Martin Lucas-Smith // 1 thread
The City Council believes there are rat-running issues here.
Martin Lucas-Smith // 10 threads
Various issues relating to enforcement of taxis in Cambridge (the line shown on the map being the worst area)
Martin Lucas-Smith // 2 threads
Improvements and changes to Perne Road - making this as cycle-friendly as possible.
Created by t1mmyb // 0 threads
This shortcut is technically pedestrians-only, but forms a useful link from the environs of Bath Spa station (Widcombe) to Holloway, a dead-end for motor vehicles and therefore a quiet, if steep, climb to Bear Flat, Wellsway and beyond.
Dropped kerbs, barrier/chicane removal etc. would make this route usable by parents with cycle trailers, people on cargobikes and the like.
It was slated as a piece of work to be done by Bath & NE Somerset, but there's been no news lately.
Created by Richard Alderson // 0 threads
Near Cob Kiln Lane commuter route to Urmston Rail Station Cyclists and pedestrians are supposed to use this kissing gate. The dwell space is far too small and very muddy. There is a horse stile as well which is equally muddy - this is a major access route to the Trans-Pennine Trail
A section of the road now has a TRO restricting all motor vehicles without a VIP parking pass. Cycling is permitted on this section, but there are no signs to confirm this. The road still part of NCN55.
Created by David Earl // 5 threads
There is a great shortage of cycle parking in Cambridge City Centre. The cycle parks have been very successful, but the promised 500+ spaces at Grand Arcade actually only delivered around 250.
Created by David Earl // 2 threads
11 flats replacing existing building
Created by t1mmyb // 0 threads
There is a pair of traffic-calming chicanes/pinch points on The Hollow. The one lower down the hill (where drivers must give way to downhill traffic) has a cycle bypass; the one further up the hill (where ascending traffic has priority) does not.
When I cycle up The Hollow I am probably managing about 5mph; this pinch point brings me into conflict with much faster motorised traffic going up the hill, to the extent that I usually avoid the road completely and take a different route (Southdown Road) that has no traffic islands/pinchpoints.
Martin Lucas-Smith // 1 thread
Discussion of cycle training issues in Cambridgeshire.
Created by David Earl // 1 thread
Dear CCC,
In light of the recent news of a cyclist being injured by a motorist whilst on the off road cycle path on Barton Road (http://www.cambridge-news.co.uk/Cambridge/Driver-who-knocked-over-cyclist-keeps-his-licence-16012012.htm) I was wondering if the CCC is campaigning for a reduction in the speed limit along Barton Road? I think (but am not categorically sure) that Barton Road remains the last main road into Cambridge with a 60mph limit.
Barton Road suffers from two problems with speed: heading out of town motorists accelerate from 30 to 60 after the speed camera; and heading into town motorists are coming off the motorway and are used to such speeds and continue to drive way over the 60 limit.
According to the http://www.crashmap.co.uk/ Barton Road has seen several fatalities and many accidents recently.
Sincerely
Barnabas Baggs
Starting a thread about this application here so we can continue on from the previous planning list discussion.
Created by Richard Moss // 3 threads
Planning application submitted for housing near the primary school and a mixed use housing plus retail development at Unwin Square, east of the Permier Inn. Concerns about provision for cycle parking contained in the plans submitted.
Created by Robin Heydon // 1 thread
Proposed package: Streamlining bus services through Cambridge city centre
A package of measures including some of the following is proposed:
• Cambridge Core Scheme extension – potential remove all traffic but buses and cycles from St Andrews Street north of Emmanuel Street through the day.
• Address taxi overcrowding in St Andrews Street.
• Remove / relocate some on-street parking in Jesus Lane.
• Bus priority measures along Chesterton Road
• Improved bus stop infrastructure in Hobson Street and Jesus Lane.
• Removal of some parking on Histon Road and Station Road.
• On Street ticketing at busy or constrained boarding points to reduce bus standing time and pedestrian congestion.
• Enhanced enforcement of infringements on key bus routes and stops.
• Rerouting of some buses away from Bridge Street / Magdalene Street.
• Park and ride capacity enhancements
• Rural interchange enhancements on longer routes benefiting from the city centre improvements.
ATM proposed next to Hills Road cycle lane
Martin Lucas-Smith // 3 threads
The LSTF is the funding from government for sustainable transport for the region. This issue covers discussion of the bid.
Martin Lucas-Smith // 2 threads
Planning application by Sainsbury's on Mill Road - various issues.
Created by Simon Nuttall // 1 thread
I'll hang a thread off this general issue where we can share news - at least while we transition to using this new system.
Created by Heather Coleman // 1 thread
The planning application has the promise of new, extra cycle parking, which should be good news. However, details are scant to say the least and as new jobs will presumably be created, I fear it will do nothing to alleviate the chronic shortage of cycle parking on site, especially at this location at the rear of the Concourse, and a place of choice to park if you have cycled from Trumpington.
Warrington Cycle Campaign have produced a leaflet aimed at improving the mutaul understanding of cyclists and bus drivers points of view.
It is called "Bus Drivers & Cyclists in Harmony"
We hope to promote better relations between the two groups via a similar leaflet. The key goal is safety but enhanced respect by both parties would be of benefit.
We have serious concerns over the standards of driving of certain classes of vehicles in Cambridge.
We have an opportunity to push for both bus companies and and local authorities to train their drivers to a higher standard
Under the 'Certificate of Profession Competence' drivers of certain classes of vehicle are required to undertake 'continuing training'
There has been an article in Local Transport Today about training in London. see:
http://www.transportxtra.com/magazines/local_transport_today/news/?id=29476&StartRow=1
"A COURSE designed to cut the number of lorry accidents in urban areas, particularly those involving cyclists and pedestrians, has gained industry accreditation.
The ‘safe urban driving’ (SUD) course developed by Transport for London and London boroughs has been accredited by the Joint Approvals Unit for Periodic Training, the body set up by the sector skills councils for freight and passenger transport to manage the driver Certificate of Professional Competence (CPC). "
"EU directive 2003/59 requires lorry and van (over 3.5 tonne) drivers to obtain a CPC by completing 35 hours of training every five years. The requirement came into force in 2009, so the first deadline is September 2014. "
"The second half of the course sees the lorry drivers get on bicycles and go on-road to understand how cyclists position themselves on the road, and how to drive in the presence of cyclists. This module was developed by Cycle Training UK for the London Borough of Lambeth. "
I've already pointed out this scheme to the cycling officers
It may be that we can get the LA's to approach Stagecoach on this issue and it could form part of any 'Quality Contract'
Created by Jim Chisholm // 1 thread
The County is proposing a 'controlled parking zone' to cover a wide area around Addenbrooke's. The exact limits are to be discussed, and issues will arise in area of new housing where the roads are yet to be adopted.
An initial meetimg for stakeholders is to be held at Hills Road VI form college on Thursday February 2nd from 18:30 to 20:30
The map shows the area being studied
Created by Jim Chisholm // 2 threads
Currently there are 'No cycling' notices despite this being a major cycle route.
Although it is unlikely that major works can be done to the bridge, changes on the approaches could reduce the conflicts, by improving 'intervisibility' between the different users.
A meeting between various parties (Councillors, County bridge engineer, cycling officers, and cycling campaign is proposed.
Created by Simon Nuttall // 3 threads
Talk by local historian about cycling in Cambridge
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Kevin Ablitt // 1 thread
During the refurbishment of St Mary at the Quay this section of road has been closed. The sky has not fallen on us and neither has traffic ground to ( any more ) of a standstill. In my opinion it should stay closed to MVs and just be segregated for bikes and peds.
Created by Rob Earl // 0 threads
Gravel/muddy slope section of QR20, the rest of which is tarmac path/roads.
Created by Fraser Stephens // 0 threads
RAISED AT PUBLIC MEETING 10-04-2014
There are relatively shallow paths that run from both ends of the bridge down to the A4143, but both have shallow steps that stop them being useful to cyclists. This means that people heading out of the hospital wanting to cycle down the A4143 towards Llanfoist have to cross the road with the traffic, rather than the safer alternative of crossing the bridge and coming down the ramp.
Note that openstreetmap's map of this is incorrect. I'll submit a correction (11-04-2014)
Created by Rob Earl // 1 thread
Opening a gap in the wall would give access through towards Portobello and Figgate Park
Created by T Harris // 1 thread
You may remember that Hounslow Council issued plans for a cycleway between Boston Manor Underground Station and the GSK complex back in 2014. The recent revised plan is for a bidirectional protected cycleway on the western side of Boston Manor Road. It includes plans for separation between the cycleway and bus stops. There are still places where cars can be driven over the cycleway at entrances to Boston Manor Park and car parking bays planned to be located between the cycleway and the properties opposite Manor Vale. We broadly support the plans, but please send in your concerns too. The consultation ends on 3rd June.
Created by Debra Storr // 1 thread
The pavement around the Blackdog roundabout is the logical route for cyclist to transit from Blackdog towards Potterton and until the Blackdog-Murcar cycleway is built, those brave enough to venture onto the dual carriageway will use the pavements to get onto and off more suitable roads
It would be helpful if the designation would change and the surface revisited. Pity is wasn't built wider to shared path standards.
Created by Simon Still // 1 thread
In response to resident requests to reduce vehicle speeds and to provide a continuous low-traffic cycling “Quietway” route between Shepherd’s Bush and Kensington High Street, the Council is proposing some changes on Russell Road and other local streets.
Possible changes and implications
On Russell Road, where our surveys confirm that traffic speeds are high, we propose removing the existing chicanes, as these do not work well. This will mean we can create a small amount of additional resident parking. Instead, to reduce traffic speeds, we propose seven sinusoidal humps along the length of Russell Road. They would be spaced in line with national guidance on the optimum spacing to encourage drivers to keep to a consistent speed, thereby minimising accelerating, braking and associated noise and emissions. Sinusoidal humps are designed so that, when driven over at lower speeds, they are noticeably more comfortable to drive over than traditional humps. We have recently introduced sinusoidal humps in St James’s Gardens and we also use them when we resurface roads that have traditional humps - for example, in Abbotsbury Road near Holland Park.
We also propose to remove the centre line to encourage drivers to slow down and take more care whilst driving. In addition, in response to reports of vehicles cutting the corner at the sharp turn onto Russell Gardens, we propose hatching markings, to encourage drivers to position themselves correctly when making the turn.
Other proposed measures
At Russell Road’s junction with Kensington High Street, a new pavement build-out on the west side and introduction of a raised table across Russell Road to slow turning traffic and provide a shorter crossing distance for pedestrians.
Removal of the island at the north end of Elsham Road to provide more space to exit from the cycling contra-flow lane.
Removal of the cycling feeder lane and introduction of an advanced stop line at the junction of Lower Addison Gardens with Holland Road to improve cycle safety.
Removal of approximately three metres of parking to improve entry into the existing segregated cycling facility on Addison Gardens bridge and to provide a safe waiting space for cyclists wishing to turn into Hansard Mews.
Permit contra-flow cycling through Hansard Mews, providing access to Shepherd’s Bush and Holland Park Avenue.
Alterations to the surface of the inclined section of Hansard Mews (approximately 30 metres) to reduce the slip hazard, especially in wet conditions, while minimising the change in appearance.
Introduction of wayfinding signs and road markings along Russell Road, Russell Gardens, Elsham Road, Lower Addison Gardens and Hansard Mews at points where a change of direction is required. We estimate there would need to be around 15-20 signs and symbols across the area.
Created by Roxanne (CEO) // 3 threads
The government has announced it will hold a consultation on the introduction of the battery-powered scooters to British roads.
What are the implications for people cycling, walking and scooting?
What is Camcycle's position/policy about e-scooters?
Created by Shaun McDonald // 1 thread
Comment from October 2014 Cycle Ipswich meeting:
"Belle Vue Road is very steep for a recommended cycle route."
It's marked on the Ipswich Cycle Route Map.
Created by Paul James // 0 threads
The tucan crossing is out of phase with the lights at Church Road meaning that traffic coming along the A316 into Kew Rd is not held at the tucan but is then stopped at Church Rd so that cyclists and pedestrians have to wait for traffic to enter Kew Rd.
Re-phase the lights so that the tucan crossing is red for the roadway at the same time that it is red for the lights at Church Rd, so that there is a single green phase along the cycleway across the end of Kew Rd.
Created by Dawes Jaguar // 1 thread
This path is supposed to be a shared use path, part of the Merritts Brook Greenway. Unfortunately it is the same width as a bicycle and completely unlit. It emerges at an informal crossing upon which cyclists are instructed to dismount. Cyclists are then expected to pedal along the pavement. It's completely useless and unnecessary, as there is a better route via Charfield Close.
Martin Lucas-Smith // 1 thread
"Daily parking wars make Red Cross Lane dangerous"
See: https://www.camcycle.org.uk/newsletters/146/nl146.pdf
Need to improve this area for cycling and walking.
Red Cross Lane and Greenlands are marked for 20mph and they're very narrow streets barely two cars wide.
Created by Lewisham Cyclists // 1 thread
Royal Borough of Greenwich consultation on improvements to road junction at Blackheath Gate of Greenwich Park for Quietway 1 extension.
Consultation closes 19th April 2019.
Created by aSemy // 0 threads
A tree on the side of East side of Whiteladies road (next to HSBC) has a notice stating that the tree will be removed and replanted. The tree is on the very wide pavement right next to the road, and the road is not wide enough for vehicles and cyclists: a pinch point.
There is clearly enough space on Whiteladies road for a segregated cycle lane. It is a popular route used often by heavy traffic. With enough shifting of road lanes there's even enough room for an uphill cycle lane.
Replanting the tree away from the road would remove one small obstacle and show evidence that BCC is looking towards improving cycling in the long run.
Created by Shaun McDonald // 1 thread
The roundabout at the south end of Claydon under the A14 is pretty horrible for pedestrians and cyclists. It would be extremely useful if this could be upgraded to a Dutch style roundabout with:
* tighter entrances and exits will slow down vehicles to a safer speed while cyclists and pedestrians are around. The current dimensions are only ok when there are no cyclists or pedestrians around and it's safe for motors to go fast.
* single lane entrances and exit will make is easier to cross each arm. There would be no zig zag in the island.
* cycle track with separate pavement for pedestrians outside the roundabout, thus preventing conflict between the 3 modes of transport.
* cycle track crossing at 90 degrees to the road to aid visibility between different modes of transport.
Created by Al Storer // 1 thread
The A14 project is bringing a cycleway into the city as far as the University farm. Previous County projects have created a decent inbound cycleway from Laurence Weaver Road and an almost OK painted lane outbound to here. There's a section of cycleway from Girton Corner to Eddington Avenue, and at Girton Corner there's a connection to The Ridgeway along Bunker's Hill. There are Cycleways intercepting Huntingdon Road at Whitehouse Lane, both into Eddington and into Darwin Green.
But oh dear. Laurence Weaver Road junction is awful. Eddington Avenue junction is awful, and there's a very narrow and much over-run cycle lane to the north of it. Girton Corner junction is poor and serves poorly those who want to go from Girton village and College to the Ridgeway.
The section of road needs a holistic approach that incorporates the route along and the routes crossing in a coherent manner.
Created by North Devon Cycling Forum // 0 threads
To provide a safe route between Barnstaple Town Centre and the Pilton area, this footpath should be upgraded to a shared path, initially just by change of status, at a later stage, widening of the path should also be considered.
Created by Rogerdodge // 1 thread
Kingston Council have opened the Consultation on this route, it also includes Ewell Rd - see separate Map. Open until 17th November
Created by Dawes Jaguar // 1 thread
A cycle path built here would complete this proposed route segment: http://www.pushbikes.org.uk/location/bournville-3
Created by Charles Martin // 1 thread
Created by David Earl // 5 threads
Greater Anglia has just issued a consultation on cycles at stations and on trains
Created by Mike Comerford // 1 thread
Those of us living in the area marked have no safe access to the cycle network in order to cycle in and out of Dumfries. There are many keen cyclists in this area (as evidenced by the Toirthorwald Cycle Sportive for example).
I live with my family in a cluster of houses close to the A75 (Mouswald Banks) end of Linns Road. There are a number of cyclists at this location and we wish to cycle to Dumfries for work and for social / leisure reasons.
Our Options are:
- the A75 - definitely not safe
- to Torthorwald then along the A709 - narrow, full of heavy trucks, no pavement and very unsafe
- through Torthorwald, across the A709, onwards to Tinwald and then onto the A701 towards Dumfries until able to join the Caledonian Cycleway at Locharbriiggs. This stretch of the A701 is narrow and full of heavy trucks. Where there is a pavement it is too narrow to cycle along it. This is also a long way round to get to Dumfries.
The best solution would be to create a cycle path from Torthorwald along the A709 and through Heathhall woods to connect with the cycle network. This would serve Torthowald, Collin and surrounding hamlets. There is land along the side of the A709 to allow space to make a cycle path.
The shortest in terms of building new infrastructure, would be to make a cycle path along the A701 from the Tinwald road end to Locharbriggs. However space at the roadside along the A701 is very limited, and the route is a long way round for the communities from Torthorwald and Collin.
Building a cycle path along the A75 is an unlikely and unattractive proposition and would cause disruption along a major Trunk road.
Active travel is a priority for the Scottish Government to increase physical activity and reduce traffic emissions. Funding is available through Sustrans.
'Sustrans Scotland's Community Links programme provides funding for the creation of infrastructure that makes it easier for people to walk and cycle for everyday journeys. The programme is funded by Transport Scotland and has funded hundreds of projects across Scotland since 2010.
Through the Scottish Government's Programme for Government 2017-18, the active travel budget has been doubled to £80 million per year, from 2018-19. Community Links will help deliver a key action from this by supporting projects that make our towns and cities friendlier and safer places for people to walk and cycle.'
Created by velocipedus@gmail.com // 3 threads
Travis Perkins Development has major impact on Chisholm Trail.
We have a letter from the developer outlining their position - let's see if I can attach this...
There is a lengthy discussion of the Chisholm Trail, the gist of which is that they don't see why they should make any further accommodation for it when it is mainly Network Rail's land that is earmarked for the route. They dangle a small carrot in that they might release the corner piece of land to mitigate the pinch point you identified - but only if this application is given the go-ahead.
Created by David Earl // 1 thread
"14/0447/FUL | Change of use from motor bike show room to supermarket with cafe [without cooking facilities] and installation of air compressor unit. | 192 Green End Road Cambridge Cambridgeshire CB4 1RN"
The Dalmeny Park house builders have installed new chicanes on NCN route 1. Unfortunately none of these meet the guidlines for chicanes on cycling facilities.