CS2/Cycle SuperHighway 2
Cycle SuperHighway 2 / CS2 upgrade
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Simon Munk // 1 thread
Overview
We are seeking your views on proposed changes to the junction of Borough High Street with Union Street and Newcomen Street. The proposals are part of the Central London Cycling Grid - a network of cycle routes in Zone 1.
This junction forms part of the Blackfriars to Tower Bridge Road route. The London Borough of Southwark consulted on other parts of this route in October 2015 – further details can be found here:
What are we proposing?
Our proposals aim to improve safety for cyclists and accommodate the predicted increase in cyclists along this route. The design would provide a more direct route for eastbound cyclists by removing a long detour and allowing them to proceed along Newcomen Street. By altering the signal phasing of the junction, we would also enable cyclists on Borough High Street to turn onto the new route.
Why are we proposing this?
The Blackfriars to Tower Bridge Road Route will provide a safer and more pleasant journey through a section of the city that is already popular among commuters as well as recreational cyclists. Transport for London and Southwark Council have identified certain junctions and sections of the proposed route that could be modified to improve cycle accessibility as well as safety for all users of the road, including pedestrians.
By closing a short section of Newcomen Street to motor vehicles and creating two-way access to the junction, we will remove a long detour from the cycle route. Changes to signal phasing at the junction, and modifications to existing street furniture, will create safer routes for cyclists without affecting pedestrian accessibility.
At construction stage the junction would also be resurfaced. Proposals for this junction are:
Union Street
Existing contra-flow cycle lane retained for cyclists travelling westbound on Union Street. This would connect to Southwark Council’s proposals for Union Street.
Existing advanced stop line extended to 5m with a cycle feeder lane. These extended facilities would provide cyclists with a larger waiting area in front of motor traffic, improving their visibility, and allowing them to safely move away at the traffic lights.
Borough High Street
Dedicated low-level cycle signals to inform cyclists of when to safely proceed across Borough High Street from Union Street and Newcomen Street.
Pedestrian islands widened to improve pedestrian accessibility across Borough High Street.
Cyclists permitted to turn left onto Union Street and Newcomen Street. This movement is currently banned and would remain banned for other vehicles. This allows cyclists on Borough High Street to join the route. The signal phasing would be altered to permit this movement. NOTE: All vehicles (including cyclists) would continue to be banned from turning right into Union Street or Newcomen Street.
All-round pedestrian signal phase retained so that pedestrians can safely make all movements across the junction at the same time.
Newcomen Street
Section of Newcomen Street closed to motorised traffic. Bollards would be installed approximately 30m west of the junction to enforce road closure to motorised traffic except for emergency access. NOTE: Newcomen Street is a borough-owned road and this aspect of the scheme would be progressed by the London Borough of Southwark.
Two-way cycling permitted on Newcomen Street allowing cyclists travelling eastbound to proceed directly from Union Street, and turn left from Borough High Street.
Existing footways widened to improve pedestrian accessibility.
We have carried out traffic modelling for this proposal. The results indicate that the proposed changes can be accommodated without undue delay to any road user.
Created by Stephan Matthiesen // 1 thread
The underpass under Milton Road has a very bad surface and is very dark, this is particularly bad as there is sometimes rubbish and jokers have left stone slabs or other items in the middle of the path.
Created by Anne Clarke // 1 thread
The current Barton to Cambridge off road cycle path starts at the White Horse in Barton. During term time Cambridge bound traffic is now backed up and slow moving throughout Barton along the A603. This leaves no clear safe route for cyclists. The road has white hatchings down the middle and would be wide enough for a proper on-road cycle lane to leave a safe passage past the queuing vehicles.
Created by Roxanne (Cycling Campaign Officer) // 1 thread
The demolition of Jupiter House and the construction of a new office building comprising 5,654 sqm (GIA) of Class B1(a) floorspace including ancillary accommodation/facilities with a single basement of 1,715 sqm (GIA) providing 37 car parking spaces, with associated plant and new sub-station, 193 cycle parking spaces at street level and two options for provision of access to the development and for hard and soft landscaping.
Created by Roxanne (Cycling Campaign Officer) // 3 threads
Erection of 50 new affordable houses, following demolition of 26 existing dwellings (Nos 46-60 and 66-75 Eastfield), and associated highway works, landscaping and public open space provision.
See pages 20 and 21 of D&A statement for car parking and cycle storage. (No specifics provided)
Created by jpennycook // 1 thread
15/04503/OUT | Outline application to include access to be considered, for up to 750 residential units with a mix of units, and a neighbourhood centre including principal community centre, private children's nursery, local retail facilities, indoor sports hall and three form entry primary school and ancillary development | Hounsome Fields Trenchard Lane Dummer Hampshire
Created by Simon Munk // 1 thread
Huge residential redevelopment next to Staples Corner. Latest transport update
Created by Jean Dollimore // 1 thread
This issue so is for collecting ideas on the area bounded by Mansfield Road, Grafton Road, Queens Crescent and Malden Road.
Camden says: we are interested to know what residents, businesses, community groups, service users and all other stakeholders in the Gospel Oak area think about the ideas and what ideas you might have.
Some of Camden's priorities:
- Improve public spaces
- Getting about
- Queen’s Crescent
Dates: consultation 19th November 2015
Officer: George McKenzie (Community Liaison Officer)
. CC member dealing with it Angela Hobsbaum.
Created by Simon Munk // 2 threads
TfL say:
We are proposing a number of transformational changes to Vauxhall Cross as part of our Road Modernisation Plan.
The Road Modernisation Plan is the biggest investment in London’s roads for a generation, consisting of hundreds of projects to transform junctions, bridges, tunnels and pedestrian areas, making our roads safer and more reliable.
Working closely with the Lambeth Council, we are aiming to return the one-way road system at Vauxhall to two-way roads and significantly improve pedestrian and cyclist provision to help create a safer and less intimidating environment for vulnerable road users. The proposed changes would also help to improve connectivity throughout the area, and create a better environment for people living, working, and travelling through Vauxhall.
Following our initial consultation in 2014 on our high level proposals, we are now inviting your views on our detailed design proposals.
What are we proposing?
The changes we are proposing include:
Removing the existing one way road system around the transport interchange (Parry Street, Wandsworth Road, Kennington Lane, South Lambeth Road) by converting these roads around Vauxhall to two way
Providing more cycle and pedestrian crossings as well as segregated lanes and parking for cyclists
Improving existing and providing new public spaces
Redesigning the transport interchange, including a new central bus station
Why are we proposing this?
Reducing traffic dominance
The current gyratory creates an environment heavily dominated by motor vehicles. The wide carriageway encourages high speeds, especially outside peak periods
The gyratory can be difficult to navigate, and the one-way arrangement means that vehicles often follow indirect routes
Lack of facilities for pedestrians and cyclists
Large numbers of pedestrians pass through Vauxhall each day but the existing crossings do not always follow the most direct or popular routes, which can lead to pedestrians crossing roads away from the crossings
The Vauxhall gyratory has some of the highest numbers of collisions involving injury to pedestrians and cyclists in London
Cycle Superhighway 5 will improve conditions for cycling along Harleyford Road and Kennington Lane. However, there is limited cycle provision on the other roads surrounding Vauxhall Cross and a lack of connectivity between facilities
Supporting the transformation of Vauxhall
Vauxhall is the gateway to one of Europe’s largest regeneration zones, with 25,000 new jobs and 20,000 new homes coming to the Vauxhall, Nine Elms and Battersea area
Supporting Vauxhall’s distinct local character, the proposals look to the future – preparing for the increase in the numbers of people living, working, and visiting Vauxhall and its existing and new shops, businesses and attractions
Created by Roxanne (Cycling Campaign Officer) // 5 threads
The Mill Road traders are planning a meeting (2016) to discuss congestion on Mill Road and have asked us to send a representative. What ideas do we have to for Mill Road?
Created by Jean Dollimore // 1 thread
The preamble describes a "Vision" for Grays Inn Road as part of a larger scheme for the Farringdon Area:
- improved streets for walking & cycling
- clearer and easier access to move through the area on foot, cycle or public transport
- safe, attractive and less cluttered streets
- a better place to live, work and do business.
The current set of proposals are related to bus reliability and pedestrian safety. They include the following:
==============================
- Raised zebra crossings at five sites with a standard layout that involves build outs to leave a 9m wide crossing. (some of these replace informal crossings with islands, some are new).
- Long stretches of double yellow lines with loading restrictions (see Appendix 1 of the consultation).
- footway widening on the east side between Ampton Street and Calthorpe Street
- Carriageway cycle parking in Wren Street and several other side streets
Martin Lucas-Smith // 1 thread
Fulbourn/Cherry Hinton Eastern Access is one of the five City Deal 'cross-city improvements' schemes.
"The growth of housing and employment sites in the Cherry Hinton and Fulbourn Road area, such as the expansion of the ARM headquarters will put further pressure on local roads. Improving the cycleways on Fulbourn Road would enhance cycle access to the city centre and contribute to the completion of the cycleway network in this part of south-east Cambridge."
Martin Lucas-Smith // 1 thread
Hills Road and Addenbrooke's Route is one of the five City Deal 'cross-city improvements' schemes.
"This is a key route for people accessing local schools and sixth form colleges as well as the Biomedical Campus. The cycle facilities at the junction of Hills Road/Long Road/Queen Edith's Way are limited. The two proposed options aim to provide safer crossing for pedestrians and cyclists accessing the Biomedical Campus and local area."
Martin Lucas-Smith // 1 thread
One of the five City Deal 'cross-city improvements' schemes is Ditton Lane.
"National Cycle Network 11 and 52 (NCN 11 & NCN 51) crosses Ditton Lane near Fison Road and then runs parallel to the river Cam and connects the City Centre with East Cambridge. This route is extensively used by cyclists heading to Newmarket Park & Ride and Marshalls. In the future the route is also likely to be used by those travelling to the Wing housing development. This scheme will ensure imrpovements to the busy NCN 11 & NCN 51 and improve the links to the local area, Fen Ditton Primary School and Horningsea."
See also issue 418.
Martin Lucas-Smith // 2 threads
A third railway station for Cambridge, at Addenbrooke's has long been proposed, and there are signs of increasing interest in this proposal.
Obviously we will want to ensure that any such development is as cycle-friendly as possible.
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by Dawes Jaguar // 0 threads
This junction is appalling badly designed. The only thought behind it appears to be how to maximise traffic flows on the A4040. The weird junction with the high street proper just causes confusion and near-misses. The roundabout is notorious for collisions, and facilities for pedestrians are poor. Facilities for cyclists are non-existent. It is a major barrier to cycling.
The junction should be redesigned, taking into consideration all road users and traffic flows over a wide area with a view to reducing conflicts. For example, consider closing roads to motor traffic so as to simplify the situation and improve permeability for walking and cycling. Motor traffic on the high street (which is looking run down) is bad for trade.
Created by Dawes Jaguar // 0 threads
Old Church Road is narrow and twisty, yet some motorists see it as a good place to travel at speed and overtake. It would be nice if the Bishop of Birmingham could be persuaded to encourage people to walk and cycle along here. There is a gate at one end, but it is rotten and could be replaced with a half barrier gate, to create the required filtered permeability.
Alternatively a small corner of land at the gated end could be used to create a direct connection with Old Church Avenue.
Note that there is a school at the gated end, which of course encourages motor traffic. Improving the walking and cycling routes here would reduce the motor traffic.
Created by Dawes Jaguar // 0 threads
* Remove the cycling prohibition order on Old Church Road and make it shared use.
* Make the crossing on Harborne Park Road a toucan crossing.
* Paint a line along the join in the path on Harborne Park Road, to make it split use.
* Make arrangements to allow cyclists to connect between this cycle path and Vivian Road safely.
Note that there is a school at the end near the church, which of course encourages motor traffic. Improving the walking and cycling routes here would reduce the motor traffic.
German towns have made paths such as Old Church Avenue shared use to encourage cycling. They don't become impossibly busy with cyclists, but such moves do result in a much higher cycling modal share, which in turn reduces congestion. Old Church Avenue would make a useful link to encourage cyclists into Harborne. Harborne currently has a difficult-to-use road system and is congested with cars. This is really bad for trade. Removing the cars from Harborne high street would boost trade and revive the high street, but people still need to get there somehow. That's where bikes come in.
Martin Lucas-Smith // 2 threads
I am writing to point your attention to a "danger spot" on the Barton Road cycle route.
I and many others cycle this route every day and really appreciate how safe it is. However, there have been a number of near accidents at the sliproad from the M11 southbound onto the Barton roundabout. The problem is that the cycle path means that all cyclists must cross the road leading onto the roundabout. This is fine when the traffic is not busy. However, during rush hour the left lane going onto the roundabout is always queued up. This means that, to cross the the road, a cyclist needs to wait for a car to let them out. However, the problem lies with the right lane going onto the roundabout. If there is a queue in the left lane, you are unable to see into the right lane and so quite a few cyclists are nearly knocked off at this point
The problem is that:
a. The right lane is too short and so cyclists are unable to get out of the way in time if a car does not does turn onto it. It seems to me that there shouldn't be a right lane as it's too short to be of any use and poses more of a danger to cyclists.
b. Cars tends to (understandably) be going quite fast as they've just come off the M11 and also are usually looking onto the roundabout rather than the road in front of them. This has meant that I've seen lots of cars having to break very heavily having only seen a bike crossing in front of them at the very last minute.
I, and the other cyclists that routinely use this otherwise very safe route, would hugely appreciate it if this problem could be looked at.
[RL; sent by post, 27th June 2015]
Created by Dawes Jaguar // 0 threads
If cycling up the hill to Raddlebarn Road, the right turn into Laburnum Road is tricky on a slow-moving bike. This is because Sycamore Road is used as a through-route, which means it is far busier than it should be. The 20mph limit is often ignored (because it's being used by through-traffic). Really it should be closed to make it useless as a through-route for motor traffic, but a simple first step would be to make the section shown inaccessible to north-bound traffic using the simple expedient of bollards across the north-bound lane and a "no entry except cycles" sign. This would mean cyclists using the naturally quieter Laburnum Road would be spared the uphill right turn, whilst simultaneously making the entire road intrinsically slower for motor traffic. Priority would need to be changed at the junction in favour of the the Sycamore Road-Laburnum Road route. Cyclists heading north could of course pass through the bollards if they so wished.
Created by Dawes Jaguar // 1 thread
This section of of dual carriageway with an additional lane for parking is not only ludicrous, it results in serious problems for pedestrians on the zebra-crossing, because motorists simply don't notice them commencing their lengthy crossing from the opposite side of the carriageway. This isn't helped by some motorists using the central reservation as a car park, blocking sight-lines to the crossing. Reduce the road to a single carriageway and provide a segregated cycle path to make it possible for cyclists to get from the Cadbury recreation ground to Franklin Way without having to negotiate a dual-carriageway used by articulated trucks accessing the Cadbury factory.
Created by Dawes Jaguar // 2 threads
The tunnel under the railway is narrow, and the road is one-way for all traffic. This means that cyclists using NCN5 cannot get to Bunbury Road (and Bournville Estate) here without dismounting for a considerable distance. Two years ago BCC proposed that cyclists heading towards Bunbury Road (via the short section of cycle path that leads from Bunbury Gardens) hop on to the pavement, but the pavement is very narrow and will be blocked by a single pedestrian. The simple solution is to close the road to the few motorists that use it, and make it two-way for bikes and pedestrians. That's what the Dutch would do, because it encourages people to use a bike for short journeys rather than a car. However, BCC is once again in a state of paralysis and have done neither.
Created by Dawes Jaguar // 0 threads
Bunbury Road is busy, but road users emerging from Woodlands Park Road and Northfield Road have to play a game of chicken as they try to judge the best moment to make a rapid exit without crashing into each other. Adding to the processing overload, the following must also be taken into account by road users:
* A service road opposite Woodlands Park Road connects with Bunbury Road at this point.
* A cycle path runs from the junction down to Bunbury Gardens.
* A zebra crossing, one that many motorists (including police drivers) fail to stop for, presumably because of the processing overload.
Lacking acceleration, cyclists face a long wait either at the junction or the zebra crossing. Either way they risk being mown down by a motorist lacking the superhuman skills required to negotiate this junction safely. Since even police drivers make dangerous mistakes here, then it is clearly hopelessly wrong.
There is quite a bit of space here. I would suggest as a minimum a single lane roundabout be created, but since Bunbury Road is busy and there is already a cycle path here it should be made a proper Dutch-style roundabout. To ease the design, close Northfield Road at this point to motor traffic (Northfield Road runs parallel to Bunbury Road).
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by Rosalind Lund // 1 thread
further to the piece in newsletter 128, I wonder if any thought has been given to the difficulty of turning right into Emmanuel Street if you are coming towards the town centre from St Andrew's Street? We go fairly often to the Arts Cinema and this is the obvious way for us to go home, but it is impossible to turn right on the correct side of the bollard at present as it is designed only for left turning cycles coming out of town. There is, however, nothing to suggest that such a right turn is illegal.
Created by Shaun McDonald // 0 threads
The entrance to Dock Street should be turned into a continuous footway with pedestrian and cyclist priority over turning vehicles akin to this Danish junction: http://www.youtube.com/watch?v=QcnmLU1ClTo
This would improve sight lines for pedestrians too as the dropped kerbs are away from the junction, and it would also go with the pedestrian desire line as many tend to cross closer to the junction than the dropped kerbs. It would also slow down the vehicles entering the narrow street.
Martin Lucas-Smith // 1 thread
There's a very poor dogleg right-angle with barriers at the entrance/exit from the West Cambridge site to Clerk Maxwell Road.
This should be turned into a wide splay with good visibility.
Martin Lucas-Smith // 3 threads
Elizabeth Way is wide. Currently cycling is permitted on the pavements.
This should be changed to have dutch-style cycle tracks, achieved by narrowing the road slightly and narrowing the pavements (which are very wide and not heavily trafficked, so this would not disadvantage pedestrians).
This would give a safer cycling environment, and improve the pedestrian experience.
Martin Lucas-Smith // 10 threads
Milton Road, like other main roads in the city, is a mix of typically bad bits of cycle infrastructure. There is considerable scope, possibly within the City Deal funding, to rework the whole streetscape to Dutch standards.
Meeting with Leeds City Council to discuss possible remedial works due to high casualty rates.
Created by Katja Leyendecker // 1 thread
The (draft / emerging) 1Core Strategy seems to hint at a bus loop (Policy UC7) and a motor vehicle "ring road" (Policy UC9) too. It mentions pedestrian routes but there's no mention of cycle routes. See attached photo. (I didn't mark up the map, as it might become a tad too messy)
The "ring road" is just like Scott / esde84 described before http://newcycling.org/space4cycling/part2 (in comments)
The photo in the attachment is from "Newcastle Proposals Map" listed here http://onecorestrategyng-consult.limehouse.co.uk/portal/examination_library (not sure how long thi link will stay live, link rot may happen)
Created by Matthew // 2 threads
On 1 January 2026, historic routes in England that aren’t properly recorded will be lost to the public forever. We are looking for people to volunteer their time to help us identify and register these routes before it is too late.
Created by Shaun McDonald // 1 thread
It would be much safer to have cyclist priority on the slip roads here as is done in The Netherlands http://www.flickr.com/photos/smsm1/10046288016/ , or even the following example from Britain: http://www.cycling-embassy.org.uk/photos/good-cycling-facility-of-the-week/good-cycling-facility-of-the-week-14th-november-2013-0
The slip roads also need to be narrowed to slow motor vehicle speeds as does the turning radii of the roundabout.
Created by chdot // 1 thread
Longstanding issue about 'optimum' design, particularly to reduce conflict caused by vehicles turning from Teviot Pl due to signal phases.
Created by Mark A // 1 thread
A dropped kerb at this point would improve the route that people can take to cycle between Bear Flat and the city centre - making it easier to use Calton Gardens to avoid the section of footpath on the alternative via Holloway and St Marks Church.
Created by JonC // 0 threads
Our club (South Herts CTC) had to cross the A505 to get back into Hertfordshire on Sunday and we took a route between Litlington and Therfield which involved 500 m along the A505 and a right turn at the roundabout west of Royston.
I was quite surprised there was no cycle route to help cyclists here. It was a Sunday so at least there were fewer heavy vehicles than normal, but the speed of some cars coming up behind made it tricky to change lanes on a bike when turning right at the roundabout.
Since then I have studied other ways of crossing the A505 (using Google Streetview) and can't find any easy crossing points near Royston. I see it is the boundary between Hertfordshire and Cambridgeshire, which complicates matters (although it looks like the A505 road is in Herts).
To the east, I've used the B1368 crossing at Flint Cross, which is also a nightmare. To the west the crossing at Slip End does at least have a central refuge. It seems little or no thought was given to cyclists when the A505 was constructed.
Created by HankChief // 0 threads
There needs to be a ramped access to the school grounds at this point to replace or bypass the 6 steps currently there.
This would not only improve access to the school but also improve connection between the East Craigs Path Network and North Gyle and the only toucan crossing on the A8 in Edinburgh on Dechmont Road.
Created by Roy Russell // 0 threads
This is a good location for "No Entry except Cycles".
The existing Traffic Order allows cycling past the No Entry sign.
The existing "cycle bypass" over the footway, which was rarely used, has been obstructed and largely destroyed by the adjacent building site.
The simplest solution is to add a supplementary plate "Except Cycles" under the No Entry sign.
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by Paul James // 0 threads
All the sideroads between Richmond Circus and Manor Circus are a danger to cyclists on the cycleway.
There is no warning to motorists that there will be crossing cyclists and the building angles make it hard to see if anything is coming.
Turning traffic from the A316 can have an obscured view of the cycleway due to foliage.
Decrease corner radii.
Make road hump more pronounced.
Make cycle surface colour continuous across roadway.
Add markings across roadway.
Add warning signage.
Move give way lines back to before cycleway or add additional give way lines.
Created by Simon Redding // 2 threads
The railway path from Sheffield down through Staveley & Poolsbrook stops at Arkwright Town. Since an opencast / landfill was south of this point, there is no trace of the former railway line to join to the trails at Sutton Spring Wood. This is an important local link.
Created by Matthew Phillips // 1 thread
The route on the east side of the A167 past Crossgate Moor and Framwellgate Moor crosses a number of roundabouts. The cycle-path leads you across the roads very close to the roundabout, via the central refuge in the middle of the road. Some of these roads have two lane entry to the roundabout. Crossing both lanes at once is tricky as you have to have an eye on whether the traffic is about to move out onto the roundabout. If you have a longer vehicle, such as a bus, waiting, then the route to the refuge is blocked. There are no road markings to warn motorists that cyclists might be expected.
The route is probably going to be improved as part of the Great North Cycleway. If these roundabouts are to be made safe enough for children to use, major alterations will be required. (The route goes past Durham Johnston School so should be available to children.) The route should cross further from the mouth of the roundabout, preferably on a different-coloured surface, maybe raised.
Created by SamGW // 1 thread
The Road between Great Wilbraham and Fulbourn is very well used by Cyclists, runners and walkers throughout the year. It is a single track road with a 60 MPH speed limit. A bicycle path here would encourage more people to cycle to Fulbourn and Cambridge. The path would significantly improve safety for cars, pedestrians and cyclists.
Created by Steve Crapper // 1 thread
This planning application is a revised version of a previous application that would have infilled the disused railway beneath Buttermilk lane bridge, preventing the disused railway becoming a vital new greenway between Bolsover and Poolsbrook country Park (extending the existing Stockley Trail)
The revised application has changed from infill to ramps, but this forces an unnecessary road crossing, when an underpass is perfectly feasible
please object on this basis if you are able . our campaign has created a Facebook page called "build the Stockley Extension"
Bolsover
Application reference : 18/00178/FUL
Created by Robin Heydon // 2 threads
The Landbeach Parish Council would like the bridgeway from Landbeach to Cambridge to be upgraded to a cycleway.
Martin Lucas-Smith // 4 threads
London Cycling Campaign has reorientated its policy towards a 'Go Dutch' approach.
This aims to learn from best practice abroad rather than continuing with the 'hierarchy of provision' that, in 20 years in the UK, has arguably failed to deliver meaningful change.
This is an overarching issue for conceptual discussion of this issue.
Created by Andrew Woodward // 0 threads
Pinch point outside Courtlands on Sheen Road. Despite resurfacing, pinch point has not been addressed. Because of the poor road layout vehicles frequently encroach into the cycle lane. At off peak times the wide road encourages speeding - vehicles often approach this pinch point at 40mph.
Created by Stephan Matthiesen // 1 thread
The chicane at the west end of the Magdalene Glen path interrupts the flow when going uphills, particularly unpleasant for people with weak knees. It also forces cyclists uphills often to stop and start when there are other people going through, as it's not wide enough to pass.
It doesn't serve any useful purpose at it is on the top of the slope where cyclists are very slow anyway. As it's uphills, there is little danger that e.g. kids run out onto the wide pavement of Duddingston Pk South. Cyclists from the West are slow at this point anyway as they turn into the path.
Created by Shaun McDonald // 0 threads
The traffic lights at Eagle Street were timed such that travelling eastbound you would always get caught at the second set unless you were extremely fast setting off. After discussions with the council and it brought up at the Sustainability Forum by Cllr Smart, it was fixed to increase the length of time that those lights were green, and was great as you always knew you could get through the second set of lights without having to wait unless you just went through the earlier ones just before they went red.
However over the past few days the signal timing has changed back to the older timing where the probability of getting through the second set is virtually nil. In an ideal world they would be phased such that the first set would go green, then the second set would go green several seconds later at the point where you would be arriving at them, rather than having them change to green almost at the same time.