North-South Cycle SuperHighway Phase 1 N-S CSH
North-South Cycle SuperHighway, N-S CSH
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Simon Munk // 1 thread
North-South Cycle SuperHighway, N-S CSH
Created by Simon Munk // 1 thread
CS8 / Cycle SuperHighway 8 - Wandsworth to Westminster
Created by Simon Munk // 1 thread
Cycle SuperHighway 7 / CS7 - Merton to City
Created by Simon Munk // 1 thread
CS5 / Cycle SuperHighway 5 Vauxhall - Pimlico
Created by Simon Munk // 1 thread
CS3 / Cycle SuperHighway 3 Tower Gateway - Barking
Created by Simon Munk // 1 thread
Overview
We are seeking your views on proposed changes to the junction of Borough High Street with Union Street and Newcomen Street. The proposals are part of the Central London Cycling Grid - a network of cycle routes in Zone 1.
This junction forms part of the Blackfriars to Tower Bridge Road route. The London Borough of Southwark consulted on other parts of this route in October 2015 – further details can be found here:
What are we proposing?
Our proposals aim to improve safety for cyclists and accommodate the predicted increase in cyclists along this route. The design would provide a more direct route for eastbound cyclists by removing a long detour and allowing them to proceed along Newcomen Street. By altering the signal phasing of the junction, we would also enable cyclists on Borough High Street to turn onto the new route.
Why are we proposing this?
The Blackfriars to Tower Bridge Road Route will provide a safer and more pleasant journey through a section of the city that is already popular among commuters as well as recreational cyclists. Transport for London and Southwark Council have identified certain junctions and sections of the proposed route that could be modified to improve cycle accessibility as well as safety for all users of the road, including pedestrians.
By closing a short section of Newcomen Street to motor vehicles and creating two-way access to the junction, we will remove a long detour from the cycle route. Changes to signal phasing at the junction, and modifications to existing street furniture, will create safer routes for cyclists without affecting pedestrian accessibility.
At construction stage the junction would also be resurfaced. Proposals for this junction are:
Union Street
Existing contra-flow cycle lane retained for cyclists travelling westbound on Union Street. This would connect to Southwark Council’s proposals for Union Street.
Existing advanced stop line extended to 5m with a cycle feeder lane. These extended facilities would provide cyclists with a larger waiting area in front of motor traffic, improving their visibility, and allowing them to safely move away at the traffic lights.
Borough High Street
Dedicated low-level cycle signals to inform cyclists of when to safely proceed across Borough High Street from Union Street and Newcomen Street.
Pedestrian islands widened to improve pedestrian accessibility across Borough High Street.
Cyclists permitted to turn left onto Union Street and Newcomen Street. This movement is currently banned and would remain banned for other vehicles. This allows cyclists on Borough High Street to join the route. The signal phasing would be altered to permit this movement. NOTE: All vehicles (including cyclists) would continue to be banned from turning right into Union Street or Newcomen Street.
All-round pedestrian signal phase retained so that pedestrians can safely make all movements across the junction at the same time.
Newcomen Street
Section of Newcomen Street closed to motorised traffic. Bollards would be installed approximately 30m west of the junction to enforce road closure to motorised traffic except for emergency access. NOTE: Newcomen Street is a borough-owned road and this aspect of the scheme would be progressed by the London Borough of Southwark.
Two-way cycling permitted on Newcomen Street allowing cyclists travelling eastbound to proceed directly from Union Street, and turn left from Borough High Street.
Existing footways widened to improve pedestrian accessibility.
We have carried out traffic modelling for this proposal. The results indicate that the proposed changes can be accommodated without undue delay to any road user.
Created by Stephan Matthiesen // 1 thread
The underpass under Milton Road has a very bad surface and is very dark, this is particularly bad as there is sometimes rubbish and jokers have left stone slabs or other items in the middle of the path.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Created by Roxanne (CEO) // 1 thread
The demolition of Jupiter House and the construction of a new office building comprising 5,654 sqm (GIA) of Class B1(a) floorspace including ancillary accommodation/facilities with a single basement of 1,715 sqm (GIA) providing 37 car parking spaces, with associated plant and new sub-station, 193 cycle parking spaces at street level and two options for provision of access to the development and for hard and soft landscaping.
Created by Roxanne (CEO) // 3 threads
Erection of 50 new affordable houses, following demolition of 26 existing dwellings (Nos 46-60 and 66-75 Eastfield), and associated highway works, landscaping and public open space provision.
See pages 20 and 21 of D&A statement for car parking and cycle storage. (No specifics provided)
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Simon Munk // 1 thread
Huge residential redevelopment next to Staples Corner. Latest transport update
Created by Jean Dollimore // 1 thread
This issue so is for collecting ideas on the area bounded by Mansfield Road, Grafton Road, Queens Crescent and Malden Road.
Camden says: we are interested to know what residents, businesses, community groups, service users and all other stakeholders in the Gospel Oak area think about the ideas and what ideas you might have.
Some of Camden's priorities:
- Improve public spaces
- Getting about
- Queen’s Crescent
Dates: consultation 19th November 2015
Officer: George McKenzie (Community Liaison Officer)
. CC member dealing with it Angela Hobsbaum.
Created by Simon Munk // 2 threads
TfL say:
We are proposing a number of transformational changes to Vauxhall Cross as part of our Road Modernisation Plan.
The Road Modernisation Plan is the biggest investment in London’s roads for a generation, consisting of hundreds of projects to transform junctions, bridges, tunnels and pedestrian areas, making our roads safer and more reliable.
Working closely with the Lambeth Council, we are aiming to return the one-way road system at Vauxhall to two-way roads and significantly improve pedestrian and cyclist provision to help create a safer and less intimidating environment for vulnerable road users. The proposed changes would also help to improve connectivity throughout the area, and create a better environment for people living, working, and travelling through Vauxhall.
Following our initial consultation in 2014 on our high level proposals, we are now inviting your views on our detailed design proposals.
What are we proposing?
The changes we are proposing include:
Removing the existing one way road system around the transport interchange (Parry Street, Wandsworth Road, Kennington Lane, South Lambeth Road) by converting these roads around Vauxhall to two way
Providing more cycle and pedestrian crossings as well as segregated lanes and parking for cyclists
Improving existing and providing new public spaces
Redesigning the transport interchange, including a new central bus station
Why are we proposing this?
Reducing traffic dominance
The current gyratory creates an environment heavily dominated by motor vehicles. The wide carriageway encourages high speeds, especially outside peak periods
The gyratory can be difficult to navigate, and the one-way arrangement means that vehicles often follow indirect routes
Lack of facilities for pedestrians and cyclists
Large numbers of pedestrians pass through Vauxhall each day but the existing crossings do not always follow the most direct or popular routes, which can lead to pedestrians crossing roads away from the crossings
The Vauxhall gyratory has some of the highest numbers of collisions involving injury to pedestrians and cyclists in London
Cycle Superhighway 5 will improve conditions for cycling along Harleyford Road and Kennington Lane. However, there is limited cycle provision on the other roads surrounding Vauxhall Cross and a lack of connectivity between facilities
Supporting the transformation of Vauxhall
Vauxhall is the gateway to one of Europe’s largest regeneration zones, with 25,000 new jobs and 20,000 new homes coming to the Vauxhall, Nine Elms and Battersea area
Supporting Vauxhall’s distinct local character, the proposals look to the future – preparing for the increase in the numbers of people living, working, and visiting Vauxhall and its existing and new shops, businesses and attractions
Created by Roxanne (CEO) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by Jean Dollimore // 1 thread
The preamble describes a "Vision" for Grays Inn Road as part of a larger scheme for the Farringdon Area:
- improved streets for walking & cycling
- clearer and easier access to move through the area on foot, cycle or public transport
- safe, attractive and less cluttered streets
- a better place to live, work and do business.
The current set of proposals are related to bus reliability and pedestrian safety. They include the following:
==============================
- Raised zebra crossings at five sites with a standard layout that involves build outs to leave a 9m wide crossing. (some of these replace informal crossings with islands, some are new).
- Long stretches of double yellow lines with loading restrictions (see Appendix 1 of the consultation).
- footway widening on the east side between Ampton Street and Calthorpe Street
- Carriageway cycle parking in Wren Street and several other side streets
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Martin Lucas-Smith // 1 thread
Hills Road and Addenbrooke's Route is one of the five City Deal 'cross-city improvements' schemes.
"This is a key route for people accessing local schools and sixth form colleges as well as the Biomedical Campus. The cycle facilities at the junction of Hills Road/Long Road/Queen Edith's Way are limited. The two proposed options aim to provide safer crossing for pedestrians and cyclists accessing the Biomedical Campus and local area."
Martin Lucas-Smith // 1 thread
One of the five City Deal 'cross-city improvements' schemes is Ditton Lane.
"National Cycle Network 11 and 52 (NCN 11 & NCN 51) crosses Ditton Lane near Fison Road and then runs parallel to the river Cam and connects the City Centre with East Cambridge. This route is extensively used by cyclists heading to Newmarket Park & Ride and Marshalls. In the future the route is also likely to be used by those travelling to the Wing housing development. This scheme will ensure imrpovements to the busy NCN 11 & NCN 51 and improve the links to the local area, Fen Ditton Primary School and Horningsea."
See also issue 418.
Martin Lucas-Smith // 2 threads
A third railway station for Cambridge, at Addenbrooke's has long been proposed, and there are signs of increasing interest in this proposal.
Obviously we will want to ensure that any such development is as cycle-friendly as possible.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Dawes Jaguar // 0 threads
This junction is appalling badly designed. The only thought behind it appears to be how to maximise traffic flows on the A4040. The weird junction with the high street proper just causes confusion and near-misses. The roundabout is notorious for collisions, and facilities for pedestrians are poor. Facilities for cyclists are non-existent. It is a major barrier to cycling.
The junction should be redesigned, taking into consideration all road users and traffic flows over a wide area with a view to reducing conflicts. For example, consider closing roads to motor traffic so as to simplify the situation and improve permeability for walking and cycling. Motor traffic on the high street (which is looking run down) is bad for trade.
Created by Dawes Jaguar // 0 threads
Old Church Road is narrow and twisty, yet some motorists see it as a good place to travel at speed and overtake. It would be nice if the Bishop of Birmingham could be persuaded to encourage people to walk and cycle along here. There is a gate at one end, but it is rotten and could be replaced with a half barrier gate, to create the required filtered permeability.
Alternatively a small corner of land at the gated end could be used to create a direct connection with Old Church Avenue.
Note that there is a school at the gated end, which of course encourages motor traffic. Improving the walking and cycling routes here would reduce the motor traffic.
Created by Dawes Jaguar // 0 threads
* Remove the cycling prohibition order on Old Church Road and make it shared use.
* Make the crossing on Harborne Park Road a toucan crossing.
* Paint a line along the join in the path on Harborne Park Road, to make it split use.
* Make arrangements to allow cyclists to connect between this cycle path and Vivian Road safely.
Note that there is a school at the end near the church, which of course encourages motor traffic. Improving the walking and cycling routes here would reduce the motor traffic.
German towns have made paths such as Old Church Avenue shared use to encourage cycling. They don't become impossibly busy with cyclists, but such moves do result in a much higher cycling modal share, which in turn reduces congestion. Old Church Avenue would make a useful link to encourage cyclists into Harborne. Harborne currently has a difficult-to-use road system and is congested with cars. This is really bad for trade. Removing the cars from Harborne high street would boost trade and revive the high street, but people still need to get there somehow. That's where bikes come in.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
Created by M Stanley // 1 thread
From member P.C.
As you might know highways has really usefully put more yellow markings to stop parking on this tricky corner
But the local car repair is using the corner as a salesroom. Its made it an even trickier corner. Can we get this info to highways pls as the double yellows need extending and to stop on pavement parking.
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by David Lally // 1 thread
Consultation on development in the area of the proposed HS2 East Midlands Hub at Toton. Transport provision with be the County responsibility but it's important that the possibility of cycle route links between the Toton Lane tram terminus (which now has a good quality cycle route to the outskirts of Beeston) and Long Eaton / Route 67 is not compromised.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
The cycle lane on Billacombe Road is unusable due to car parking in it.
There is a very poor road surface on the left hand northbound lane of Stockport Road (A6) after the Plymouth Grove junction.
This is dangerous as if you bear left it encourages traffic behind you to sneak past you, if you go through it can damage your bicycle or even cause you to come off, if you bear right brings you into direct conflict with traffic which often wants to merge into the right hand lane.
The solution is very simple, resurface this small section of road.
Created by Stephan Matthiesen // 0 threads
The whole area is a barrier, there are no connections between North Bridge, St Andrews Sq/George St and top of Leith Walk without lot of bus/taxi/confused private car drivers and cyclist-blender junctions.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Rhian // 1 thread
This is a well used route already but very muddy as there is no surfaced footpath across the playing field. A dropped kerb at the end of Noble Grove and a surfaced path around the football pitches to a dropped kerb on Parkhead Loaning would be a significant improvement. A type 1 and dust path as detailed in the attached link would perhaps be more suitable than a fully tarmacked path. Lighting at the points of entry to the grassed area would be an added benefit as this is currently a very dark route.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Andrew Woodward // 1 thread
South Worple Way is signposted as part of LCN 37; but the western end of it is blocked off with this obstruction; which leaves only a very narrow gap for bikes to get through. Could you get a cargo bike or a trailer through there?
Created by Simon Still // 1 thread
The Local Implementation Plan (LIP) sits underneath the Local Plan and sets out our commitments to make the changes outlined in the Local Plan a reality.
This LIP also identifies how the London Borough of Redbridge will work with Transport for London (TfL) towards achieving the Mayor's Transport Strategy goals of:
Natalie G // 1 thread
The proposals for this route along Whiston Road include:
Removing some of the existing speed cushions and replacing them with raised carriageway
tables. These speed tables will be raised to footway level to provide a traffic calming feature
to assist in reducing the speed of traffic along Whiston Road, making it a safer environment for
pedestrians, cyclists and drivers.
Please let us have your comments before 17 October 2016 so that we can draft a group response.
thanks
Natalie
Created by Paul L // 0 threads
longer than Kew Rd and any traffic can be obstructive in narrow roads.
Toucan crossings of A316, Kew Road and Mortlake Rd.
Is rat running a problem ?
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Cllr Ian Manning // 2 threads
I've long thought the Green End Road area, specifically the section closest to Milton Road, is prime territory for a big reallocation of space, with segregated cycleways, pavements and a narrowed road.
There is a *small possibility* of including an ambitious plan for this in the station project.
Created by Angela Hobsbaum // 1 thread
TfL/Islington are proposing improvements to Highbury Corner. This is a major scheme - removing one-way traffic system on the roundabout and introducing fully-segregated cycle tracks and dedicated crossings for cyclists.
Here's the TfL page https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout and the council landing page is at https://consultations.tfl.gov.uk/roads/highbury-corner-roundabout
TfL/Islington drop-in sessions at:
Union Chapel, Compton Terrace, London N1 2UN
Wednesday, 24 February 15:00 - 19:00
Saturday, 27 February 09:30 - 13:30
Monday, 29 February 10:00 - 14:00
Created by Gerhard Weiss // 1 thread
Walthamstow High Street has a busy market, which makes it near impossible to cycle. Outside market times it has 'no vehicles allowed' signs. Even in the middle of the night it is illegal to cycle trough he spooky quiet High Street.
There is virtually no cycle parking along the High street, only at the nodes. Provision is particularly poor in the middle by the Sainsbury supermarket.
Created by Chris Neston // 2 threads
This section of the A540 is Dual carriageway North of the Welsh Road (A550) towards Hoylake ( 60 mph) and single carriageway south of it towards Chester ( 50mph). It is used by hundreds of cyclists every week, yet is extremely dangerous to them and there have been numerous collisions and several cyclists have died along here. It provides a vital link between the lanes of Wirral and those of Chester and North Wales. It also houses the world famous Eureka cyclists cafe.
Ideally the whole of the A540 from Chester to Hoylake needs a cycle path, but to provide one over the relatively short section between Mudhouse Lane and Woodbank Lane would make an incredible difference for a small outlay. North of the A550 there is plenty of room alongside the existing road. South is more difficult but not insurmountable.