-outs and traffic islands. A signalised junction could be considered in future, depending on the outcome of a consultation carried out by the City of London in November 2015.
Chiswell Street - Introduction of segregated cycling facilities resulting in the loss of some parking bays
Chiswell Street/Finsbury Square junction - separate traffic light phases for cyclists
Finsbury Square - Two-way segregated cycle lanes
Sun Street/Wilson Street junction - Two-way segregated cycle lane
Featherstone Street/City Road junction - Featherstone Street at the Junction of City Road will be closed to motor traffic
Leonard Street - Inset parking bays and widened cycle lane to improve contraflow cycling
All the drawings are linked to the Islington cycling page at http://www.islington.gov.uk/involved/consultation-engagement/consultations/Pages/cycling-consultations.aspx
Created by George Coulouris // 1 thread
Camden says: "To be delivered as part of the Central London Cycle Grid, the key aspect of this scheme proposes a road closure that would restrict access for motor vehicles between Lansdowne Terrace and Brunswick Square at the junction with Bernard Street. This closure allows us to create a large pedestrian-only area, provide a new cycle track, simplify the road layout and rejuvenate the area around the square."
This scheme removes a mini-gyratory and links well with these two consultations for the North - South Cycle Superhighway:
http://camdencyclists.cyclescape.org/issues/2045-north-south-cycle-superhighway-extension-to-kings-cross
http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Quietway 2 passes through here:
http://www.cyclescape.org/issues/1503-quietway-2-consultation-on-proposals-for-guilford-and-calthorpe-streets
Created by George Coulouris // 1 thread
This joint TfL/Camden consultation takes the North – South Cycle Superhighway across Euston Road and continuing with a section of central London grid on Midland Road to join the existing southern extension of the Royal College Street route.
It includes:
- Cycle-only green signal to allow cyclists to cross Euston Road separately from motor traffic
- Two-stage right turn areas to allow cyclists to access Judd Street and Midland Road without crossing lanes of moving traffic
and two options for Judd Street:
Option 1 – Full closure of Judd Street at Euston Road / Midland Road junction to allow a dedicated cycle crossing across Euston Road
Option 2 – Judd Street entry only for motorists from Midland Road, with segregated northbound contraflow cycle track
Created by Space Pootler // 1 thread
Junction Road is used as a rat-run by motorists between the A4 and Little Ealing Lane/Northfields Avenue. The problem is especially acute around Whitestile Road and Enfield Road (which is too narrow to accomodate this traffic).
This traffic should rightly be sent onto the B roads surrounding the area, and the neighbourhood preserved for the access of its residents.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”