Traffic Light Sensor
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
This section lists issues - problems on the street network and related matters.
Issues always relate to some geographical location, whether very local or perhaps city-wide.
You can create a new issue using the button on the right.
Listed issues, most recent first:
Created by MikeF // 1 thread
Traffic light sensor on Beechwood Avenue does not detect 6061 T6 aluminium bike frames very well
Created by MikeF // 1 thread
Traffic light sensor on Tavistock Road at Derriford roundabout (inbound) is unable to detect cyclist correctly forcing extremely long waits in the early hours until a car comes along to trigger the lights
Created by Tom Chance // 1 thread
Making it safe and convenient to travel from Sydenham Hill onto London Road and then onto Wood Vale would improve the link from this part of Sydenham / Crystal Palace into East Dulwich and onto the LCN 25 and 22 routes north.
Currently one can either dismount at the bottom of the hill, cross Sydenham Hill and then London Road by foot and then take the off-road cycle lane onto Wood Vale; or one can cycle left onto London Road, cross two lanes of traffic, brake into the little cut and cross over the southbound traffic to get onto Wood Vale. The first route is slow and inconvenient, the second is dangerous.
Created by David Earl // 1 thread
According to the Cambridgeshire Road works register, Pembroke Street is going to be closed for a long period starting September 2 by the museum of Zoology. Not clear what, if any, the impact on cycles would be, but the hole will be a dramatic 10m deep, so the works will presumably be quite extensive. Also, Tennis Court Road closed for one day on August 9 to prepare.
http://roadworks.org/?u_se_id=30862209:1&e=545014&n=258186&z=7&t=b
Created by Chris Sandbrook // 1 thread
I have just watched a police car over-run the advanced stop lines twice on Gilbert road, once at the Carlton Way cross roads and then again at the Milton Road T-junction. Both times the police car was approaching an already red light, so they had ample time to stop before the line. The second time they filled at least half of the box. If the police in Cambridge can't be relied on to respect the advanced stop line, how can we expect the general public to do so? Does anyone have similar stories or any suggestions on what to do about it? I didn't get the number plate unfortunately, because I thought turning round and photographing a police car on my phone might be more trouble than it's worth!
Where the quite good segregated cycle lane joins The Ride, DfT advice was certainly NOT followed. As per DfT advice, when cycle lanes are merged with the carriageway, it should be done via a length of dropped kerb that is flush with the carriageway and the cycle lane shouldn't be joined at a 90 degree angle to the road.
Here, the cycle lane runs parallel to the road for a short distance before it loops around a large boulder specifically placed to force cyclists around and then finally joins the road at a 90 degree angle.
The kerb, though dropped, is far from flush and creates a risk for cyclists joining the track from the road.
This junction between the road and the track should be scrapped and redone according to DfT guidelines.
Created by WilliamNB // 0 threads
When cycling from Marsh Mills towards town, the pavement is a bi-directional shared path, albeit of poor quality and far too narrow to be safe. As you approach the junction where the off-ramp for Old Laira Road veers off to the left, cyclists are forced around a barrier to meet the road perpendicularly, where they have to wait until there is a large enough gap in traffic to allow them to cross.
This is one of Plymouth's main cycle routes into and out of the city, while Old Laira Road is not a main arterial route and indeed has a 20mph speed restriction in place further on.
It would be good if the on-footway cycle provision can become a segregated cycle path for a short distance, which may be continued across the slip road veering off to the left, as has been done on Laira Bridge Road recently, as well as on Alma Road, approaching the junction with Outland Road and Milehouse Road.
Clear signage could be erected to show traffic wishing to cross the cycle track that it should yield to cyclists.
The cycle track should be continued past the small traffic island and retain priority over traffic joining from Old Laira Road, before it can merge again with the shared pavement along Embankment Road.
Created by WilliamNB // 0 threads
When cycling north-bound along Tavistock Road, there is a cycle lane in places. Once out from under the Crownhill Road bridge the lane turns sharply left, forcing cyclists to yield to traffic joining Tavistock Road from the left.
The Highway Code states you should yield to traffic from the right and this junction is very dangerous to cyclists. It would be far better to simply continue the cycle lane straight ahead and erect yield signs to traffic joining Tavistock Road
Created by WilliamNB // 0 threads
When Chapel Street was recently renovated and resurfaced, new on-carriageway cycle lanes were painted. Sadly (predictably?) these lanes end just when they are most needed.
The fact that the lane ends, when cycling in a northernly direction, is in itself an annoyance.
The manner in which it ends is stupid beyond belief:
A yield sign has been painted at the end of the lane. This means, to remain perfectly within the law, cyclists riding in the lane must yield to traffic traveling in the same direction and may only proceed when there's no traffic approaching from behind.
It is legally possible to avoid having to yield by leaving the cycle lane before it ends and by riding on the main carriageway.
Created by WilliamNB // 1 thread
When travelling along Billacombe Rd in a westerley direction, there is a dedicated right-turn lane at the junction with The Ride. As is the case with many traffic lights across the city, there is an induction loop system buried in the road.
This seems unable to detect the presence of cyclists waiting to turn right at the lights, thus forcing cyclists to skip a red light.
Martin Lucas-Smith // 1 thread
The Cambridge News reports that new traffic calming is to be installed on Fen Road.
Cyclists' views ought to be included so the opportunity is taken to improve things for cycling rather than make things worse.
http://www.cambridge-news.co.uk/News/150k-project-to-tackle-Fen-Road-racers-20130803060000.htm
Created by DaveE // 0 threads
The dropped kerb is about 5-10m down the pavement from where the cycle-path meets the road. This encourages cyclists to cycle along the pavement and there are no shared use signs to warn pedestrians.
Created by DaveE // 0 threads
The link between the cycle-path and Trent Close is missing. It is expected that cyclists should dismount, negotiate a large number of parked cars, and an un-dropped kerb to go from cycle path to road or vice-versa. This is unreasonable and I can't think of a reason not to have the cycle path join straight into the end of the road with no interruption.
The current situation encourages cyclists to cycle along the pavement for entire length of Trent Close to reach a dropped kerb, causing unecessary delay and potential conflict between cyclists and pedestrians, as the pavement isn't very wide.
Created by DaveE // 0 threads
The road surface on Wimlands Road is quite dangerously poor. There is much gravel on the road, particularly in the centre, and there are numerous small potholes to dodge.
This is leading to a risk of accidents involving cyclists and putting off inexperienced cyclists from cycling to work.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
Created by DaveE // 0 threads
The lights seem to always wait until no traffic is coming on the road before changing in favour of cyclists/pedestrians using the cycle route (NCN 20) to cross the road.
The road is very busy and this equates to extended unecessary delays. What is the point in lights that hardly ever stop cars?
This, combined with the terrible surface of the path to the south, is discouraging cyclists from using the cycle route, pushing them onto the very busy road junctions to the east and west, which have little to no cycle provisions.
Another effect is encouraging people to take risks crossing before the ligths have changed, and leaving the lights to (eventually) change when no-one needs to cross any more.
The condition of the cyclepath is so bad that a road bike with narrow tyres cannot be comfortably or safely ridden along the cycle side of the segregared path. There are numerous potholes of more than 25mm depth and quite a bit of loose gravel besides a generally very rough surface. The surface is more pothole than surface in places! It is even bad for mountain bikes and especially bad for small wheeled bicycles such as folding bicycles. This is forcing cyclists to use the pedestrian side of the path, with the potential for safety issues and confrontation. Last seen mid July 2013.
Cycling provision totally inadequate in proposals.
Created by Jon Warbrick // 1 thread
Contractor's safety fencing for some of the work going on adjacent to Addenbrookes has been put up on the adjacent cycle path, presumably because it's easier to to that than put it up in the building site itself. Unfortunately this obstructs about a third of the path.
Whoever did this obviously realised that this was problematic, since they have painted the path side of all the bases yellow. Unfortunately this doesn't help in the dark.
I can't see any obvious contact details for the contractors, apart from 'Tamdown' on an attached 'Danger - Deep Excavation' sign. Anyone any idea how to get this addressed?
Notice is herby given that Southampton city council
proposes to make the following
The City of Southampton(various roads)
(movement restrictions)(amendment no9)order 2013
1. the effect of the order is to remove the contraflow cycle lane on
second avenue between first avenue and the north-westernmost
access to the NXP site, approximately 150metres south-east of allington
road thus reverting this part of second avenue to two way traffic. The
contraflow cycle lane will remain on the part of second avenue between
the north-westernmost access to the NXP site and allington road.
2.Copies of the order, relevant map and statement of reasons for
proposing may be inspected during normal working hours at my enquiry
office. Further information may also be obtained from the Southampton
Highways Partnership (traffic management) on 02380798064
3.Any person wishing to object to the order must write to at the
address given below or email:
Traffic.Orders.legal@southampton.gov.uk stating the grounds for
objection within 21 days of this notice (i.e. by 2 August 2013)
Dated 12 July 2013
Richard Ivory Head Of Legal, HR and Democratic Services,
Created by Sam Saunders // 0 threads
The Brunel Mile is a notional route between Millennium Square and Temple Meads Station. A video (date uncertain) on the Better By Bike website shows the intended journey. http://www.betterbybike.info/video-list/millennium-square-to-bristol-temple-meads-along-brunel-mile
Some of the route shown in the video corresponds with Bristol Cycling Campaign's important orbital freeway: Fo1 Inner Loop Redcliffe Way to Triangle. (see https://maps.google.co.uk/maps/ms?msid=213139683046776952805.0004d820d652973f23c70&msa=0&ll=51.491805,-2.665343&spn=0.025758,0.032959&dg=feature) To enable a network to develop coherently as it grew, Fo1 would be our recommended route.
As it stands (July 2013) there is only one short section of the Brunel Mile that meets a majority of the criteria that would characterise a cycling Freeway, namely the segregated cycle lane across Redcliffe Bridge which fails only on the "continuous" criterion. It seems important that all of it should do, as a priority, given that sections of the Brunel Mile are very heavily used by cyclists and pedestrians, especially at peak times. For many visitors coming by train with cycles or using the Brompton Dock at Temple Meads this will be a first experience of cycling in Bristol. It needs to make sense and to be easy to use first time.
Issues and suggestions, as things stand, are as follows
1. Pero's Bridge already has too much pedestrian and cycle traffic. It is often uncomfortable for pedestrians and for cyclists. Keeping it as part of a major cycle route through the city is unacceptable. Route Fo1 uses Prince Street instead, where a wide segregated cycle lane would be feasible.
2. The Royal Oak Avenue, Queen Square and Bell Avenue sections would benefit from clear segregation of pedestrians and cyclists, along the lines suggested by the de facto segregation that tends to happen at peak times.
3. The pedestrian and cycle crossing at Welsh Back might benefit from an analysis of behaviour at that junction and consideration of standards adopted in other places. Casual observation suggests a great deal of uncertainty among all road users as to what is supposed to happen and who has priority.
4. At the end of Redcliffe Bridge cyclists are faced with uncertainty as to whether to continue along the paved area beside Freshford House or use the pavement alongside Redcliffe Way. Signage at that point (as it is all along the route) is confusing, inconsistent and unspecific.
5. Crossing Redcliffe Street by cycling straight over the zebra crossing and expecting cars to stop seems to be condoned, and practised. This doesn't feel right and matches no standards that I am aware of. A clear decision needs to be made about how cyclists and pedestrians can cross here without arcane knowledge of "Bristol Rules". Many of those using this (as on the other crossings on the Brunel Mile) are visitors to the city on their first mile of city cycling.
6. The following section of Portwall Lane could be made into a fully segregated cycle lane, with a better crossing at Phippen Street. The numbers of pedestrians, cyclists and out-of-office smokers on this section can be very high and leaving the traffic to fend for itself is inimical to a genuine 8-80 environment.
7. At the end of the Portway there is great ambiguity about how to reach Temple Meads on a bike. The Better By Bike video shows the least satisfactory option that ends abruptly on the wrong side of Temple Way with two busy pedestrian crossings and an unsatisfactory cobbled road to negotiate before reaching the front of the station. Most cyclists seem to use one of the more direct routes over light controlled crossings to The Friary, thence to the side entrance of Temple Meads where the presence of the Brompton Docks and the Cycle Hub van give a natural welcome.
8. Development work on the derelict "island" around Portwall Road East should take full account of the existing use of that section as a crossing point for cyclists and pedestrians getting to and from Temple Meads Station.
In conclusion, A cyclist coming off the platforms at Temple Meads should be able to see very clear signs about which exit to use, and which path to use to get to Bristol City Centre. At present there is nothing at all. Once they have made an exit they should be able to see cycling specific signs that are prominent and clear. They should then be able to follow a designated route that is self-evident and waymarked. The current pedestrian signs are elegant and have good maps, but they are no more use to cyclists than they are to motorists.
A cyclist wanting to get to Temple Meads Station from Bristol City Centre should be able to find the Brunel Mile (on Fo1) from wherever they are without too much difficulty, and then follow it confidently all the way to the railway platforms.
Martin Lucas-Smith // 1 thread
Cherry Hinton Road is currently mainly typical 'blue sign on a pavement' provision, despite having the edge-to-edge width in places for proper cycle provision. A longer-term objective should be to upgrade this.
Outside the old, unused entrance to the boatyard there are barriers that needlessly force cyclists to slow right down.
The cycle lane on Billacombe Road is unusable due to car parking in it.
Created by Eric Booth // 1 thread
I need to report a problem with a route in Whitehall. The council made a hoohaa about linking the cycle path to St George Park. They installed a contraflow in Stretford Road, a bike crossing over Whitehall Road and signage between the cycle path and the park. Laudable. I have used this route to take my daughter to Whitehall Primary School on Johnsons Road for the last year. She had her first Bikeability Lesson on Sunday and is now riding to school (aged 6 - v. proud!!). However, where the link goes through a snicket between the Kings Head pub and Packers Field it is being blocked by cars. This is making navigating a blind corner even more dangerous. Links to pictures below.
A lot of money was spent on this link and its being rendered unusable.
This map shows all issues, whether points, routes, or areas:
The most popular issues, based on the number of votes:
Created by David Wilcox // 0 threads
This junction is a problem. It has four exits and no one indicates their intent. We got the billboards removed a couple of years ago, but there are still accidents here.
It's a 20mph zone and most drivers ignore it.
The Magdalene place junction needs to be blocked off.
Created by Peter Loader // 1 thread
Petition to Three Rivers District Council:
“Please would you deliver a programme of safe cycle routes to our schools, using a substantial increase in the cycling budget of the Community Infrastructure Levy.
(This Levy will become payable by developers).”
Created by Cycling Dumfries // 1 thread
The Maxwelltown Cycle Path runs along the back of the Cuckoobridge retail park, but there's no easy access from the path into it. At the moment cyclists and pedestrians have to come off the path, cross the Glasgow Road at the lights (which are very slow) and then go into the retail park via the exit from the KFC drive-thru window, which is potentially quite dangerous. It would be quicker and more convenient to have a path from the cyclepath into the car park directly. We note that the new Aldi seems to have a direct entrance being built, which we welcome
Created by M Stanley // 1 thread
Large piece of concrete partially blocking access. If this was put here to stop motorbikes, then it is obviously ineffective due to eroded bank on right hand side.
Reported to Leeds City Council via online reporting system 26/02/2016
Created by David Lally // 0 threads
The path between Grace Avenue and Mona Street (Part of NCR 6) has had a ramp added for much better cycle access on the Mona Street end and a useful mirror at the other end to be able to see round the corner to and from Grace Avenue. All very good until... this was followed by the fitting of Dismount signs.
Sustrans Rangers are aware of this.
Created by Sam Saunders // 1 thread
The existing continuous route from Bristol's Cumberland Basin Swing Bridge along The Portway towards Sea Mills and Avonmouth runs under a footbridge beside the sea lock that provides a direct traffic-free link to quiet streets on the other side of a very busy road system. The footbridge is wide and occasionally used by cyclists who carry or bump their bikes up and then down a long series of steps on each side to get to Granby Hill and Cumberland Place. The advantage of using the bridge is that it avoids crossing or joining the multi-lane traffic of Hotwell Road and offers a quiet route to Clifton, and to Hotwells Primary School. It would be useful for cyclists travelling from the west or the east along the existing cycle route. A continuous channel in which to wheel a bicycle at one side of the steps would be helpful for some and make use of the bridge a more viable option than it is now.
Created by Dawes Jaguar // 1 thread
The distance between the cycleway and Vincent Drive is a couple of metres. It is illegal for people to cycle this distance because the connection is via a zebra crossing. This is backed up with a CYCLISTS DISMOUNT sign. This is absurd and needs to be corrected.
There is also an obstructive pavement-mounted tree at this location. There is plenty of space for trees just a couple of metres to the right, so the tree should be removed and a new one planted in the grassy area.
Martin Lucas-Smith // 0 threads
Fitzroy Lane is a major walking route to the Grafton Centre, but bizarrely has no pavement.
One of the two parking queuing lanes should be removed, and pavements added on at least the east side of the street, if not both sides.
20 mph speed limit on Long Bridge section between The Square and Severn Brethren desired
Created by JohnSch // 1 thread
At certain high usage times for the games area, such as on a Sunday morning, despite there two large car parks adjacent to the High school and a very large amount of on-road parking, the cycle itself becomes a car park. Also cars park across the dropped kerbs and along side the path, meaning that access is almost impossible for bicycles, prams and motobility scooters to squeeze through. Parking on the cycle path also blocks the path for users and also damages the surface.
Also surrounding pavements are blocked making it very difficult for the local community to use them and this causes road safety issues.
Created by Jean Dollimore // 1 thread
Camden is consulting on: The direction of motor traffic flow i.e. – should it remain as it is now (eastbound between Gower Street and Judd Street and westbound between Gower Street and Tottenham Court Road) – or change to westbound through the entire stretch between Judd Street and Tottenham Court Road They also ask support for further improvements (including stepped tracks and widened footways) subject to funding being available.
[Deadline extended by Camden Council to 6 January 2019.]
Created by Simon Munk // 1 thread
Kensington & Chelsea council said:
"The scheme aims to reduce the dominance of traffic and create an attractive high-quality environment.
In partnering with Cadogan as the majority landowner, and Transport for London, (TfL), we have the unique opportunity to improve the public realm not only on borough-controlled roads and pavements but also in areas of the street that are in private ownership."
Created by kirbyjames // 1 thread
Comments are invited on Exeter's new east-west shared use route.
In particular suggestions are invited on how it might be improved.
Created by Simon Redding // 0 threads
The barrier in the photo blocks the route where NCN67 joins Storforth Road at the end of the Rother Washlands in Chesterfield.
Perhaps the council was trying to be safe here, but since it's not a well lit area, a cyclist travelling this way at night might well have a nasty accident flying over this barrier.
Created by acsimpson // 1 thread
The traffic island on Maybury Road at the Maybury Junction is too small to accommodate cyclists (especially those pulling child trailers, etc) other than at it's extreme southern end. As this is a two stage crossing it can lead to either the need to cross when red or wait partly blocking the carriageway.
The light timings need changed to allow a full crossing at once or the island needs to be extended.
Created by Shaun McDonald // 1 thread
Comment at Cycle Ipswich meeting:
"Cycle link to new development with dropped curb."
Need to find out exactly which location(s) this is required. Ideal use of filtered permeability to allow people to cycle easier than driving.
Created by Katja Leyendecker // 0 threads
It's a route to school and a natural route for Gosforth residents to walk and cycle into the city centre. Yet it's incredibly over-run by inconsiderate drivers, speeding and blighted by pavement parking. It's 20mph but due to its rat-run nature feels like a motorway thorough-fare. There are blind spots at the metro bridge crossings either end which are dangerous to navigate too. Drivers turning into Ilford / Rectory are also cutting corner, so you'd find a situation of an oncoming cars in your traffic lane.
Newcastle City Council have said there's nothing they can do. I don't believe that to be true. I think they are putting drivers needs before the needs of people walking and cycling.
Created by Simon Nuttall // 1 thread
We'll hold a stall at this event, sign up for slots!
Energise Cambridge is an exciting campaign to get Cambridge students engaged
on climate change and persuade the university to change their energy supply
to renewable options. We are holding a massive rally on Parker's Piece on
February 10th at 12pm to show student support for the issues we are raising
and to generate publicity.
Find out more at http://www.energisecambridge.org/
Sign up at: http://www.doodle.com/w5qca6zspa29rvi7
Bermondsey St is being used as a rat run not just along its length but also across at Tanner St. Through traffic should use the A100, Tooley St or Borough High St.
Could be a good mode filter project
Created by cobweb // 1 thread
The installation of one stand in the boundary of M&S facing Market Hill Square.
Created by David Earl // 1 thread
County Council press release: http://www.cambridgeshire.gov.uk/CMSWebsite/Apps/News/Details.aspx?ref=1154
Created by Gregory Williams // 0 threads
More cycle parking is needed in the vicinity of the high street end of St. Margaret's Street in Canterbury. The photo shows that all available space on the stands is already used.
Created by Simon Redding // 1 thread
There's no clear desire line or route west of Linacre/Holymoorside to join up to Chatsworth/Baslow/Rowsley/Beeley. This is a clear link to join Chesterfield mainline rail station to the Peak District.
Campaign for a 300m section of the unguided busway between Milton Road and the pedestrian and cyclists access at the end of Nuffield Close to be built as a road, providing a more direct access for lorries and cars to the trading estate.
Nuffield Road’s residential section should then be cut-off for motorised through traffic just past Discovery Way, turning the first part of Nuffield Road into a residential close.
Petition: http://iitm.be/ChestertonTrafficReduction
Picture Gallery: http://iitm.be/NuffieldRoad
Created by WildNorthlands // 1 thread
Proposal: Demolition of existing buildings and erection of a three/four storey building (including Cinema at third floor level) for use within Classes A1 (Shops), A2 (Financial and Professional Services), A3 (Restaurants and Cafes), A4 (Drinking Establishments), A5 (Hot Food Takeaways) and D2 (Assembly and Leisure), associated infrastructure and ancillary facilities
Location: Block 1 The Moor, Sheffield S1, (Land And Buildings At 16-18, 28-54 The Moor, 25-33 Charter Square, 15 Charter Row, Rockingham Gate And Multi Storey Car Park Rockingham Way), ,
Applicant: Ms Kerri Hunter
Grid Ref: Easting 435137 Northing 386821