Lack of cycle crossing at Upper Boat.
Major roadwork are being carried out at Upper Boat including signalising junctions and installing footway (phase 2). Unfortunately the opportunity in both Phase 1 and 2 has been missed to install a cycle crossing to link the current cycle path from the South to Hawthorn via the Upper Boat PH cul-de-sac. This would have enabled safe cycle trips, avoiding the busy roundabout and given students access to the new college in Nantgarw.