Greater Anglia Cycle Strategy
Greater Anglia has just issued a consultation on cycles at stations and on trains
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Al Storer // 4 threads
A citywide (and indeed beyond) problem is poor consideration given to the needs of cyclists and pedestrians during road works- eg "cylist dismount" sign use
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by aSemy // 0 threads
https://www.citizenspace.com/bristol/city-development/baldwin-street-cycle-safety-fund-scheme
Overview
The purpose of this scheme is to address the large number of crashes involving cycles on Baldwin St, at the junction with Queen Charlotte Street.
We propose extending the existing cycle track at Welsh Back and take it across the junction via a humped crossing. We have introduced a ‘floating bus stop’ to separate buses and cyclists. There will be a formal crossing point for pedestrians to access the stop from the footway.
A small number of parking places would be removed but loading, bus and taxi facilities are retained, although altered.
Created by Shaun McDonald // 0 threads
The legal pavement cycling is suddenly not allowed 3 car lengths before a cycle shop near this junction which has toucan crossings and cycle paths on all other sides of it. Why can't it be continued to the bike shop for a safe cycle route to/from the junction away from traffic?
Created by Shaun McDonald // 0 threads
The cycle cut through between Appold St and Worship St is often blocked by pedestrians or Taxis dropping off passengers. It's also too narrow, thus can only be used one way, and isn't suitable for higher levels of two way cycling.
Created by Jean Dollimore // 5 threads
Camden Council proposes major improvements to Cobden junction – the junction of Camden High Street with Crowndale Road and Hampstead Road at its southern end.
They propose the following measures:
- eliminate the unnecessary northbound road on the east side of the island
- gain extra footway space on the east side of the road (uses to include cycle parking, trees, seating)
- widen the footway outside Mornington Crescent Station
- safer, quicker and simpler pedestrian crossings
- improved link for cyclists to the Mornington Crescent quiet route (from Arlington Road).
- new ASL boxes with lead-in lanes on the approach to the junction from Eversholt Street, Crowndale Road and Hampstead Road.
- re-site the statue of Richard Cobden and the war memorial
Proposal for contraflow cycling on Crowndale Road:
A few months ago, we were shown designs for a contraflow on Crowndale Road between Hampstead Road and Bayham Street with some junction changes at the latter to accommodate it. Unfortunately, this was rejected by TfL on the grounds that it would delay buses. This consultation notes that the layout has been designed to accommodate the contraflow at a future date.
This consultation also says that in addition, alternative options for providing a west to east link are being explored at both Delancey Street / Pratt Street and Oakley Square. We need to encourage Camden to pursue these essential links. In the case of the latter, there is an urgent need to allow cyclists to make right turn right into Hampstead road from the southern end of Mornington Crescent.
See consultation on Camden Council website:
https://consultations.wearecamden.org/culture-environment/cobdenjunction
Created by Aidan Van de Weyer // 0 threads
The Hills Road / Regent Street axis of the Catholic Church junction was resurfaced overnight (28-29 August) as part of the junction upgrade.
Many of the damaged iron works (manhole covers, etc) have not been changed. Some are in a bad state and quite dangerous because they have worn smooth, sunk or tilted.
I have contacted the Traffic Signals team at CCC, as they seem to be responsible for the works, and they should be getting back to me.
If anyone else fancies having a go at finding out what is going on and whether anything can now be done, it would be very welcome.
Created by George Coulouris // 1 thread
For discussions on the design of the new website, following the CCC Committee decision to initiate the construction of a new CCC website.
A working party has been set up, consisting initially of George, Jean, Ben and Geoff.
Created by George Coulouris // 1 thread
We've launched the campaign for a major upgrade to the cycle tracks on Tavistock Place/Torrington Place. The campaign is fronted by this video:
http://camdencyclists.org.uk/camden/campaigns/ssl-upgrade/index_html
This issue provides a forum for discussion by (a) CCC committee and (b) campaign activists. Please create threads as necessary.
Created by Ben Edmonds // 1 thread
Redesign of street to include two-way for cyclists, one-way for motorists, light segregation and bus stop islands.
Martin Lucas-Smith // 1 thread
Changes to car parking in the Kite are proposed.
Cycle parking is not being included.
Created by Dan Doherty // 0 threads
Very narrow cycle lane between University Road and Violet Road and Broadlands Road. Encourages very close passes when cycling in the lane (with 10cm of your handlebars), or aggressive impatient driving if you cycle outside of the lane. Additionally to cycle within this cycle lane it is necessary to cycle closer to the kerb than the recommended 50cm from kerb (http://www.cyclescheme.co.uk/community/how-to/road-positioning)
Lane markings are extremely faded. Lane contains several drains.
No cycle lane would be better than the current cycle lane.
Created by Shaun McDonald // 0 threads
The railings here probably should be removed. They promote faster motor vehicle driving, as drivers think it's safer as nothing will walk out in front of them.
Created by Robin Heydon // 1 thread
Planning application for flats near the Busway Cycleway
Created by Martinn // 0 threads
There is a set of bollard which have been placed that prevent cycling as a family, in order to reduce car journeys. Negotiation without manhandling the Bike and dismounting is impossible when riding a Tandem, and requires even more effort when a Tag -along is connected. Can these obstructions be removed please
Created by Robert Asher // 1 thread
Hello, I'm wondering how many other Cambridge cyclists have shared the experience I've had (about once per month now) regarding a particular elderly lady who insists that bikes are not allowed on the "footpath" adjacent to the Trumpington allotments, between Shelford Rd & the new busway in CB2. This path seems clearly demarcated as a shared pedestrian-cycle path on the cycle maps provided at the council link (below). However, it is not clearly labeled as such on the path itself, leading her to become quite angry with any cyclist who gets near her & her dog while they're out walking (and obstructing the path to underscore her point). "It's a footpath" she yells, and storms away.
So my questions are 1) am I correct in interpreting the council map (below) as permitting bikes on this path and 2) how might one go about requesting proper signage, clearly saying bikes & pedestrians are both welcome?
Thanks for any feedback, Robert
https://www.cambridge.gov.uk/sites/www.cambridge.gov.uk/files/documents/cambridge-cycling-map.pdf
Created by Shaun McDonald // 1 thread
The "cyclist priority route" on NCN1, Felixstowe Road obviously isn't that subjectively safe as I've seen someone cycling on the pavement southbound rather than on the road.
http://www.youtube.com/watch?v=DItGP0Lt200 is a video of the road from another occasion.
Broken headlight glass from a couple cars has been there since 8th August
Created by Shaun McDonald // 0 threads
There is currently a bit of a conflict between pedestrians and cyclists around Stoke Bridge, between St Peter's Street and Dock Street, where there is the legalised pavement cycling.
To resolve this I would propose removing a lane of traffic (which is only needed for a very short time at peak times, and a small modal shift through improved infrastructure would resolve any congestion issues) and giving that lane to cyclists in a segregated fashion.
Created by Shaun McDonald // 1 thread
Would it be possible to make the full length of Marchmont Street two way for cycling? The northern half doesn't seem to be now.
Created by Shaun McDonald // 0 threads
It's horrible to cycle along Old Street due to the number of cars/taxis/minicabs parked in the cycle lane. I usually find this a lot worse in the evening.
Created by Shaun McDonald // 0 threads
The toucan crossing for cyclists avoiding Old Street Junction are very slow to change for pedestrians and cyclists. Often people get fed up waiting and then dart across in a gap. Or once there is a gap, it takes until cars start appearing before they change.
If TfL is seriously interested in encouraging walking and cycling they need to change the timing of these lights so that they don't take forever to change.
Created by MikeF // 0 threads
When cycling along western park road towards mutley. On sections that have speed bumps without the traffic islands/bollards, car/taxi drivers dangerously position their cars (across both lanes) at speed to avoid the speed bumps. Friday & Saturday nights is the worst time with the taxi's.
Created by WilliamNB // 1 thread
On Royal Parade, when traveling in an easterly direction, shortly before the pedestrian lights by the Theatre Royal there is a poorly repaired trench across the road.
In lane 2, the surface is reasonable, but in lane 1 the tar has shifted to create a severe and unmarked speed hump. This is dangerous to cyclists.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Grahame Cooper // 1 thread
Irlams O'th Height roundabout has been the location of a number of collisions involving cyclists (including myself and my daughter last September).
There was a consultation last year over proposals produced by Sustrans for the improvement of this, and I showed my comments (annotations on proposed plans) at a previous GMCC meeting. You can find this annotated document here: https://copy.com/tAIjQdMSxfcsq4fz (large PDF - need to download to see all pages).
A leaflet on the intended imrovements can be found here: http://www.urbanvision.org.uk/wp-content/uploads/2014/08/Cycling-Leaflet.pdf
I am disappointed with this for the following reasons:
- Extensive use of shared footways in the scheme (Salford Council seems to be in love with these, but they are bad).
- Southbound approach on A666 looks impractical & dangerous: a sharp left turn onto the shared footway right at the busy entrance to the roundabout!
- Whilst carriageway widths have been reduced, kerb radii at the mouth of entrances and exits do not seem to have been reduced, so "drivers looking right whilst accelerating left" will still pose a danger for cyclists who do not want to use the shared footways.
- Limited improvements to the subways (tile removal, lighting and resurfacing) will probably not result in an attractive facility for cyclists. Access to this from Bolton Road (northbound) looks awkward.
- There is no undertaking mentioned to ensure that facilities will be maintained and swept.
- I'm still not confident regarding the social safety of the off-road parts, especially in the dark winter months.
Those are my immediate reactions. Could be more to add.
Hamish F // 0 threads
There are no contraflow signs when entering Devonshire Rd from Adermans Hill. Cyclists have reported hostility towards them as they ride "against the flow". The markings are correct as the cyclist enters Devonshire Rd from A105 but of course the drivers do not see that.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Fraser Stephens // 1 thread
RAISED AT PUBLIC MEETING 10-04-2014
If a foot/cycle bridge is not going to happen in the medium term, then how about some traffic calming measures to reduce driver's speed expectations over the bridge? Drivers who have just come of a dual carriage way at 70mph+ or have been zooming along the A40 at 60mph+ are suddenly sharing space with cyclists having had little warning that this is about to happen.
We suggest deploying traffic calming measures, such as marked cycle ways, belisha beacon crossings (much needed anyway!) and signage making it clear that care is required. If the speed limit was clearly lower, many drivers will not be so aggressively trying to overtake cyclists.
Created by Colin Bell // 1 thread
Has there been any improvement in the "new" NCN 11 route from Waterbeach to Lode since last summer? Last time I went that way I had to wheel the bike across fields and carry it over two or three stiles.
Any information, including a forecast date when a proper route is likely to be built, welcome. Thanks.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.
Created by Shaun McDonald // 1 thread
Dove Street is currently one way. It would be useful if it could be made 2 way for cycling for peopl coming from St Helen's Primary School to NCN 1.
The left turn from St Helens Street into Dove Street is much easier than a right turn from St Helens Street into Regent Street, as you don't have to block a lane of traffic and hope for a gap in the traffic in the opposite direction, especially with kids. It's also a shorter route when heading towards the town centre.
Sam // 1 thread
The bollards at the bottom of Herbert St haven't been replaced after the electricity cable was laid last week.
Rather than directly replacing the bollard slalom that existed beforehand, the bollard specialists might have suggestions on what the layout should be here which camcycle can suggest as for the replacement...
Created by Andrew Woodward // 1 thread
Providing a cycle-friendly surface on the path from Meadlands Drive to the road serving the German School and the Polo Club would improve cycling access to Strathmore and Russell Schools and help provide a better quiet route from Meadlands Drive area towards Richmond - providing more/better options for avoiding the busy Petersham Road.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Cycling Dumfries // 1 thread
No safe route from Collin to Dumfries town centre - the A75 is a dual carriageway along this stretch of road with no direct alternative route
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Created by Andrew Woodward // 0 threads
The route from Kingston Bridge into Church Road and up to Bushy Park traverses busy traffic routes with little protection for people cycling. Making this short section easier and safer for cycling would provide an important link to join up the quiet routes from Hampton through Bushy Park to Kingston town centre.
Created by Andrew Woodward // 2 threads
Ham Gate Avenue: As you cycle past parked vehicles which narrow the road by almost half you are trapped in a long tunnel. Impatient motorists who want to enter from the other end do so and simply drive at you forcing you practically into the gutter or off the road completely. Would it be ever possible to ban parking on this avenue and limit the speed to 20mph as it is in the park?
Note - there is a shared use segregated track alongside the road here (part of NCN 4) but it is frequently too narrow to cope with the volumes of cyclists and pedestrians; it is overhung with low tree branches and the surface is poor.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by David Earl // 4 threads
There are some evil short grey posts on the busway cycleway that are really hard to see in the dark. I have heard of a number of people hitting them with disastrous consequences
Created by Sam Saunders // 2 threads
On the eastern approach to Clifton Suspension Bridge the narrow road curves past a pedestrian refuge next to a toilet block. The short cycle lane that had started as approximately 1.2 metres wide narrows to approximately 0.9 metres at the refuge. More than half of the cycle lane at that point is paved with uneven cobbles unsuitable for cycling, especially on a bend. The traffic lane (approx 3.2 metres) is too narrow for a car and a bicycle to pass together. The cycle lane, in effect, is encouraging inexperienced cyclists to adopt a vulnerable road position and to cycle on an unsuitable surface.
Created by Shaun McDonald // 1 thread
St Peter's Dock on the National Cycle Route 51 just north of Stoke Bridge has a really poor surface which collects water, also the old rails that are no longer used and no longer connect to the rest of the rail network are a hazard for cyclists and ideally should be removed.
Created by Andrew Woodward // 0 threads
Westbound cycle lane is painted about 2m out from the kerb for no reason; child cyclists tend to follow paint rather than the common sense option which is to cycle next to the kerb.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by Simon Nuttall // 3 threads
The railway line from Cambridge to Newmarket turns out across Coldham's Common and right through the middle of Cherry Hinton, and then carries on passing to the north of Fulbourn.
There are currently (2013) two main routes from the east of Cambridge to Cherry Hinton - the Tins and Snakey Path. However both have long very narrow sections involving pedestrian conflict.
The railway line is single track - but satellite images show the bridges crossing Barnwell Road and Coldham's Lane were both built for dual track. So this means there should easily be enough room to accommodate a cycleway alongside the railway.
This route could then connect up with the Chisholm Trail and provide a direct fast cycle route to and from the city and the Science Park area.
A community consultation 'The Barnes Ponder' in October 2013 has show strong support for making Barnes a 20 mph neighbourhood .
“20mph is plenty enough speed on the roads!”