Queens St/Princes St loop Consultation
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Shaun McDonald // 3 threads
The formal consultation has now been set to run from Tuesday 25th February to Saturday 1st March.
Created by David Earl // 1 thread
Outline application for up to 69 residential dwellings including houses and apartments, open space, landscaping and new access. | Field At Corner Of Coldhams Lane And Hatherdene Close Cambridge Cambridgeshire
New junction onto Coldhams Lane proposed, which includes a central island, the gap on the westbound side is 3.1m, about the worst possible for cyclists.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Created by Peter Lawrence // 2 threads
Please sign my change.org petition http://chn.ge/1epSzpK
Accident CC-23012014-0561 (Incident logged by the Cambridgeshire Police)
Leaving Zoology Department 18.15 walking east on Downing St, north side on 23 January, 2014. Car stopped in Downing st just west of Corn exchange road junction, obscuring the light. Lying on the road was a road sign warning cars of road works further left in Corn Exchange St, a needless warning. This 1 metre road sign had been placed on the pavement, occluding it seriously and had been, presumably, knocked over and left lying on the pavement with its black and invisible legs raised up about 10cm from the surface and its reflective surface tilted away (see picture). I tripped over the road sign in the dark and fell forwards injuring my face and forehead; the metal cut into my right leg. My glasses are destroyed, the leg of the sign tore my shoes.
I was taken to Addenbrookes and treated there. I left there ca 20.30 with head injuries and abrasions and now have an impressive black eye and surround.
I am seeking redress. I am exploring legal action against the County Council whose idiotic health and safety rules (for drivers, not for the rest of us) say that drivers should be warned in advance of even highly visible roadworks (in a 20mph area) and the company responsible for placing such a flimsy and dangerous sign right in the middle of a narrow pavement. Also am anxious that in general people who leave road traffic signs occluding the pavement or creating dangerous obstacles there, should be held responsible and penalised. I see these road signs often as I walk around Cambridge, they should be on or above the road, not blocking the pavement in my opinion.
The next day the same road sign, with my blood still on it, was back in the middle of pavement waiting to be knocked over again and even now forcing pedestrians to avoid it by diverting on to the roadway. I attach a photo of it taken on Friday the day following my accident with a diverted pedestrian on the right.
It was again fallen on the ground waiting to kill someone on Saturday night, presumably following the afternoon storms.
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Charlie Halliday // 1 thread
Proposed off-road cycle path following the A323, Norris Hill Road, to link Fleet with the existing cycle-path from Norris Bridge towards the centre of Farnborough.
It would enable cyclists to avoid Norris Hill Road, an unlit road with speed limit of 60 mph. Once built it would be possible to cycle from Fleet to Farnborough without cycling on roads.
This is in the Fleet Town Access Plan ref. PC9
Created by Jean Dollimore // 1 thread
The image above is an extract from the map published by TfL on 18th Dec 2013; showing the GRID routes in Camden with some of the names of the roads added. We should reply to the documents at:
http://www.tfl.gov.uk/roadusers/cycling/29172.aspx
Deadline 14th February 2014
Created by TMiles // 0 threads
The route marked between Headingley and Armley is heavily used as an intra-urban connector between north west and south west Leeds. Congestion can be particularly acute because it uses one of the few crossing points over the River Aire and the Leeds and Liverpool canal in the west of the city.
The addition of cycle lanes in both directions along the length of this route has the potential to encourage a modal shift from cars and make a real impact on congestion. These cycle lanes would help to establish a more comprehensive network outside the radial routes, and would be a useful on-road addition to the Leeds Core Cycle Network (forming itinerary Ar - W). The proposed route offers connections to the improved cycle facilities on Kirkstall Road (A65) and the future CityConnect facilities.
The addition of cycle lanes would be of particular benefit to uphill cyclists, minimizing their conflict with motorists.
In addition to the environmental, economic and health benefits, the project would improve car-free mobility between three very different communities in Leeds: Headingley, Hyde Park and Armley.
The width of the pavements along the northern sector would allow for a widened carriageway in order to accommodate the cycle lanes. The loss of pavement width would be outweighed by the benefits of calmed traffic. The carriageway of the southern sector is already generous and would make the implantation of cycle lanes relatively straight forward.
Created by Shaun McDonald // 2 threads
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Norwich Road, Vallet Road, and Chevallier Street. This is a major route for people travelling north in and out of the city.
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Felixstowe Road, Nacton Road and Bishops Hill. It's a cross roads with one significant use arm at a 30 degree angle
Created by Shaun McDonald // 1 thread
Travel Ipswich (Ipswich Borough Council/Suffolk County Council have a new consultation re proposed designs for the junction of Woodbridge Road and Argyle Street. It is a t-junction of which 2 arms are one way and part of the gyratory.
Created by Richard Moss // 1 thread
An umbrella issue for discussion of general matters relating to reviewing planning applications in the city and south cambs.
Created by Hester Wells // 5 threads
The County Council is planning to redesign Tenison Road.
East Parade forms part of the one-way Leeds city centre loop. On the stretch shown it is three-lanes wide, a layout that encourages cases of excessive speed.
The addition of a wide hybrid or segregated cycle lane would improve cycle journeys from the railway station and the south of the city towards the Universities, hospital and north of the city.
Towards the junction with the Headrow the segregated system will end to allow cycles and vehicles to correctly position themselves to turn left or go straight ahead. In this final section the road surface should read, from left to right: (1) cycle lane, turning left (2) standard vehicle lane, turning left (3) cycle lane, straight ahead (4) standard vehicle lane, straight ahead (5 - if space permits) standard vehicle lane, straight ahead. Nevertheless, the layout should allow cycles continuing straight across to adopt their position without conflict from left-turning vehicles. An example of such markings can be seen in Cambridge (Hills Road railway bridge, inbound) or in Nantes (http://www.flickr.com/photos/cyclable/9526360512/).
Provision for delivery vehicles should also be considered here, as the left hand lane is frequently occupied by vans or lorries under the current system. To avoid conflict with cyclists, it would be most sensible to site such parking to the right of a segregated cycle lane.
The project would bring additional traffic-calming benefits, with the reduction of the road width to two lanes along much of its length.
Created by TMiles // 0 threads
The width of the road after the traffic lights lures south-west bound cycles into a left position that becomes problematic because of the build-out at the later pedestrian crossing. They either have to stop to let traffic pass through this pinch point or take the risk of readjusting their path to the right in order to join the main stream of vehicles.
One solution would be to guide cycles into the correct position with cycle lane markings from the traffic lights to the pedestrian crossing.
The second solution would be to cut a cycle-lane across the build-out, including a mini pedestrian crossing that cyclists would have to respect. This short stretch of lane should be flush with the road surface and must be kept swept regularly in order to be effective.
Created by Shaun McDonald // 1 thread
The cycle lane on NCN1 on Stoke Park Drive are rather narrow, thus you cannot cycle within the cycle lane. Having the cycle lane there means drivers often don't give as much space when overtaking. There are also many traffic island pinch point which make it extremely dangerous, as drivers overtake and cut in just before the island.
Created by MJR // 1 thread
"The adopted Core Strategy designated South East King’s Lynn (this area) as one of the strategic ‘urban expansion’ areas around King’s Lynn. The independent planning inspector who examined the Core Strategy explicitly stated that, compared to the potential alternatives, the expansion areas identified (including South East King’s Lynn) were preferable to the alternatives in meeting the Borough’s need for substantial numbers of additional dwellings over the plan period. It is relatively unconstrained by flood risk and infrastructure problems, etc., and relatively easily accessed and serviced.
5.2.4 Policy CS09 of the Core Strategy, ‘Housing Distribution’, provides for an allocation here of at least 1600 new homes, with supporting infrastructure. It also identifies this as establishing a direction for future growth beyond the plan period (i.e. beyond 2026). From the sites put forward during the consultation, informed by the work of the Prince’s Foundation for the Built Environment in connection with the Neighbourhood Plan (see below) a total of 3,000 to 3,500 additional dwellings could be accommodated in the fullness of time. This is indicated diagrammatically in figure 7 of the Core Strategy.
5.2.5 This is likely to be the largest residential development opportunity in the Borough for many years. It provides a once-in-a-generation opportunity to form a thriving and vibrant new community immediately south of King’s Lynn. The intention is to integrate a large number of new homes and associated facilities with an existing village community, generate a range of major improvements in a range of areas, and shape a place that promotes a sense of community among its residents, existing and new." (From the Borough Council KLWN, "Preferred Options for a Detailed Policies and Sites Plan", October 2013)
Created by Kevin Ablitt // 0 threads
The west bound ( out of town ) on-road cycle lane is extremely narrow. As are the motor vehicle lanes to accomodate eastbound bus lane. There is plenty of space on verges etc to improve this facility but may mean moving lampposts etc.
Created by Kevin Ablitt // 1 thread
Very narrow carriageway and very narrow footpath on one side only ( I have seen a woman struck on the shoulder by a bus mirror on this route).
High number of pedestrians and cyclists at peak times, poor visibility and abrupt hill make this a very dangerous route.
Created by Kevin Ablitt // 0 threads
Very narrow and winding. This section of Stone Lodge Lane should be considered for reduced access, one way, filetered permeability or complete closure to motor vehicles.
http://www.ipswichstar.co.uk/news/ipswich_child_injured_after_collision_on_stone_lodge_lane_1_3211524
This isnt the first such incident.
Created by Matthew Phillips // 2 threads
The Mount Oswald development received outline planning permission a while ago. A full application has already gone in for the first phase, at the southern end of the site. It appears connections will be provided for cyclists and pedestrians to the A167 (car access is from South Road). The greater concern is whether an opportunity is being missed to create a new off-road route parallel to South Road.
The picture is taken from the Design and Access Statement of the planning application for the first phase. The big unknown is the middle area, where the large self-build houses will be. No plot divisions are shown on the plan. Will there be public access north-south through this area?
South Road is not shown as a strategic cycle route in the County Durham Plan. The Mill Hill Lane route and the A167 are accorded the status of primary routes, but there is not even a secondary route along the South Road axis, despite it being the obvious route to the University from the south and from all the new housing on Mount Oswald.
Created by Matthew Phillips // 1 thread
The cycle path across the top of the golf course has no barriers at either end but does not seem to suffer from abuse by motorcyclists. However at two or three locations along the path there are staggered half-barriers on paths which lead to the housing estate to the north.
Barriers like this cause problems for longer cycles, such as tandems and recumbent cycles, as well as for families with child trailers or tag-alongs. Such barriers should preferably be removed and we need to seek to ensure that new developments do not introduce further barriers.
Created by Fraser // 0 threads
Travelling along Fore Street from the East where it splits with Key Street there are several traffic calming patches and speed bumps that are difficult and dangerous to negotiate on a bike.
In particular the three sections of cobbles; as the street becomes one way just before Fore Street Pools, just before you cross Star Lane, and just after crossing Star Lane.
They are so ragged that as a cyclist you have to almost come to a stop, where as other road users can travel over them at ~20mph.
This makes them extremely dangerous as just after accelerating away from the traffic lights you then need to slow almost to a stop and weave your way through the cobbles while the traffic behind you is expecting to carry on and the street is too narrow for them to safely overtake.
The section of Fore Street between Star Lane and Eagle Street has better speed humps (still not great, but a dream compared with the above mentioned cobble sections!) with flat section at the sides so that bikes may pass them safely. However the flat sections are occasionally blocked by parked vehicles forcing cyclists over the speed humps.
The less said about the time it takes to negotiate these three sets of traffic lights the better!
Martin Lucas-Smith // 2 threads
This junction has a new cycle lane over a widened pavement. This looks like very substandard infrastructure, encouraging pavement cycling, that should never have been approved by the County Council.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Chris Peck // 1 thread
Route betweeen NCN 22 and Waverley Abbey - alternative to major road.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by Caroline Page // 1 thread
Eastbound cyclists wishing to avoid the double roundabout at this point are routed onto the pavement, across the exit for the Shell garage (often to the surprise of exiting drivers), and then (still across pavement) onto a piece of decommissioned road used as access and double-sided parking for a parade of shops. This road has a separate car entrance from the roundabout.
Its a lethal combination -I have personally once been hit by a car turning fast from the roundabout on the road entrance as I entered it from the bike route. The driver was very angry because it was my fault that she didn't look out for me. You then have to cycle between two sets of parked cars/vans: there are frequent hazards: suddenly opened doors, people reversing/leaving the parking place without looking behind.
At the end, the cyclist is signed again onto pavement heavily used by schoolchildren/old people at the eastbound Heath Road Roundabout bus stop, before being routed back onto the road along the pull-off for the bus itself.
My personal view is that this scheme has been created and signed by a maniac
Bike users can turn right and cycle contra flow using a very narrow on road cycle path. Motorised traffic cannot do this, Park Road is one way to motorised traffic. Traveling down Queens Road there is no signage to suggest that bike users can turn right. Once into Park
Road there is awkward raised 'island' to manoeuvre around. Suggest signage saying right turn for bikes only and reconsider design of Island to make it less of an obstacle.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Well lane has been blocked to through motor traffic creating a nice quietway for walking and cycling.
However where it meets Percival Road a dropped kerb has not been installed meaning that cycles, pushchairs and wheelchairs have to bump down to cross Percival.
A couple of dropped kerbs and perhaps a parking restriction would really open this up as a nice cycle quietway.
Created by Stephan Matthiesen // 0 threads
Road was converted to one-way recently, forcing cyclists from Kings Buildings out onto busy West Mains Rd where previously they could cycle within the campus to the toucan at the NE corner.
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by Cycling Dumfries // 1 thread
At the moment there are toucan crossings from the Whitesands up to the High Street past the lower entrance to the Loreburne Centre (where the buses stop) but there is no actual cycle path so you end up illegally on the pavement. It would be a useful route otherwise, as long as cyclists can get past the bus stops (and waiting bus passengers).
Kate Ravilious // 1 thread
no cyclist ever uses this junction as the engineers intended. It doesn't function well and is dangerous. Needs reviewing.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Peter Loader // 0 threads
The Maple Cross to Rickmansworth cycle route is one-way along Berry Lane (between Church Lane and Field Way, Mill End).
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
I know this has been proposed before, but I wanted to add an issue to Cyclescapes in the hope that it might come up again. We can collect reports and evidence here.
Reopening the Belmont Viaduct to cyclists and pedestrians could greatly shorten and improve a lot of journeys into and across Durham.
Previously Durham Council (before the County Council?) were awarded lottery funding for this. I think the issue was with landowners, and so the funding got diverted to projects outside of the city.
Created by Dan // 1 thread
Traffic lights will not change for cyclists when on the sensor (at night).
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Martin Lucas-Smith // 4 threads
The cycle lanes here are a mish-mash of narrow legacy infrastructure, and are often awkward to use.