Modify gate on cycle-path 46 near the castle
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate where route 46 enters castle meadows near the castle is poorly designed: very tight for long bikes such as tandems.
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate where route 46 enters castle meadows near the castle is poorly designed: very tight for long bikes such as tandems.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The cycle gate at the underpass between Llanfoist and Abergavenny is poorly designed: Impossible to pass with a 2-seat bike trailer, and very tight for long bikes such as tandems.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Several people mentioned that some people do cross the pipe bridge: Would it be possible to modify the bridge to make it possible for it to be an official crossing point?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Can anything be done to improve this busy junction for cyclists and pedestrians?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
School traffic from King Henry VIII School, exiting the school onto Pen-y-Pound, uses this very narrow route as a quicker way, at a busy times, of getting to the A40 or to Old Hereford Road. Can anything be done to discourage drivers from using these narrow lanes as a rat-run?
The issue of fly-tipping on Deri Road was also raised.
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Waiting to turn right onto Chapel Road from Brecon Road can be unpleasant. Can something be done to improve this junction for cyclists?
Created by Sam Charrington // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
Turning right from Park Street onto Pen-y-Pound, by Tesco, can be awkward, as eastbound cars often come around the bend from Frogmore street very quickly. How can this be solved?
Created by George Coulouris // 1 thread
We have of course been campaigning for a cycle and pedestrian connection enabling more direct movement between Kentish Town Road and Grafton Road for years. At one time a semi-official route via Arctic Street was actually established, but the landowner eventually vetoed it for various reasons.
How can we revive the campaign for this?
Created by Al Storer // 1 thread
The Draft Cambridgeshire Long Term Transport Strategy and Local Transport Plan Refresh has, as a City Deal item, a £43million project to create "Comprehensive segregated bus priority / Busway on Newmarket Road into Cambridge between Airport Way and Elizabeth Way / East Road."
This is quite clearly an opportunity to get far better cycle provision on this corridor.
Created by MJR // 0 threads
For a change, I tried following the route signs for the station today. As well as a mystery tour near the Grafton centre where the signs simply stop, my route was blocked at Gresham Road by "WET TAR" and a sign proclaiming it. No diversion was signed and there were no advance warning signs that would have let me pick a better route earlier. Plenty of people were riding along the footways - enough that it was too crowded for me to feel safe doing so. I performed a U-turn, waited a second time at the crossroad traffic lights and rode along the very busy Gonville Place and Hills Road instead.
I've tweeted at Cambridgeshire County Council and Cambridge City Council in https://mobile.twitter.com/mjray/status/453926972843118593 because I don't think that is legal - a cycle route suddenly being blocked by wet tar does not comply with the code of practice on safety at streetworks, which is required by law. I'm disappointed to encounter this in Cambridge.
Created by BrianInBeeston // 0 threads
The DfT have contracted consultants to come up with a concept for a north south cycle route broadly following the alignment of the HS2 railway line, but linking up key points of interest and centres of population along the way. For the section from East Midlands Airport to the new station at Toton, a key issue is where the cycle route should cross the Trent. There is a compromise to be made between the shortest route from EMA-Toton and locating the bridge where it would serve the largest population. A more Eastern bridge would serve large population centres in Beeston & Clifton, whereas a more western bridge would be a more direct route. A possible compromise would be to locate the bridge near the existing rail bridges at Trent Junction near Trent Lock.
Created by Sam Charrington // 0 threads
The National Speed Limit currently applies on this very narrow lane. There should surely be be a 20mph limit here? Pentre Road runs along the tops of a number of residential streets on the edge of Abergavenny. It is popular with cyclists and pedestrians. Much of the lane is extremely narrow, with some blind bends, and it is not possible to drive safely along here faster than 20mph.
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
We aren't aware of plans to replace this particular crossing with a bridge, but it does have the highest risk score of any crossing in the area, so will e on the Network Rail radar.
Created by BrianInBeeston // 0 threads
Following a number of deaths at crossings in this area. This footpath which crosses the midlands mainline is being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
Following a number of deaths at this crossing where a footpath crosses the midlands mainline, it being considered by Network Rail for replacement with a bridge. Unclear at this stage if it will have steps or ramps
www.nottinghampost.com/Plans-new-bridges-railway-crossings-revealed/story-20914367-detail/story.html
Created by BrianInBeeston // 0 threads
There has been a surge in use of the station during tram works. Some new users may continue using the station after completion. There is no car park so the village is full of cars. The cycle racks aren't heavily utilised, might be more cycle usage if secure cycle parking were provided.
Created by BrianInBeeston // 0 threads
A white dividing line was put down on University Boulevard in error by the tram contractor. It was not agreed by the City Council.
The white line will be removed. However the cycle path alongside University Boulevard is to be programmed for resurfacing - this will remove the white line and upgrade the surface. This work will be undertaken and paid for by the tram contractor as part of the works they are undertaking to upgrade cycle facilities along the new tram routes.
Created by Heather Coleman // 1 thread
When I popped into the Cambridge Wine Merchants last night, there were signs on all the posts and sheffield stands saying "no cycle parking from 6am, 7th April". I assumed some royal visit. I asked the man in the shop if he thought people not being able to park would affect trade and he said he hoped not. However, by the post where I normally park there's a big "road closed" sign, 6am-6pm (I think).
He is under the impression that there is filming going on from 7am-10am. It is period filming in the 1950s therefore you can't have sheffield stands (probably not invented) or modern bikes.
My main question/gripe is, when I see a "road closed" sign, I assume I will be able to get through even if I need to dismount and wheel my cycle. Sometimes, if it's a long walk, it may be quicker to cycle via another route. From the nature of what I've been told is going on, it sounds to me as if actually the road will even be closed to pedestrians, well unless they're wearing authentic 1950s dress.
Does anyone know any more? Does anyone know anything about the legal status of forcing pedestrians to take a lengthy diversion from what is the public highway? There are various cyclescape threads which have mentioned that although cars only have a permissive right to use the road, pedestrians have some stronger right. Can they force pedestrians and dismounted cyclists to go another route, when it's not an issue of national security?
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by timlennon // 0 threads
There are a lot of schools in our ward, and a lot of traffic. Children should be able to cycle to them safely without having to share space with high volume, fast traffic. Schools should all have 20mph zones, with car-free access around the school, and protected routes to arrive there.
this path isn't a right of way it has a locked gate.
sketch of route following verbal discussion between Brian & SB.
Created by timlennon // 0 threads
Bushy Park is a pleasant place to cycle and provides a number of potential routes for people wanting to get around the area. However, it should be possible to leave the Park at the Holly Road exit and proceed without the current level of potential conflict and threat inherent in the present route. We’d like to see protected space for cycling allowing people to leave the Holly Road exit and get to Broad Lane and the nearby schools - Denmead and Carlisle Infants.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Earl // 1 thread
It is intimidating to use this roundabout because of the high shrubbery in the middle. It is supposed to slow traffic down but my subjective feeling is that it doesn't
Anon // 1 thread
Wandsworth Council in TMO 1644 propose removing the contra-flow segregated cycle track at the eastern end of Putney Embankment to allow a hoarding to be built around the Thames Tideway tunnel construction site. The track will be re-opened when the work is complete, but this could take at least a year. It is proposed that eastbound cyclists join the Upper Richmond road by the Dukes Head pub and then continue on this road. Wandsworth Cycling Campaign objected to this on the grounds that the Upper Richmond Road is extremely heavily trafficked and the proposed diversion involved cycling past a row pf parking bays . This would be very difficult and hazardous for the mix of cyclists using the Thames Path of which this forms part. We asked that the parking bays be temporarily removed and replaced by a 1.5 to 2 m cycle lane separated from the motor traffic by wands or similar. For west-bound cyclists using the narrow lane left on Putney Embankment past the work site, we asked for the installation of 'Do not overtake cyclists' signs.
Created by Caroline Page // 1 thread
Significant domestic car parking in the advisory cycle lane of westbound lane combines with heavy traffic jams to obstruct/block westbound passage to cyclists in rush hour. Generally there is a section of this route where pavement pushing is unavoidable
Created by Angela Dyer // 1 thread
Proper surface on the link from Butterfield Lane to Holyrood Crescent
Created by jpennycook // 1 thread
Just to the south of the junction with Sullivan Road, there is a low hanging branch at decapitation height. It is hard to see at night.
Created by TMiles // 0 threads
A short section of cycle path allows cyclists to skirt around the traffic lights when turning left from Westgate into Oxford Place.
However the section ends abruptly in front of on-street car parking and the cyclist is forced to give way to other traffic in order to join Oxford Place.
It should instead lead smoothly into a cycle lane that runs the whole length of this street.
Created by Gipsy Hill // 2 threads
Introduction:
Quietway7 links a cycle route from Elephant & Castle (E&C) with Crystal Palace, and was routed by TfL to be via Dulwich Village, West Norwood (Thurlow Park Road), Gipsy Hill and then Crystal Palace (via Farquhar Road).
The route from E&C southbound is in Southwark (to Dulwich) then is in Lambeth (Turney Road, Rosendale Road/Thurlow Park Road, Hamilton Road, to Gipsy Hill), then goes back into Southwark (from Gipsy Hill to Crystal Palace). Southwark had their part of the quietway consultation approved.
Lambeth delayed their decision to June 2017, and was then subsequently “called in” as there was widespread concerns from both the local community and cycling groups for parts of the route. Cycling groups unanimously objected to the proposed design along Gipsy Hill by: Southwark Cyclists, Lambeth Cyclists and Wheels for Wellbeing. 70% of respondents objected to the the design on Gipsy Hill. Gipsy Hill is a busy Local Distributor Road and bus route. Gipsy Hill has “insufficient road width” for a segregated track. The original proposed design meant motor vehicles “will encroach on the advisory cycle lane” to allow oncoming motor vehicles to pass.
Gipsy Hill Options:
There are alterative options to avoid Gipsy Hill. Southwark Cyclists have supported the design option to follow LCN23 downhill all the way along Dulwich Wood Avenue and then using the other side of Long Meadow (so not using Gipsy Hill), with a new track behind the bus stop.
See navy dashed line on sketch attached (mauve was the proposed Q7 design, red is LCN23)
This design is quieter and safer than using Gipsy Hill, and avoids the proposed dangerous junction Gipsy Hill/ Dulwich Wood Avenue, near the rail station. This integrated design also allows greatest cycle access to local amenities, schools, shops, and parks in Dulwich, West Dulwich and West Norwood. There is interest and outline support from Southwark to explore this option.
Next Steps:
Lambeth are now actively progressing engagement and revised designs for their part of the route, with a new consultation process due in September. There is potential for an improved option at Gipsy Hill, but this is likely to need new additional funding from TfL.
Suggested, to let local Gipsy Hill Ward Cllrs (Lambeth) and College Ward Cllrs (Southwark) and local cycling groups know your views.
Background:
Lambeth proposal that was called-in, see reports:
- Quietway 7 - Elephand Castle to Crystal Palace - Decision Report – 12 June 2017
- Appendix B - Quietway 7 - details designs (Gipsy Hill pages: 23, 46-49)
http://www.cpneighbours.org/gipsyhillquietway/
Thurlow Park Ward Cllr updates:
http://thurlowparklabour.org/post/162548844962/quietways-engagement-next-steps
TfL Quietway 7 Programme (Elephant & Castle to Crystal Palace) - Proposed changes in Lambeth - West Dulwich area
https://consultations.tfl.gov.uk/cycling/lambeth-q7-wd/
LCN23 Map:
https://www.openstreetmap.org/relation/2707#map=17/51.42643/-0.08336
What are Quietway?
London Cycling Design Standards, Chapter 1 (page 15):
Quietways “..are aimed at new cyclists who want a safe, unthreatening experience.” The key principles for Quietways include:
o Routes should be on the quietest available roads consistent with directness;
o Routes should be as straight and direct as possible;
o where they have to join busier roads, or pass through busy, complicated junctions, segregation must be provided;
http://content.tfl.gov.uk/lcds-chapter1-designrequirements.pdf
Created by Anna Langley // 2 threads
This intersection needs a right turn light for bikes turning from St Andrew's Street into the Downing Street contraflow lane.
Doing so feels unsafe with buses coming up from behind, and little opportunity to get across the intersection.
I'm considering setting up a 38 Degrees petition on the matter, but wanted to see if this issue had been campaigned on before.
Hungate Bridge at the Navigation Road end is heavily bollarded on one end people on bikes and variants and people on foot are forced into a narrowed corridor by bollards. Yet, the width of he route is not restricted on either side.
It is unnatural and unnecessary. It brings people on bikes and variants into contact with each other and with people on foot or in wheelchairs, etc. It seems to be 'traffic-calming'. To my mind this undermines active travel messages and initiatives by making movement more complicated and fraught for all users.
Created by John Metcalf // 1 thread
"Hertfordshire County Council (HCC) has recently undertaken a feasibility report to investigate cycle links to the new Verulamium Park (Ver Park) Route link to NCN 6 from the King Harry Lane area. We have looked at ways to improve the cycling and walking environment; particularly where this would improve the continuity of cycle routes and the movement of people via active modes around your area. A section of shared use cycle route has been recently provided by the developer Linden Homes and the intention is to extend this facility to Abbey Avenue and northwards towards The Ramparts via an upgraded traffic signal crossing point into Verulamium Park.
The proposals include the following:
· Upgrade the existing traffic signal controlled crossing near Verulamium Park access to a Toucan Crossing,
· To provide improvements to the footway areas on both sides of the traffic signal controlled crossing to make it both suitable for pedestrians and cyclists, and linking into the new section of shared use footway/ cycleway that the developer has recently provided.
· To the south of the new roundabout, on the western side, the existing footway will be widened from 0.9-1.1m to 2.5m to continue the shared use route towards Abbey Avenue.
To upgrade the existing uncontrolled crossing at King Harry Lane jw Abbey Avenue by increasing the widths of the existing pedestrian refuge to widths that can accommodate both cyclists and pedestrians.
This option has been carefully evaluated and full consideration has been given to the likely effects that it may have on residents.
Please find attached a plan which shows details of the proposed scheme for Ver Park Highway Link (Cycleway/ Footway).
At this stage we are intending to implement the proposals during the next financial year, 2014/15.
As such we are now finalising the design and we are interested in hearing your views or any comments you may have regarding the proposals"
Initial comments by John Metcalf
Overall to be welcomed as better than what is there already. But, it could be improved?
1. Traffic entering Abbey Avenue is likely to be going too fast for a safe crossing for those walking or cycling. This is a rat-run to avoid the King Harry roundabouts. Therefore tighten the radii of the junction and make a raised crossing (on a hump). Do we want a Tiger (Zebra for walkers and cyclists) crossing?
2. The crossing of the new roundabout exit into King Harry Park is hazardous. It needs to be upgraded with a humped crossing (and a Tiger?). Is this sufficient or should there also be measures to slow down the traffic entering and leaving King Harry Park.
3. The best solution would be to upgrade the ROW footpath from the toucan crossing of King Harry Lane to Rowlatt Drive
Created by Jack Thurston // 1 thread
Cycle Route 46 from crosses the old stone bridge across the River Usk between Abergavenny and Llanfoist. There are good, safe and direct cycle paths on either side of the bridge, but the bridge itself is very hostile for cycling, and walking. It is on the A4143 and there is heavy often fast traffic most times of the day. The footway is very narrow and only on one side of the bridge. Although short, this is a difficult section to negotiate, especially for inexperienced or young cyclists.
Created by DB // 1 thread
I am cycling on the snakey trail every day, and there is a high risk that somebody falls into the Cherry Hinton Brook one day. The path and bridge is really too narrow and many people are taking it both ways.
Route proposal for the link from Prospect Road/Verulamium Park to the start of the Alban Way.
The route is a shared, wide, pavement with a width around 3 metres- in line with minimum width for a shared route.
Documents are available at http://www.stalbans.gov.uk/planning/Planningpolicy/greenring/hccsiteb.aspx
Please have a look at the thread on this as there are a few point which STACC will bring out, you may want to consider these in your response.
Please return any comments to Clare Martin via phone, email or post.
Please also contact Clare if you have any further queries about the proposed works.
Clare Martin
Project Engineer, Integrated Transport Planning
Highways
Postal Point CHO317
Hertfordshire County Council, Leahoe Annexe, Pegs Lane, Hertford, SG13 8DN
t: 01992 658478 Comnet / Internal: 58478
email: Clare.Martin@hertfordshire.gov.uk
Created by Shaun McDonald // 1 thread
Planning application: http://planningpages.midsuffolk.gov.uk/online-applications/applicationDetails.do?activeTab=summary&keyVal=_MSUFF_DCAPR_92778
There are concerns about no or too little improvements for walking and cycling along Paper Mill Lane with the increase in traffic caused by the development.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Alex Jenkins // 1 thread
Following recent engagement on the Liveable Streets programme in the Bow area, we are planning to trial some changes to the road layout. These changes are based on suggestions made by local residents and stakeholders.
This trial will help us understand the effects these changes have on the road network and allow residents and businesses to experience the positive impact reduced traffic has on the local area.
During the trial we will be running several events and activities to take advantage of the reduced number of motor vehicles passing through the Bow area, and encourage local journeys to be made by sustainable modes such as walking and cycling. Keep an eye out for more information on these.
Please note that as a part of our preparation for the trial we have consulted with the emergency services, bus operators and Transport for London to ensure they can deliver their services using the changed road layout.
Created by Guy Hill // 1 thread
If it is not bad enough in a cycle city that the Great Northern Road, the new road to Cambridge's main train station and cycle parking, does not have a segregated and safe cycle paths, the new development is now being proposed which will prevent a segregated cycleway from access to the Station a Devonshire road.
Does anyone agree that there should be a segregated cycle access to the country's largest cycle park?
Created by cobweb // 0 threads
Permission given for 286 homes. Concern was raised in 2010 about the positioning of the 715 cycle parking spaces.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
The A4143 heading up towards the Hospital is plenty wide enough for a dedicated cycle path on one side or the other (we suggest the west side). This is often a busy and fast road. (Note this this would also solve the safe cycle access to the climbing wall and softplay.)
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by North Devon Cycling Forum // 0 threads
Two-way traffic for cyclists on Barbican Terrace-Litchdon Street, allowing to cycle from the Strand to Summerland Street
Created by Rosamund Humphrey (Admin Officer) // 1 thread
20/04969/FUL: Three storey front and rear extensions, alterations to the office building, replacement cycle store, new plant compound and installation of EV charging points.
Babbage House, Castle Park, Cambridge, CB3 0AT
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Adam Edwards // 1 thread
Hatfield has the makings of a good cycle path network. However, the cycle path from the station to the town centre ends at the west end of French Horn Lane and fails to then connect to the University to the south or the Business Park (EE HQ, etc) to the west.
WelHatCycling are lobbying (most recently our MP Grant Shapps) to get this missing link filled. The route is shown on the map and is entirely unobstructed. The key work is a toucan crossing of Queensway, needed not only for the cycle route, but also to open up the north east end of the town centre to passing trade from people cycling and walking via the town centre.
Created by David Butler // 1 thread
Consultation of cycle lanes and junction changes by Manchester City Council