Quietway 7 QW7 Elephant & Castle to Crystal Palace
Full route of Quietway 7 Elephant & Castle to Crystal Palace
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by Simon Munk // 5 threads
Full route of Quietway 7 Elephant & Castle to Crystal Palace
Created by Simon Munk // 1 thread
TfL Overview
Why are we proposing this?
The A12 Eastern Avenue is a major strategic road on the Transport for London Road Network linking the A406 North Circular Road to the M25 and the east coast via Essex.
Barley Lane is a large junction on the A12 in the local area of Little Heath, close to Redbridge College and King George Hospital in the London Borough of Redbridge.
Currently, the only formal pedestrian crossing point at the junction is a footbridge over the A12 Eastern Avenue, to the west. This crossing is not step-free.
There is a long-standing issue with traffic congestion at the junction, frequently highlighted by local residents and also staff and visitors to the nearby King George Hospital.
We are proposing new signalised pedestrian and cyclist crossing facilities and road layout improvements at the A12 Eastern Avenue junction with B177 Barley Lane and Hainault Road.
Our proposals intend to help traffic flow more smoothly, reduce delays experienced by right turning traffic at the junction, and make it safer for pedestrians and cyclists to cross the road.
What we are proposing?
Key features
Improved traffic flow
We want to reduce congestion and delays to traffic using the junction, in particular on the A12 Eastern Avenue eastbound and B177 Barley Lane northbound. We propose:
- Changes to the road layout to lengthen the right-turn lane on the A12 eastbound approach. This would improve traffic flow, offering additional road space and increased capacity for vehicles. We would create space by cutting into the central reservation. This would require the removal of one tree, which would also improve the line of sight for traffic as it approaches the junction
- New traffic signals (see pedestrian crossing improvements below) with optimised signal timings so that the whole junction can operate more efficiently
- An additional green light stage in the traffic light sequence for vehicles turning right from Barley Lane, heading northbound
- New white line-markings to provide clearer direction to vehicles.
Pedestrian crossing improvements
We want to make it easier for pedestrians and cyclists to cross the road at the junction in a safer and more direct way. We propose:
- New signalised pedestrian crossings on each section of the junction, replacing all existing unsignalised crossing points. This would require the removal of pedestrian guardrail on the north western arm of the junction
- The introduction of new shared pedestrian/cycle ‘Toucan’ crossings on the southern arm of the junction. The new crossings would link with the existing shared-use path
- More pavement space on pedestrian islands
- Footway resurfacing to improve the current poor pavement. Tactile paving would be installed at all crossing points
Further information
If this proposal goes ahead we would reduce the speed limit on the A12 Eastern Avenue through the junction from 50mph to 40mph for safety reasons. The reduced 40mph speed limit would span approximately 200 metres east and west of the centre of the junction, creating a safer environment for pedestrians and traffic.
We also plan to have a general tidy up at the junction. This could include the replacement of some vehicle barriers and pedestrian guard-railing, relocation of street lighting and signage, and new planting on the central reserve.
The existing pedestrian footbridge to the west of the junction would remain unchanged under this proposal.
These proposals are part of our Road Modernisation Plan, which consists of hundreds of projects to make London's road network safer and more reliable.
Subject to the outcome of this consultation, we hope to start works during summer 2017.
Created by Simon Munk // 1 thread
TfL Overview
We are proposing to make improvements to pedestrian and cycling facilities around the junctions of Addison Road and Warwick Road with Kensington High Street.
The location has been the site of an above average number of collisions in recent years, many of which involved vulnerable road users. Both junctions are used by high volumes of commuter traffic in west London, as well as by pedestrian visitors to local amenities such as Kensington Olympia Conference Centre. In response to the high collision rate we have worked with the Royal Borough of Kensington and Chelsea to develop a set of proposals that would provide safer crossing facilities at both junctions as well as improvements for cyclists.
The proposals form part of our programme to enhance safety for vulnerable road users on the Transport for London Road Network.
What are we proposing?
We are proposing new features at both of these junctions, including new signal-controlled pedestrian crossings and new advanced stop lines (ASLs) for cyclists.
The following is a list of each of the proposed features. The order corresponds to the numbers shown on the map.
1 Controlled, staggered pedestrian crossing at the junction of Warwick Road with Kensington High Street, to provide pedestrians with a dedicated time to cross the road in two stages using the central island
2 Move bus stop on eastbound Kensington High Street away from the junction exit to allow cyclists better access across the junction
3 Changes to bay on eastbound Kensington High Street to accommodate the moved bus stop and improve traffic flow. The bay would be moved slightly east and reduced from 15.3 metres to 10 metres in length to accommodate the moved bus stop. Operating times would be restricted to 10am-4pm Monday to Sunday. Max loading time would remain at 20mins
4 New 5m cycle advanced stop lines (ASLs) on Kensington High Street eastbound and Addison Road southbound to provide cyclists with a waiting area ahead of the general traffic queue
5 New signal-controlled ‘staggered’ pedestrian crossing at the junction of Addison Road with Kensington High Street to provide pedestrians with a dedicated time to cross the road in two stages using the central island
6 Provide short section of bus lane and re-align road markings on westbound Kensington High Street to provide two full lanes past the bus stop. Hours of operation for bus lane would be Monday-Sunday 7am-7pm
7 Resurface a section of carriageway on Kensington High Street to prevent water from collecting on the footway and carriageway
8 New 5m ASL on the westbound approach to the junction to provide cyclists with a waiting area ahead of the general traffic queue
9 New 5m ASL with central lead in lane on Warwick Road to help cyclists to travel ahead without conflict with left turning traffic
10 Remove traffic island on Warwick Road to enable a safer movement for cyclists and other road users
11 Re-align existing island on western arm of the junction to provide better access for left turning vehicles from Warwick Road
12 Widen current 1m cycle lane to 1.5m on the eastbound approach to provide more space for cyclists
13 Re-level footway on eastern arm of Holland Road to reduce the steep gradient
Created by Simon Munk // 1 thread
TfL Overview
We are proposing to make improvements to pedestrian and cycling facilities around the junction of A4 Cromwell Road and Gloucester Road.
The junction has been the site of an above average number of collisions in recent years, many of which involved pedestrians. Cromwell Road is both an important arterial road for vehicles entering or leaving west London, and also the location of several popular tourist attractions, attracting thousands of pedestrian visitors each day. In response to the high collision rate, we have worked with the Royal Borough of Kensington and Chelsea to develop two options that would provide safer crossing facilities at the junction as well as improvements for cyclists. Both options are included in this consultation.
The proposals form part of our programme to enhance safety for vulnerable road users on the Transport for London Road Network.
What are we proposing?
We have identified two options for this junction.
The main difference between the two options is the type of pedestrian crossing on the eastern arm of Cromwell Road, closest to the Natural History Museum and the Victoria & Albert Museum.
Option 1 would include a new signal-controlled ‘staggered’ two-stage crossing of the road, in which pedestrians would move to a traffic island in the centre of the road and then wait for a green light before passing to the opposite side. This approach would allow us to retain the current left turn for all traffic from the northern arm of Gloucester Road onto the eastbound Cromwell Road.
These are the design features that are specific to option 1:
‘Staggered’ (two stage) signal-controlled crossing on the eastern arm of Cromwell Road, to provide pedestrians with a dedicated time to cross the road in two stages using a central island
Dedicated left turn lane on the western arm of Cromwell Road as the exit is reduced to two lanes, due to the widened central island needed to accommodate the staggered crossing
Option 2 would provide a ‘straight across’ signal-controlled crossing of Cromwell Road in which the green light for pedestrians would enable them to cross in one movement, rather than waiting on a central island for a second green light. This would in most instances be a faster crossing for pedestrians compared to option 1, but would require the left turn from Gloucester Road to be banned for all vehicles in order to minimise additional waiting time for other road users. Our traffic count surveys show a peak hour average of 65 vehicles completing the left turn from Gloucester Road to Cromwell Road. These vehicles would need to use alternative routes.
These are the design features that are specific to option 2:
Straight across controlled crossing on the eastern arm of Cromwell Road, to provide pedestrians with a dedicated time to cross the road
Banned left turn from Gloucester Road to enable the proposed straight across crossing to operate on Cromwell Road without unduly increasing waiting times for other road users
Re-align yellow box markings in the centre of the junction, to ensure the eastern side of the box is aligned with the layout of the proposed crossing on Cromwell Road
Both options share many of the same features, such as pedestrian countdown features on the crossing of Cromwell Road, new advanced stop lines (ASLs) for cyclists and a new pedestrian refuge island on the northern arm.
These are the features that would be included in both options:
Part width 5 metre deep cycle advance stop line (ASL) on the eastern arm of Cromwell Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility and avoid conflict with left turning vehicles
Widening of existing crossing area on the southern arm and left-turn slip road of Gloucester Road, to provide more space for pedestrians crossing the road
Re-alignment of existing crossing on the western arm of Cromwell Road to better reflect the way pedestrians choose to cross
Part width 5 metre deep cycle ASL on the western arm of Cromwell Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility and avoid conflict with left turning vehicles
Kerb re-alignment on the western corner of the northern arm of Gloucester Road, to provide space for the new central island
Pedestrian refuge island on the northern arm of Gloucester Road, to give pedestrians a protected place to wait when crossing
Loading bay on northern arm of Gloucester Road moved slightly north, to provide space for the new central island and ensure vehicles can turn left from Cromwell Road. There would be no overall reduction in parking space
Reduction of southbound lanes from two to one on the northern arm of Gloucester Road to provide space for a central pedestrian refuge island
5 metre deep cycle ASL on the northern arm of Gloucester Road to give cyclists a waiting area ahead of the general traffic queue, helping to improve their visibility. With option 1, this has the additional benefit of reducing conflict between cyclists and left turning vehicles.
Created by Simon Munk // 1 thread
These junctions are part of the Central London Grid - a set of connected routes for cyclists across central London comprising a network of Quietways and Cycle Superhighway routes.
As part of the Central London Grid, a route is proposed to run between Brompton Cemetery and Exhibition Road, along Bramham Gardens, Earls Court Square and Kempsford Gardens. We are therefore proposing changes to the junctions to make it safer and easier for cyclists, pedestrians and vehicles to cross.
What are we proposing?
Junction 1 - Earls Court Road / Bramham Gardens / Earls Court Square
The proposed changes include:
- Removal of existing island on Bramham Gardens and extension of footway to reduce pedestrian crossing distance
- Widening of the pedestrian crossings on Bramham Gardens and Earls Court Square
- Removal of existing island on Earls Court Square and provision of new smaller island with dedicated cycle stop line
Junction 2 - Warwick Road / Earls Court Square / Kempsford Gardens
Warwick Road
- New signalised junction to allow cyclists, pedestrians and vehicles to safely cross Warwick Road. The traffic signals will be co-ordinated with other signalised junctions in the area and the changes are not expected to have a significant impact on journeys times for road users through the area, although vehicles exiting Earls Court Square will have to wait for a green signal as opposed to waiting for a gap in traffic as at present
- New signalised pedestrian crossing across Warwick Road on the southern arm of the junction. This new crossing will ensure that pedestrians can continue to cross Warwick Road safely and without significant delay
- Existing signalised pedestrian crossing removed (replaced by crossing on the southern arm of the junction). The existing double red lines will be painted across the removed zig-zag markings at the crossing
- Existing parking bay relocated 40m to the south-east on Warwick Road due to the new signalised junction. The existing restrictions would apply to the relocated parking bay.
Earls Court Square
- Vehicles permitted to travel straight over Warwick Road, westbound from Earls Court Square to Kempsford Gardens. This movement is currently banned
- Dedicated signals installed to inform cyclists of when to safely proceed from Earls Court Square
- Additional cycle stands provided to replace those removed from Kempsford Gardens
- Footway re-aligned to maintain existing parking for motorcycles, car share and local residents
Kempsford Gardens
- Existing contra-flow cycle lane widened for cyclists travelling eastbound on Kempsford Gardens
- Dedicated signals installed to inform cyclists of when to safely proceed from Kempsford Gardens
- Existing speed hump to remain to help control speed of vehicles travelling westbound on Kempsford Gardens
Created by Roxanne (CEO) // 3 threads
Erection of a building for Biotech and Biomedical research and development and production together with associated supporting Headquarters and Logistics function along with associated infrastructure to include; access, services, drainage, electric and gas infrastructure, external ancillary structures, car and cycle parking and hard and soft landscaping.
Address:
Land South Of Dame Mary Archer Way Cambridge Biomedical Campus Cambridge Cambridgeshire
Council:
Cambridge
Application reference:
16/0165/FUL
Date application was made:
2016-02-02
Official application:
https://idox.cambridge.gov.uk/online-applications/applicationDetails.do?activeTab=map&keyVal=O1R7L6DXJZE00
Created by jon_events // 1 thread
On-going petition to make Queenstown Road safe for all.
http://www.wandsworthlibdems.org.uk/let_s_make_queenstown_road_safe_for_all
Handed into the council and City Hall June 2015.
Created by jon_events // 1 thread
On-going petition to trial a home zone in the area indicated.
Specific ask is:
We, the undersigned, call on Wandsworth Council to pilot a home zone area on the east side of Mitcham Lane, from Fallsbrook Road to Blegborough Road, for a suitable period of time using temporary measures to see if the benefits from creating a permanent home zone outweigh any potential traffic disruption that may be caused.
The Mini-Holland approach taken to filtering traffic in Waltham Forest gives an example of how other parts of London are creating safer streets.
Created by jon_events // 1 thread
High levels of non-residential motor traffic use these streets as alternatives to the surrounding A roads. The proposed trial asked by the petition should help stop this happening whilst maintaining bus route access and emergency vehicle access to St George's.
http://www.wandsworthlibdems.org.uk/safer_streets_smallwood_fountain_rd_area
Created by jon_events // 1 thread
On-going petition to make Tooting High Street safe for all:
http://www.wandsworthlibdems.org.uk/let_s_make_tooting_high_street_safe_for_all
Handed into City Hall early 2014.
Created by jon_events // 1 thread
On-going petition to make Tooting Bec Road safe for all:
http://www.wandsworthlibdems.org.uk/let_s_make_tooting_bec_road_safe_for_all
Created by jon_events // 1 thread
On-going petition to make Mitcham Lane safe for all add your support here:
http://www.wandsworthlibdems.org.uk/let_s_make_mitcham_lane_safe_for_all
Petition ask:
We, the undersigned, call on TfL and Wandsworth Council to make changes to Mitcham Lane so that cycling can be an option for everyone, not just the fit and the brave.
Originally submitted to the council in the Autumn 2013.
Created by MartinGT // 2 threads
Add a cycle path on the broadway road. This should be off the road as its currently unsafe and a race track. The grass verge is wide enough for there to be a cycle path added adjacent the current pavement.
This would encourage more people to cycle between Horsforth & Farsley and people from Rawdon & Rodley to cycle to Horsforth then onto the Canal into Leeds etc.
Created by Simon Munk // 1 thread
Royal Borough of Greenwich are working with its partners Transport for London (TfL) and Sustrans to develop proposals for new ‘Quietway’ routes, to enhance facilities for people cycling or walking, whilst minimising impacts on other road users. This set of schemes would implement improvements along the cross-Peninsula section of the ‘Thames Path Quietway’ in Peninsula Ward. Further proposals for sections of this route in other Wards will be brought forward for consultation in due course.
What is being proposed?
For this set of proposals, we are consulting on the following schemes in the Peninsula ward:
(a) Old Woolwich Road, junction with Lassell Street (scheme ref: QTP3b)
A more people-friendly junction has been designed to benefit pedestrians and cyclists. This includes kerb build-outs to tighten the junction, particularly on the north side of Old
Woolwich Road at its junction with Lassell Street, to improve the crossing point for
pedestrians and slow vehicle speeds. One car parking space will be lost as a result.
(b) Gibson Street, junction with Banning Street (scheme ref: QTP3c)
New kerb build-outs are proposed at the junction of Gibson Street with Banning Street,
which will move the ‘give way’ markings forward and so improve sight lines for cyclists
turning right out of Gibson Street. In addition a ‘cycle hangar’ secure cycle parking facility is proposed for the wide footway space on the south-western side of this junction (corner of Enderby Street and Banning Street). No car parking spaces will be lost as a result of the proposals.
(c) Southern Park (adjacent to Ecology Park; scheme ref: QTP8)
An existing, well-lit, hard standing path borders the southern and eastern perimeter of the Southern Park (adjacent to the Ecology Park), linking West Parkside with the riverside path at Greenwich Yacht Club. No changes are proposed to this path itself; however it is proposed to clearly sign this section only as ‘shared use’ for cyclists and pedestrians. At the existing Toucan crossing at the junction with West Parkside/ Southern Way, extra space will be created by removal of a small section of wooden fencing, and relocation of a small tree.
(d) Riverside, junction with Lombard Wall (scheme ref: QTP9a)
Priority will be given to the Thames Path route, providing extra safety and security for
pedestrians and cyclists. A raised table at the junction of Lombard Wall as it meets Riverside will slow any vehicular traffic. The western side footway will be improved for pedestrians. No car parking spaces will be lost from the proposals.
(e) Riverside, junction with Anchor and Hope Lane (scheme ref: QTP9b)
Priority will be given to the Thames Path route, providing extra safety and security for
pedestrians and cyclists. The cycleway will be realigned to better connect with Riverside,
and the junction will be resurfaced in green to provide increased awareness of cyclists. No car parking spaces will be lost from the proposals.
Created by Dominic Fee // 1 thread
This issue covers Westminster City Council's proposals for a Quietway Cycle Route Link in Bayswater
Created by Simon Munk // 1 thread
The Council has successfully secured funding from Transport for London (TfL) to improve safety for all road users along the whole length of Billet Road. In the last 5 years a total of 62 accidents which involved injuries and fatalities were recorded making this a particular unsafe area within the Borough. The scheme aims to reduce accidents along the road whilst improving the overall safety for all road users.
In September and October 2015, we sent a survey to local people asking them to identify problems along the road and to tell us what they would like to see to help improve road safety. The results of the survey showed that people were most concerned about crossing the road, getting around the area and not feeling safe when travelling along the road.
The top improvements people would like to see were; slower traffic, safer crossing points, protected cycle lanes and better pavements.
We also asked Emergency Services about the issues they faced and what they would like to see to help improve road safety.
Proposals
Based on the results of the survey and the feedback from Emergency Services we have
developed a set of proposals that aim to make improvements for all road users:
• Bus stop improvements to provide better access for passengers including disabled users.
• Improve and raise the existing zebra and signal crossings.
• A new raised zebra crossing on Billet Road near Cecil Road.
• 20mph speed limit along Billet Road.
• Better and energy efficient street lighting.
• Tree planting and footway resurfacing along the road.
• A new raised road table at Billet Road’s junction with Guildway to reduce traffic speed.
• Two-way, fully segregated east and west cycle track.
• New ‘floating’ style bus stop to improve safety for cyclists and bus passengers.
• Raised areas at junctions that prioritise pedestrians and slow traffic down.
• De-cluterring of street furniture such as removing redundant posts and signs along Billet Road and side road entrances.
• Parking bays relocated at certain unsafe locations along the road to be converted to
segregated cycle track. New parking bays will be provided nearby.
• Various waiting and loading restriction at locations of concern to improve road safety
and ensure smooth flow of traffic.
• Anti-skid surface to help prevent vehicles from skidding.
Please note there are also a number of locations on the road where future improvements works will be happening outside of this scheme. These are highlighted as ‘future improvement works’ on the plan.
Created by Simon Munk // 1 thread
The council is consulting with the public about making changes to traffic movements in and around Cable Street.
The proposed changes are designed to alleviate the number of vehicles cutting through Cable Street to avoid congestion on The Highway.
There are a number of vehicles using Brodlove Lane and Cable Street as a ‘rat run’ to travel from The Highway to Butcher Row.
The changes to be considered by the public include one-way parts of Cable Street.
It is also proposed that a number of measures be introduced to make the area safer for pedestrians and cyclists.
A new bus lane will be created on a short section of Cable Street between Sutton Street and Watney Street. This will be supported by the closure of the north end of King David Lane to all motor vehicles.
The changes will see a significant reduction in the amount and speeds of traffic using Cable Street and surrounding roads.
In preliminary consultation with businesses and residents, the council was told cyclists are uncomfortable using the narrow two-way cycle lane.
The council proposes the cycle lane be widened for cyclists travelling against the traffic, with cyclists travelling the other way joining the main flow of reduced traffic.
The area between Shadwell Overground and DLR stations and Sutton Street will be completely redesigned to ensure priority for pedestrians.
The proposals will also see the introduction of pocket parks and improved community spaces to make the area look and feel more attractive.
Mayor of Tower Hamlets, John Biggs, said: “We have developed these proposals after being made aware of initial concerns from residents, businesses and people who travel through the area. These detailed and well developed plans will improve the area for all road users. We welcome any comments to ensure that we have taken everything into consideration.”
Cllr Ayas Miah, cabinet member for environment, added: “For far too long the safety of people using Cable Street has not been given enough priority. These proposed changes will stop vehicles from cutting through the area for the benefit of pedestrians and cyclists. The aesthetic changes proposed will enable all local people to be proud of the area that they live or work in.”
Full details of the proposals are being sent to 5,000 addresses along Cable Street and in the surrounding area.
Created by Simon Munk // 1 thread
The London Borough of Hounslow is proposing cycling and pedestrian improvements on Bedfont Road, an important link between the A30 Great South West Road and Chertsey Road that is served by the H26 bus route.
This scheme's primary aim is to widen areas of footway in order to provide a 3m wide shared pedestrian and cycle route along the length of Bedfont Road, improving access to homes, businesses, and leisure facilities such as Bedfont Lakes. The proposals also include improved pedestrian crossing facilities and bus accessibility, which would particularly benefit vulnerable road users.
Created by Mixhael // 1 thread
Camden are consulting with residents of, and neighbouring residents to, The Three Fields Estate on Arlington Road.
Part of their proposal is to remove the awkward dog-leg on Miller Street. Hurray.
I know Miller Street is a popular east-west desire line and (sort of) connects up with Pratt Street.
The proposal doesn't mention cycles. Boo. I'd hate to see it being pedestrians only. Although it's difficult to tell what is meant by the pink colouring on the proposed plan, it does look like their will be vehicular access in this area. Let's hope the existing filtered permeability will be maintained.
More details here http://camden.gov.uk/ccm/cms-service/stream/asset/?asset_id=3418488&
There will be a consultation meeting at Fairfield Play Centre 18:30 to 20:30, Thursday 25th February 2016. I'll pop along and see if I can find out more.
Created by Valleys Cycling // 1 thread
Major roadwork are being carried out at Upper Boat including signalising junctions and installing footway (phase 2). Unfortunately the opportunity in both Phase 1 and 2 has been missed to install a cycle crossing to link the current cycle path from the South to Hawthorn via the Upper Boat PH cul-de-sac. This would have enabled safe cycle trips, avoiding the busy roundabout and given students access to the new college in Nantgarw.
Created by Harry Fletcher-Wood // 1 thread
Hackney Council are consulting on a series of proposed improvements to this area. The key features of this proposal are:
- Raised pedestrian crossings (one new)
- Widened pavements
- Raised table entry treatments
- Four new cycle contraflows on existing one-way streets.
The council is also considering area-wide modal filtering, and canvassing views, subject to further consultation later.
Created by John Ackers // 1 thread
Lever Street - Two-way cycling, providing a westbound cycle lane
Junction Bath Street/Lever Street - Kerbside build-out to protect cyclists turning into contraflow cycle lane. Loss of one car parking space and the provision of parking facilities for six bicycles.
Bath Street through to Bunhill Row - Refreshing existing road markings to better define the cycle route
Bunhill Row - Clearly marked contra-flow cycle lane which will help cycle safety by making it clearer that cyclists are using this route
Bunhill Row junction Chiswell Street - Protection for cyclists with footway build-outs and traffic islands. A signalised junction could be considered in future, depending on the outcome of a consultation carried out by the City of London in November 2015.
Chiswell Street - Introduction of segregated cycling facilities resulting in the loss of some parking bays
Chiswell Street/Finsbury Square junction - separate traffic light phases for cyclists
Finsbury Square - Two-way segregated cycle lanes
Sun Street/Wilson Street junction - Two-way segregated cycle lane
Featherstone Street/City Road junction - Featherstone Street at the Junction of City Road will be closed to motor traffic
Leonard Street - Inset parking bays and widened cycle lane to improve contraflow cycling
All the drawings are linked to the Islington cycling page at http://www.islington.gov.uk/involved/consultation-engagement/consultations/Pages/cycling-consultations.aspx
Created by George Coulouris // 1 thread
Camden says: "To be delivered as part of the Central London Cycle Grid, the key aspect of this scheme proposes a road closure that would restrict access for motor vehicles between Lansdowne Terrace and Brunswick Square at the junction with Bernard Street. This closure allows us to create a large pedestrian-only area, provide a new cycle track, simplify the road layout and rejuvenate the area around the square."
This scheme removes a mini-gyratory and links well with these two consultations for the North - South Cycle Superhighway:
http://camdencyclists.cyclescape.org/issues/2045-north-south-cycle-superhighway-extension-to-kings-cross
http://camdencyclists.cyclescape.org/issues/2057-midland-road-and-euston-road-judd-street-junction-north-south-cs-link
Quietway 2 passes through here:
http://www.cyclescape.org/issues/1503-quietway-2-consultation-on-proposals-for-guilford-and-calthorpe-streets
Created by George Coulouris // 1 thread
This joint TfL/Camden consultation takes the North – South Cycle Superhighway across Euston Road and continuing with a section of central London grid on Midland Road to join the existing southern extension of the Royal College Street route.
It includes:
- Cycle-only green signal to allow cyclists to cross Euston Road separately from motor traffic
- Two-stage right turn areas to allow cyclists to access Judd Street and Midland Road without crossing lanes of moving traffic
and two options for Judd Street:
Option 1 – Full closure of Judd Street at Euston Road / Midland Road junction to allow a dedicated cycle crossing across Euston Road
Option 2 – Judd Street entry only for motorists from Midland Road, with segregated northbound contraflow cycle track
Created by Space Pootler // 1 thread
Junction Road is used as a rat-run by motorists between the A4 and Little Ealing Lane/Northfields Avenue. The problem is especially acute around Whitestile Road and Enfield Road (which is too narrow to accomodate this traffic).
This traffic should rightly be sent onto the B roads surrounding the area, and the neighbourhood preserved for the access of its residents.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Martin Lucas-Smith // 1 thread
The Eastern Gate proposals are a strategic attempt by the City Council to rework the Newmarket Road roundabout area towards a standard crossing, and create a welcoming entrance into this very run-down looking part of the city.
It is supposed to be being paid for by Section 106 moneys from developments, yet proposal after proposal is coming forward but nothing is happening.
Created by James Avery // 0 threads
As freeholders of the site, Tesco have applied for planning permission for two new restaurants between the roundabout shown and the railway tracks / A444 (above the dual carriageway).
Two core issues:
1) This is an extremely dangerous, uncontrolled crossing - traffic leaves the A444 at 50mph, and is still 30 as it reaches the roundabout. As the map shows, there are Belisha crossings both north and south of this roundabout, so why not to the west, where traffic is still fast and undivided?
2) Cycle parking on the rest of the site is still grossly inadequate. 18 cycle parking spaces are proposed with the restaurant - the same number as the rest of the site combined - although these are actually all in one place at the south of the site.
Created by Mr Andrew Woodhouse // 1 thread
When trying to turn right up Regent Street to join the orbital route from Lawrence Street cyclists have to use the main traffic straight on lane indicating right and stopping at the junction, with no safe marked or protected bay to direct traffic from either direction around them. Making the cyclist exposed and also confusing and frustrating drivers.
Coming up Lawrence street I often feel intimidated by drivers as I indicate right and pull into the straight on lane, I guess as they don't understand that cyclists can turn right and cars can't, there is no indication to the traffic that this is possible, with either road markings approaching or at the junction. Also when turning right the cyclist is faced with oncoming traffic itself trying to turn right, not understanding why the cyclist is positioned where they are in the road, and maybe also taking up the possibly safe space that the cyclist needs to use to get out of the traffic.
This junction has often been suggested a prime site where a continental-style 'all green phase' signalling scheme could be tried.
Created by Matt Turner // 0 threads
Any cyclist using this cycle lane is at risk from vehicles using the narrow main carriageway as they move into the cycle lane to make it around the corner.
This junction is newly designed and was installed in Summer 2012.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by George Lund // 2 threads
Transport for London are "proposing improvements for pedestrians and cyclists by providing signalised shared ‘Toucan’ crossings for pedestrians and cyclists on all four arms of Charlie Brown’s Roundabout. Presently there are no signalised crossings at the roundabout. Pedestrians and cyclists using the existing un-signalised informal crossing points need to wait for a safe gap in the traffic to cross, which can be difficult at times and make them feel unsafe."
Created by christhebull // 1 thread
This section of road is surprisingly hostile to cycle along on account of the restricted width, parked vehicles and high traffic speeds. I have had drivers behind me screech to a halt when they realised that they are likely to collide with me or an oncoming vehicle, and moving out to pass parked vehicles is needlessly stressful.
There is a vehicle activated "30 mph" light-up sign along this road but it is hopelessly inadequate, and more substantial methods of reducing traffic speed are going to be necessary.
Note also that the option of using Snowdon Road and then Fishponds Road is not only longer and steeper, but still involves awkward pinch points northbound along Fishponds Road. This is an important route linking the Hollies (halls of residence) and UWE Glenside with the centre of Fishponds and thus ought to be a priority within this area.
Created by Andrew Woodward // 2 threads
There is currently a cycle track to the David Lloyd sports centre from the Staines Rd; which turns into a muddy track, blocked at the exit to Uxbridge Road by a difficult and narrow gate.
Upgrading this short section of path with decent surfacing, streetlighting and removal of obstacles would provide a good link from the cycling facilities on the A316 and the Staines Road onto the schools in Hampton.
Created by Andrew Woodward // 1 thread
There is room on this pavement for a properly segregated cyclepath that would feed up to Christ's school and continue up as a quiet route up to near the top of Richmond Hill as an alternative to the busy and unpleasant Queen's Road.
RL // 1 thread
Drop kerb removed from Tanners Moat-Rougier Street pavement as part of Lendal gyratory works Feb-Mar 2018. Makes movement from Tanners Moat to Rougier St pavement difficult, hazardous, unattractive, painful for people with buggies, wheeled luggage, in mobility buggies, in wheelchairs or pushing same, people on bikes and all variants including heavy electro-assist models, laden with luggage (part of NCM65 avoiding pedestrian-only Scarborough bridge), with children, with trailers, and everyone who experiences pain from lifting/bumping a bike or anything else up a kerb.
Brings people on bikes and variants turning off Lendal bridge into Tanners Moat into conflict with those using the cycle cut-through as a dropped kerb. (The turn is already tricky.)
Council said it didn't do counts of who uses or the type of user on Tanners Moat before removing the drop kerb.
Undermines Government aim for most short journeys to be made on foot or on bike by 2040.
Does not support York's ageing population.
Undermines the tourism offer.
Created by jpennycook // 0 threads
Drivers are unaware/don't care/don't see cyclists in the cycle lane, so pull out of Lidl an Old Worting Road turning left, or turn right from Worting Road to Old Worting Road leading to very near misses. The cycle lane should be replaced with access to Old Worting Road near the bus stop, and improved access to Lidl provided.
Kate Ravilious // 0 threads
The padlocked barrier at the end of Hospital Fields Road is inaccessible for non-standard cycles, and difficult to pass through for anyone except the most able-bodied cyclists.
Created by Jon_B // 1 thread
Warwick Road is marked as an "Advisory Cycle Route" on the Suffolk County Council cycle map.
However, in morning rush hour it is frequently backed up a considerable distance heading south towards the traffic-light controlled 4 way junction with St Helens Street / Spring Road / Grove Lane.
There is an ASL on these lights, but in practice the carriageway is too narrow to allow cycles to pass the stopped traffic on the left hand side - particularly as the route is used by buses which occupy the space right up to the kerb.
Overtaking on the right is not a safe option where there is queue of stopped traffic as this is a two-way road with the added complication of traffic pulling out from Lancaster Road.
Given that the motorised traffic flow seems to be mainly south bound it would seem appropriate to make this a one-way street with a proper cycle lane including changing the phasing of the lights to allow cycles an advance phase to make the turn into Spring Road / St Helens Street.
One-way flow up another of the cross streets (probably Palmerston Road ) in the Northbound direction would complete the "loop" for cars and also ease traffic flow on that road which is currently difficult for cars or bikes to negotiate in a northbound direction in rush hour.
Created by Sam Saunders // 1 thread
Northumberland Road (part of Concord Way at this point) has been deliberately narrowed to allow pedestrians to cross between the footbridge and the Sports Centre and a cycle lane marking has been placed to one side of the narrow gap. The gap, however, is not wide enough to allow a car and a bicycle to go safely through the pinch point at the same time. A cyclist needs to take the centre of the lane, or pull over and wait for vehicles to pass.
Either the carriageway should be re-widened (preferred) or the cycle lane indicator should be removed.
Created by Stephan Matthiesen // 0 threads
Need proper bicycle racks in front of Margiotta (there are a few wheelbenders in a corner)
Created by John Chamberlain // 1 thread
For the last year Torrington Place and Tavistock Place have had segregated cycle tracks on both sides of the street. This consultation is about making the current trial arrangement permanent. The current lightly segregated tracks would mostly become stepped tracks and there would be other improvements to junctions as well as increased space for pedestrians. There is a lot of local support but also significant opposition, mostly from residents of Judd and other streets where motor traffic volumes have increased. We think this can be corrected by the (separate) proposed changes to Judd Street and at Brunswick Square.
It's important that all cyclists and others in favour respond using the website below. Otherwise we are in danger of losing this flagship facility. You don't have to live in Camden but you do need to provide an address and postcode.
Martin Lucas-Smith // 2 threads
Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society. Construction of replacement facade, reinstatement and refurbishment of historic features and internal and external access and refurbishment works including enlargement of existing cafe (use class A3) and re-opening of 'footlight's' entertainment space (sui generis). Demolition of squash courts and un-listed 3-5 Round Church Street in the conservation area. Construction of new link building for access and ancillary uses for the Union Society. Construction of adjacent new building with ground floor restaurant (use class A3) with 41 room post-graduate student accommodation above (use class C2) together with basement storage and services.
Cambridge Union Society 9A Bridge Street Cambridge Cambridgeshire CB2 1UB
Application reference : 16/0673/FUL
Also a Listing Building Consent application: 16/0674/LBC Demolition of ancillary buildings and removal of 1930's facade at the grade II listed Cambridge Union Society
Created by Jack Thurston // 0 threads
The four-way junction at Cross Street / Monk Street is dangerous for cyclists, with large vehicles making the turn, crossing onto the other side of the road. It is even more dangerous for pedestrians. There are no pedestrian crossings provided at this crossing requiring pedestrians to walk a very long way around to get from one side of Cross Street to the other, or to take a chance by crossing through the motor traffic.
Created by Adam Edwards // 1 thread
Map shows the route which Hertfordshire are upgrading as part of the Hatfield to Rail Station link footpath works. The plan is just for enhanced lighting, when what really should be done is to make this shared use.
Cyclists would then use the exisiting route from the station up French Horn Lane, push accross the Puffin crossing (or cycle on road), use the stub road to the phone exchange and then go shared us to the Toucan crossing to the Market Place. That is the start of the on and off road cycle route to the University and De Havilland Village, the Alban Way and beyond.
Without this link cyclists have to use Queensway and turn at the large fast two lanes wide roundabout at the junction with Wellfield Road. This is a major deterrnet to use.
Other than two sheffield stands in the train station there is no secure cycle parking available in Buxton. This is discouraging people from travelling to this tourist hotspot by bike.
Created by Andy Allan // 0 threads
Heading southbound from New Malden along Malden Road, there is a segregated bike path for most of the route between the Fountain Roundabout and the A3. Unfortunately it ends around 100m before the A3 junction, and bikes are forced back onto the busy A2043.
It would be a good idea to link the bike path along the A2043 to paths around the roundabout, to make a joined up route.
Created by Kevin Ablitt // 0 threads
When traffic backs up on Spring Road from the Grove Lane lights motor vehicles cut through via Bartholomew Street, Alexandra Rd, Warwick and Lancaster Roads to Palmerston and then onto St Helens.
They travel fast and a group of five or more motor vehicle drivers copying each other is not unusual, at peak times.
To protect the residents of these narrow streets, filtered permeability would seem to be the only answer.
Created by cobweb // 43 threads
"The Greater Cambridge City Deal was signed by Central Government, Council leaders, businesses and the University of Cambridge and aims to secure hundreds of millions of pounds for the areas of Cambridge City and South Cambridgeshire.
The Greater Cambridge City Deal aims to ensure that the success of the area continues by investing in the transport infrastructure, housing and skills needed to see future economic growth.
The first £100m of funding will be made available for transport improvements in the five years from April 2015."
Created by Chris Peck // 1 thread