Prijelaz Držićeva - istok
Potrebno iscrtati prijelaz preko ceste
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by James Gilbert // 1 thread
New barriers will be used to prevent cars driving into the ford when the river is too high. Almost all of the time when the ford is in flood it is still passable by cyclists and pedestrians on the footbridge. On the Duxford side (pictured), cyclists will have to squeeze past on the verge next to a ditch to get round. This will be hard for cyclists with trailers, children in seats etc...
Richard G // 1 thread
Hi everyone
I'm looking on cycling round the east anglian coastline with a group of scouts this summer.
Has anyone done this & could give hints or suggestions to the routes?
Sustrans maps show plenty of quiet road type routes, but I'm thinking they are not well signposted.
the NCR01 route cuts through Norwich rather than round the coast, but I guess may well be better signposted?
Can anyone help me out with thinking about a route please?
Thanks
Richard (Cambridge area)
Created by timlennon // 1 thread
Note from correspondent:
At the moment there is an agreement for non-vehicle access in and out and vehicular egress for the Canons leisure club members via a controlled barrier with responsibility in the hands of The Harlequins Management. This is regularly abused by unauthorised traffic. I want to investigate the feasibility of it being made pedestrian and cycling only, in advance of any building developments which might want to bring it back into full use for vehicle entry and egress, which would have a significant negative impact on the safe use by pedestrians and cyclists.
Created by Robin Heydon // 1 thread
The Guided Busway is a huge success. It carries many adults and youth to and from many destinations, a major destination being the Cambridge Regional College bus stop. Unfortunately, the volume of bicycle and pedestrian traffic along the line of the busway at this point probably wasn’t considered and is now causing problems. It will probably cause even more problems once the new Science Park Station is built at the far end of the busway.
Current Situation
When I started looking at this junction, I tried to ignore what was “built” and instead tried to observe how people moved through the junction. In the first diagram I’ve shown the main desire lines. Desire lines are where people actually move rather than those which engineers designed. For example, when crossing the access road to the college, from the busway, people walked in as straight a line as possible pretty much ignoring the supposed 90º toucan crossing.
Many people on bicycles don’t bother with the toucan but instead just wait for a gap between the traffic light phases and quickly scoot across. Many people ignore what has been designed and have found new, possibly better, ways through the junction - for example, creating a path from King Hedges Road over bare ground. This informal crossing obviously works, but is it safe? Do the bus drivers expect people to cross at this point?
There are many conflict points, some less bothersome than others. The two biggest problems are at the bus stop exit junction with the science park entrance, and between the toucan crossing and the brick surround of the gas supply for the area. When cycling there can be many people trying to cross the road, especially after the bus has stopped, or just before classes are due to start, all getting in your way. Of course, we are getting in their way too, and this isn’t helped by the poor sight lines.
I would therefore summarise that the problems are simply:
1. Severely limited space at the toucan crossing and busway crossing points.
2. Informal pedestrian crossing show junction isn’t working as desired.
3. Very narrow access to science park with poor sight lines.
Proposed Solution
First, we should always respect peoples desire lines. They are voting with their feet, it is obviously safe enough for them to do it day after day, and they have left plenty of evidence that it works by wearing down the grass. So we should make this a proper pedestrian route. This actually has two benefits: it moves a lot of the pedestrian traffic to the west side of the busway stop reducing the number of people at the science park entrance, and it allows a more “directed” path to the north side of that brick building.
Second, we should separate the CRC traffic and guided busway traffic as much as possible at the CRC junction. The busway traffic should follow their natural desire line which is straight on. There are wide turning splays for buses to access the busway from the CRC, yet no buses do this. We should remove them and make a straight on toucan in line with the busway. The CRC traffic would be given their own toucan on the north side of the brick building. Some of the existing railing (cycle parking) here may need to be removed, and the car stop line pushed back a car length or so. The space between the car stop line and the new toucan could usefully become an advanced cycle box.
Third, we should build a proper segregated footway to the north of the cycle track that links to the existing footway going to the “new” toucan. This would be built similar to the Coton path such that pedestrian traffic would be encouraged to seek the higher and safer ground.
Forth, we should straighten the line for access from the science park to the busway. The current facility bends away from the busway crossing, is very narrow, and limits the flow. I’ve seen times when people are queuing cross the busway to travel through this gate. On the south side, the highly restrictive chicane should be removed. People happily cross the busway at multiple points without problems, as here the buses are moving very slowly as they approach the station.
Lastly, we should alter the phasing of the traffic lights. A simple desire for people on bicycle is to wait as little time as possible, but we take very little time to cross a road. Therefore, I would suggest that bicycles are given a green light between every car phase, but only for a few seconds. They should also be given a green light whenever the busway is given a green light. The individual phases may need to be lengthened slightly, say from 25 seconds to 30 seconds to maintain the “capacity”, but the advantages it gives to bicycles would be huge. Also, the pedestrian crossing could be changed to a zebra crossing. This route would then become preferable to the slower toucan crossing further pulling people away. It would also allow for a much more pedestrian focused environment around what should be highly walkable area.
Created by Jack Thurston // 0 threads
The A40 between Abergavenny and Crickhowell is a narrow, fast trunk road and totally unsuitable to cycling. This is a vital connecting route in the area, between two neighbouring towns. There are sections where it is easily wide enough for a proper, separate 2m wide cycle path, or a wider shared use path with pedestrians.
This is a critical issue if the Usk valley is to be made accessible to people riding bikes.
More detail on the issue on the ACG website: http://abergavennycyclegroup.org.uk/cycle-route-to-crickhowell/
Created by Jack Thurston // 0 threads
ISSUE REPORTED AT ACG PUBLIC MEETING - 10 APRIL 2014
Crossing from Belgrave Road to Hatherleigh Road is often difficult due to fast moving traffic and no crossing infrastructure on the Brecon Road.
Created by Jack Thurston // 0 threads
ISSUE REPORTED AT THE ACG PUBLIC MEETING - 10 APRIL 2014
Making right turns when riding east on this section of A40 is difficult due to fast moving motor traffic.
Created by David Earl // 1 thread
Demolition of Edinburgh Building, warehouse and associated buildings and erection of office development of up to 41,750 sq. m. gross external area with development generally being of between 4 and 5 storeys (with limited areas of screened rooftop plant), a single tower element with two further storeys of accommodation, up to 189 car parking spaces (+/- 10%), up to 1325 cycle parking spaces (+/- 20%), up to 26 motorcycle spaces, hard and soft landscaping and ancillary facilities including staff canteens, meeting rooms, refuse enclosures, plant rooms, social break-out spaces etc. all to serve as the new office campus headquarters for Cambridge Assessment.
Created by David Earl // 1 thread
Bella Italia have applied to Cambridgeshire County Council to put outside seating (19 tables/38 chairs) at the Mill Pond outside their restaurant:
http://www.cyclestreets.net/location/57440/
(I'll put the detailed plan on the thread to follow).
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
What would the merits be of putting a crossing further upsteam of Abergavenny, such as where the historic ferry crossing was?
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The obvious cycle route to get to Gilwern Velo Park from Abergavenny is to join the canal towpath at Govilon. On arriving in Gilwern, the cyclist is faces with several issues: Poor surface of the canal path along Gilwern Wharf, steep access down from the canal path. No crossing point on Abergavenny road (without cycling all the way into Gilwern) and then a narrow de-restricted lane with steep sides and no verge leading to the turn into the outdoor centre. We would like to see many improvements made to allow safe access as part of the velo park scheme.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Apparently a route round NH Hospital was proposed once many years. There are many opportunities for the hospital to improve cycle (and foot) access.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
The infamous missing link in the Llanfoist-Brynmawr cycle path (route 46) is a huge barrier to its safe use by children as well as those who find the steep section of the diversion route impossible to climb.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
If the authorities are serious about expanding Llanfoist with new housing and de-trunking the A40 though Abergavenny, then they have to face this problem. A foot/cycle bridge, either just upstream of the existing bridge, or down stream into castle meadows would both be a solution, as would a new road bridge that would allow the old bridge to become single lane.
We all know that cost is the big problem here and that some of the options are not going to be possible, but we should campaign for some solution to be found.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Radical, and would please victorian steam enthusiasts... but how about actually re-instating the old high-level bridge? The footings are still there and, if extended, could link directly onto route 46 beside Waitrose, thereby avoiding the need to cross the busy road!
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The small industrial park that includes Aber-Rocks Climbing wall and Kingdom Come Softplay has no cycle path. There are various options for linking it to safe routes.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A key link for route 46 users, as well as people getting to/from Llanfoist village hall, is the strip of pavement on the north side of Merthyr Road. We believe there could be the width to allow this to be widened into a share-pavement allowing cyclists to avoid crossing the road twice in the space of a few hundred metres.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
One mainly for the pedestrians and anyone pushing a pushchair, but also impacts toddlers and young children riding on the pavement: On the corner of The Cutting and Merthyr Road, any car longer than a small hatchback blocks the narrow strip of pavement assigned to pavement users.
This is a key route for people coming from Abergavenny to access Llanfoist and route 46.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
1) More clear directions from Waitrose to the cyclepaths.
2) Many missed opportunities at Waitrose to encourage cycling:
a) Cycle stands often blocked with trolleys and equipment from the "garden" section.
b) No easy pedestrian/cycle access direct to Route 46 (west) when it would be easy to provide one.
c) anti-trolley bumps on main road in do have a flat path for cyclists, but they are not exactly friendly. How about actually having a cycle lane in and around the site?
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
There are relatively shallow paths that run from both ends of the bridge down to the A4143, but both have shallow steps that stop them being useful to cyclists. This means that people heading out of the hospital wanting to cycle down the A4143 towards Llanfoist have to cross the road with the traffic, rather than the safer alternative of crossing the bridge and coming down the ramp.
Note that openstreetmap's map of this is incorrect. I'll submit a correction (11-04-2014)
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Part of Union Road East is one-way, so cyclists heading from the hospital into town have to cycle 3 sides of an undulating square to reach Tudor Street. A contraflow cycle lane would solve this and encourage cycling.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
A very short section of Route 42 is steep and rutted. Not rideable by road bikes. Simply improving the surface would be a start.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”